| event date = 03/22/2004 19:31 CST
| event date = 03/22/2004 19:31 CST
| last update date = 03/22/2004
| last update date = 03/22/2004
| title = Reactor Scram From 93% Power Due To Generator Trip
| title = Reactor Scram from 93% Power Due to Generator Trip
| event text = The plant had a reactor SCRAM, cause is under investigation with initial indications of a Main Generator over voltage alarm and Generator lockout #2 were indicated on the Generator first hit panel.  All plant systems responded as expected to the generator trip and Reactor SCRAM.    All rods fully inserted and no ECCS actuations or relief valves lifted.  The plant is stable in Mode 3 with the recovery plan being implemented.
| event text = The plant had a reactor SCRAM, cause is under investigation with initial indications of a Main Generator over voltage alarm and Generator lockout #2 were indicated on the Generator first hit panel.  All plant systems responded as expected to the generator trip and Reactor SCRAM.    All rods fully inserted and no ECCS actuations or relief valves lifted.  The plant is stable in Mode 3 with the recovery plan being implemented.
The NRC Resident Inspector was notified.
The NRC Resident Inspector was notified.

Latest revision as of 21:23, 1 March 2018

ENS 40604 +/-
Where
Clinton Constellation icon.png
Illinois (NRC Region 3)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation
Time - Person (Reporting Time:+-2.52 h-0.105 days <br />-0.015 weeks <br />-0.00345 months <br />)
Opened: Edward Beck
23:00 Mar 22, 2004
NRC Officer: Chauncey Gould
Last Updated: Mar 22, 2004