{{#Wiki_filter:Adam C. Heflin, President, Chief Executive Officer, and Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 EAST LAMAR BOULEVARD ARLINGTON, TEXAS 76011-4511 May 29, 2018 Wolf Creek Nuclear Operating Corporation P.O. Box411 Burlington, KS 66839 SUBJECT: ERRATA FOR WOLF CREEK NUCLEAR OPERATING CORPORATION -NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000482/2018002) AND REQUEST FOR INFORMATION Dear Mr. Heflin: It was identified that the notification sent to you dated April 25, 2018 (NRC's Agencywide Documents Access and Management System (ADAMS) Accession No. ML18116A613) improperly listed the inspection report number as 05000482/2018002. The correct inspection report number is 05000482/2018003. Please note none of the content of the request for information has changed. The NRC has reissued the notification in its entirety to correct this error. This fetter, its enclosure, and your response (if any) will be made available for public inspection and copying at http:/!www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." Docket No. 50-482 License No. NPF-42 Enclosure: Sincerely, IRA/ Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety WOLF CREEK NUCLEAR OPERA TING CORPORATION -NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000482/2018003) AND REQUEST FOR INFORMATION cc: Electronic Distribution   
{{#Wiki_filter:Adam C. Heflin, President,  
 
Chief Executive  
ML 18145A249 SUNSI Review [&] Non-Sensitive Publicly Available Bv: JCK CJ Sensitive CJ Non-Publiclv Available OFFICE SOE:OB C:OB NAME JKiridand VGaddy SIGNATURE IRA/ IRA/ DATE 05/29/18 05/29/18 
Officer,  
Adam C. Heflin, President, Chief Executive Officer, and Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY COMMISSION REGJON IV 1600 EAST LAMAR BOULEVARD ARLINGTON. TEXAS 76011-4511 May 29, 2018 Wolf Creek Nuclear Operating Corporation P.O. Box411 Burlington, KS 66839 SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION -NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000482/2018003) AND REQUEST FOR INFORMATION Dear Mr. Heflin: The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) staff will conduct a biennial requalification inspection at the Wolf Creek Nuclear Operating Corporation from June 4 -7, 2018. The inspection will consist of two reactor inspectors from the NRC's Region IV office for one week. The inspection will be conducted in accordance with the NRC Inspection Procedure {IP) 71111.11 B, "Licensed Operator Requalification Program." Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into three groups. The first group (Section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared. The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site. The third group {Section C of this enclosure) identifies the items which are necessary to close out the inspection and are usually sent a few weeks after the team has left the site. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Ms. Lucille Stone. Our inspection dates are subject to change based on your updated schedule of examination activities. If there are any questions about this inspection or the material requested, please contact the lead inspector, John Kirkland, at (817) 200-1771 (John.Kirkland@nrc.gov). This letter does not contain new or amended information collection requirements subject To the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0018.
and Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY  
A. Heflin 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC web site at rm/adams.html (the Public Electronic Reading Room). Docket No. 50-482 License No. NPF-42 Enclosure: Request for Information cc: Electronic Distribution Sincerely, IRA! Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety 
COMMISSION  
Inspection Report: Inspection Dates: Initial Request for Information Biennial Requalification Inspection Wolf Creek Generating Station 05000482/2018003 June 4-7, 2018 Inspection Procedure: IP 71111.11 B, "Licensed Operator Requalification Program" Lead Inspector: John Kirkland, Senior Operations Engineer A. The following information is requested In order to support inspection preparation activities. These items are fisted by section as they appear in the inspection module (ie 2.02, 2.04, etc). Requested materf als should be sent either electronically or CD/DVD ( do not send USB drives) in order to arrive at the Region IV office no later than May 14, 2018. * Electronically: To: John.Kirkland@nrc.gov cc: Clyde.Osterholtz@nrc.gov * CD/DVD to: U.S. Nuclear Regulatory Commission Region IV General Bequests: ATTN: John Kirkland 1600 E. Lamar Blvd Arlington, TX 76011 * List of licensed operators (SRO and RO) by crew (operating and staff) * Training and Operations Department organization charts (with qualified LOR evaluators identified) * Procedures that identify process for revising and maintaining LO continuing training program up-to-date * List of outstanding LOR program changes * List of plant events and industry operating experience incorporated into LOR program since last BRQ * Audits and/or self-assessment reports addressing the licensed operator requalification training program * Last 2-years of simulator review committee (or equivalent) meeting minutes Enclosure 
REGION IV 1600 EAST LAMAR BOULEVARD  
* Last 2-years of CRC (or equivalent) meeting minutes 2.3 Biennial Regualification Written Examination Qual!h'. * The current and approved biennial written examination schedule * The current requalification cycle written examination results for both SRO and RO that have already been administered up to the week prior to the inspection team arrival on-site * All.written examinations that have been approved for administration up to and including the week before the inspection team is on-site. This will need to have adequate password protection if e-mailed or double envelope protection if mailed via regular mail per NUREG-1021. * The current requalification cycle examination methodology (sample plan} 2.4 Annual Regualification Operating Test Quality 2.5 2.6 * The schedule for the operating tests (JPMs and scenarios) to be given the week of June 4, 2018 * The operating tests (JPMs and scenarios) (password protected and provide separately via telephone at later date) to be given the week of June 4, 2018 * Current requalification cycle operating tests (SRO and RO) and results up to the week prior to the inspection team arrival on-site (NIA if the inspection week is the first week of testing) * All.of the previous year's NRC required annual operating tests * Current requalification cycle operating test methodology (sample plan) * All portions of the updated Final Safety Analysis Report (FSAR) that identify operator response times for time critical operator actions Licensee Admin of Requalification Exams * All procedures used to administer the annual operating test * All procedures used to assess operator perfomiance * All procedures that describe conduct of simulator training * All procedures used to test, operate, and maintain the simulator Regualification Examination Secur~ * Submit any tracking tools that you use as a means to prevent excessive overlap on the written examinations and also meet the intent of sampling all required topics on a periodic basis * Submit any tracking tools that you use as a means to prevent excessive overlap on 2 
