ML18110A816: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 2: | Line 2: | ||
| number = ML18110A816 | | number = ML18110A816 | ||
| issue date = 05/25/2018 | | issue date = 05/25/2018 | ||
| title = Enclosure 3: TS (App. a, B, and C): | | title = Enclosure 3: TS (App. a, B, and C): (Amendment No. 3 to Renewed Materials License No. SNM-2502 for the H.B. Robinson Steam Electric Plant, Unit No. 2 Independent Spent Fuel Storage Installation) | ||
| author name = Nguyen C N | | author name = Nguyen C N | ||
| author affiliation = NRC/NMSS/DSFM/SFLB | | author affiliation = NRC/NMSS/DSFM/SFLB | ||
Revision as of 08:04, 9 April 2019
| ML18110A816 | |
| Person / Time | |
|---|---|
| Site: | 07200003 |
| Issue date: | 05/25/2018 |
| From: | Nguyen C N Spent Fuel Licensing Branch |
| To: | Kapopoulos E J H B Robinson Steam Electric Plant |
| Nguyen C N | |
| Shared Package | |
| ML18110A812 | List: |
| References | |
| EPID L-2017-LLA-0114 | |
| Download: ML18110A816 (22) | |