| title = Plant Had Auto Start And Loading Of Two Emergency Diesel Gererators
| title = Plant Had Auto Start and Loading of Two Emergency Diesel Gererators
| event text = On December 31, 2004, at approximately 10:42 Mountain Standard Time (MST) a valid actuation of the Palo Verde Nuclear Generating Station Unit 2 Train A Emergency Diesel Generator (EDG) and Unit 3 Train B EDG occurred as a result of undervoltage on their respective safety buses.  Both EDGs started and loaded as designed.   
| event text = On December 31, 2004, at approximately 10:42 Mountain Standard Time (MST) a valid actuation of the Palo Verde Nuclear Generating Station Unit 2 Train A Emergency Diesel Generator (EDG) and Unit 3 Train B EDG occurred as a result of undervoltage on their respective safety buses.  Both EDGs started and loaded as designed.   
The loss of power to the two safety buses was the result of the deenergization of Startup Transformer X01 when Westwing transmission line #2, one of seven 525 kV transmission lines at the Palo Verde switchyard, relayed off.  Prior to the event, maintenance and testing were in progress on Westwing Line #1.  The apparent cause of the event was inadvertent operation of an adjacent Line #2 protective relay while testing Line #1.
The loss of power to the two safety buses was the result of the deenergization of Startup Transformer X01 when Westwing transmission line #2, one of seven 525 kV transmission lines at the Palo Verde switchyard, relayed off.  Prior to the event, maintenance and testing were in progress on Westwing Line #1.  The apparent cause of the event was inadvertent operation of an adjacent Line #2 protective relay while testing Line #1.

Latest revision as of 21:22, 1 March 2018

ENS 41304 +/-
Where
Palo Verde Arizona Public Service icon.png
Arizona (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(iv)(A), System Actuation
LER: 05000529/LER-2004-003
Regarding Actuation of Plant Emergency Diesel Generators
Time - Person (Reporting Time:+-2.45 h-0.102 days <br />-0.0146 weeks <br />-0.00336 months <br />)
Opened: Brad Robinson
15:15 Dec 31, 2004
NRC Officer: Chauncey Gould
Last Updated: Dec 31, 2004