| issue date = 11/18/2011
| issue date = 11/18/2011
| title = R.E. Ginna Nuclear Power Plant - General License 30-day Cask Registration Notification
| title = R.E. Ginna Nuclear Power Plant - General License 30-day Cask Registration Notification
| author name = Harding T L
| author name = Harding T
| author affiliation = Constellation Energy Group, EDF Group
| author affiliation = Constellation Energy Group, EDF Group
| addressee name =  
| addressee name =  

Revision as of 07:36, 29 June 2019

R.E. Ginna Nuclear Power Plant - General License 30-day Cask Registration Notification
ML11327A144
Person / Time
Site: Ginna, 07201004  Constellation icon.png
Issue date: 11/18/2011
From: Harding T
Constellation Energy Group, EDF Group
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
Download: ML11327A144 (3)


Text

Thomas Harding Licensing Director CENG a joint venture of 0 onstelton

  1. .#'eDF w Energy,01 R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, New York 14519-9364 585.771.5219 585.771.3681 Fax Thomas.HardinqJrC.cenqllc.com November 18, 2011 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:

SUBJECT:

Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards R.E. Ginna Nuclear Power Plant Docket No. 50-244, 72-67 (ISFSI)General License 30-day Cask Registration Notification In accordance with 10 CFR 72.212(b)(2), Constellation Energy Nuclear Group is providing the enclosed information to register the use of two approved spent fuel storage casks at the R.E. Ginna Nuclear Power Plant Independent Spent Fuel Storage Installation (ISFSI).Additionally, pursuant to the General Requirements and Conditions of the Technical Specifications for Certificate of Compliance 1004, §1.1.7 "Special Requirements for First System in Place", a summary is provided of the thermal performance of Dry Shielded Canister (DSC) REG32PT-S125-A16-003 as it represents the highest heat load for the R.E. Ginna ISFSI to date.This letter contains no NRC commitments.

Should you have any questions regarding the information in this letter, please contact me at (585) 771-5219.Very truly yours, Thomas L Harding

Enclosure:

(1) Cask Registration Information cc: W. Dean, NRC D. Pickett, NRC Resident Inspector, NRC (Ginna)A55k~

V -.Enclosure I Cask Registration Information Page 1 of 2 10 CFR 72.212(b)(2)

Required Information Licensee's Name: Address: Reactor License Number: Docket Number: Person Responsible for Providing additional information:

Cask Certificate Number: Certificate Amendment Number: Cask Model Number: Cask Identification Number: R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Rd.Ontario, NY 14519 DPR-18 50-244 72-67 (ISFSI)Mr. Thomas Harding 585-771-5219 1004 10 (Initial Certificate)

NUHOMS-32PT REG32 PT-S 125-A16-003 Thermal Equilibrium Performance Data Calculated Heat Load: 12.24 KW Calculated AT: 61 OF Actual AT (Note 1): 22.4 0 F Horizontal Storage Module (HSM) Information HSM Model: NUHOMS Model 102 HSM Identification Number: REG-HSM5 Note 1: The actual AT represents the maximum measured AT obtained during equilibrium conditions.

These conditions are defined as a daily temperature change of less than 6 0 F over three consecutive days.

& I .-1.Enclosure 1 Cask Registration Information Page 2 of 2 10 CFR 72.212(b)(2)

Required Information Licensee's Name: Address: Reactor License Number: Docket Number: Person Responsible for Providing additional information:

Cask Certificate Number: Certificate Amendment Number: Cask Model Number: Cask Identification Number: R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Rd.Ontario, NY 14519 DPR-18 50-244 72-67 (ISFSI)Mr. Thomas Harding 585-771-5219 1004 10 (Initial Certificate)

NUHOMS-32PT REG32 PT-S 125-A16-006