ENS 48766: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 02/18/2013 05:15 EST
| event date = 02/18/2013 05:15 EST
| last update date = 02/18/2013
| last update date = 02/18/2013
| title = 24 Hour Notification Of Inoperable Scram Discharge Volume Valve Based On Nrc Bulletin 80-14
| title = 24 Hour Notification of Inoperable Scram Discharge Volume Valve Based on Nrc Bulletin 80-14
| event text = On February 18, 2013 at 0515 hours, with the reactor at 100% core thermal power, a scram discharge volume valve, CV-302-22B was declared inoperable as required by station procedural direction due to an observed degradation in opening stroke time during performance of quarterly surveillance testing of the Scram Discharge Instrument Volume Vent and Drain Valves. This action was taken consistent with NRC IE Bulletin 80-14.
| event text = On February 18, 2013 at 0515 hours, with the reactor at 100% core thermal power, a scram discharge volume valve, CV-302-22B was declared inoperable as required by station procedural direction due to an observed degradation in opening stroke time during performance of quarterly surveillance testing of the Scram Discharge Instrument Volume Vent and Drain Valves. This action was taken consistent with NRC IE Bulletin 80-14.
Currently, station engineering is evaluating the valve stroke time trend data of CV-302-22B and a plan to address this issue will be developed as part of the Corrective Action Program.  Pilgrim Technical Specification 3.3.G applies due to the inoperability of CV-302-22B.
Currently, station engineering is evaluating the valve stroke time trend data of CV-302-22B and a plan to address this issue will be developed as part of the Corrective Action Program.  Pilgrim Technical Specification 3.3.G applies due to the inoperability of CV-302-22B.

Latest revision as of 22:01, 1 March 2018

ENS 48766 +/-
Where
Pilgrim
Massachusetts (NRC Region 1)
Reporting
Other Unspec Reqmnt
Time - Person (Reporting Time:+6.25 h0.26 days <br />0.0372 weeks <br />0.00856 months <br />)
Opened: Mike Hettwer
16:30 Feb 18, 2013
NRC Officer: Bill Huffman
Last Updated: Feb 18, 2013
48766 - NRC Website
Loading map...