ARLINGTON,  
the operating tests and also meet the intent of sampling all required malfunctions (including major events, instrument/component malfunctions, TS calls, etc.) on a periodic basis * All procedures that describe examination security, including procedures used to develop the examinations that include guidelines on overlap between examinations in current exam cycle tests and prior year examinations * List of all condition reports since the last biennial requalification inspection related to examination security and overlap 2.7 Licensee Remedial Training Program 2.8 2.9 * List of remedial training conducted or planned since last requalification exams (includes training provided to operators to enable passing requalification exams and training provided to correct generic or individual weaknesses observed during previous requalification exam cycle) * Remediation plans (lesson plans, reference materials, and attendance documentation) Conformance with Operator License Conditions * All procedures and program documentation for maintaining active operator licenses, tracking training attendance, and ensuring medical fitness of licensed operators * All procedures and associated documentation that supports reactivation of any SRO/RO license (operating or staff crew) since the last biennial inspection Simulator Performance * For the following cases, send the most recent transient test packages, which may be electronic or in paper single test packages, and shall be complete with test procedures for each test, the acceptance criteria, and results. For each transient test, the reference chart should be included or an equivalent subject matter expert review versus the simulator results with a write-up for any differences beyond the ANSI 3.5 standard requirements. o Transient test 1, manual reactor trip o Transient test 5, trip of any single reactor coolant pump o Transient test 8, maximum size RCS rupture combined with loss of all offsite power o Steady state tests for low power * SBT Packages for any three scenarios used for the 2017 Annual Requalification Operating Test 3 
TEXAS 76011-4511  
* All Simulator Management and Configuration Procedures if not already provided for Section 02.05 above * Simulator Discrepancy Report (DR) summacx list for all open DRs. For closed DRs, summary list for those items closed between June 2016 to May 2018 * Malfunction tests for loss of condenser vacuum and reactor pressure control system failure. If these are included in an SBT package then the review of that package would be acceptable * Two examples of primary parameters tested in order to verify core physics parameters. The applicable reference grf}phs from the plant physics data book (electronic or other means as available) should also be included as well as the test procedures used and the acceptance criteria with results. * All simulator modification packages that are on hold, delayed, or just not completed in the last 2-years * A list of simulator modification packages completed in the last 2-year window 2.10 Problem Identification and Resolution * A summary report of all condition reports related to operator actions/errors in the control room * Any revised requalification training that was based on licensed operator performance issues B. The following information is requested in order to support the on-site inspection activities. Requested materials should be available to the inspection team, either electronically or hardcopy, upon site arrival on June 4, 2018. 2.2 2.8 2.9 Exam Results / 02.03 and 02.04: Written Exam and Op Test Qualit'l * All Operating tests (JPMs and scenarios) to be given in all subsequent weeks after on-site week * All results up to the day the team leaves the site Conformance with Operator License Conditions * Access to licensed operators' records ( operating and staff crews) * Access to licensed operators' training attendance records * Access to licensed operators' medical records Simulator Performance * Simulator discrepancy reports (DRs) from June 2016 to May 2018. This should include all open DR's and DR's that have been closed, including the documentation/justification for closure. 4 
May 29, 2018 Wolf Creek Nuclear Operating  
* Acceptance test documentation, including hardware and software model revisions at the time of acceptance (as available) * Documentation that validates current models, including the thermal*hydraulics and neutronics models, to the actual plant * All current model deficiencies, including FSAR vs. Design differences in the simulator (any documentation on this) * Summary list of modifications from June 2016 to May 2018 * Plant modifications (both hardware and software) completed on the simulator by due date from June 2016 to May 2018 * Simulator Differences Lesson plan used in training (current to June 4, 2018) * The complete book of all simulator annual performance test packages (usually in a single book, but may be electronic or in single test packages), complete with all transient tests, steady state tests, and malfunction tests. This should also include the test procedures for each test, the acceptance criteria, and results. For each transient test, the reference chart should be included or an equivalent subject matter expert review versus the simulator results with a write-up for any differences beyond the ANSI standard requirements. * All test packages used to verify core physics parameters. The applicable reference graphs from the plant physics data book ( electronic or other means as available) should also be included as well as the test procedures used and the acceptance criteria with results. * All simulator test, configuration management, and related documents available in the room for inspectors to review. This includes training needs analysis packages, simulator review committee meeting minutes, etc. * Current copy of ANSI 3.5 standard you are committed to for simulator testing 2.10 Problem Identification and Resolution * All condition reports related to operator actions/errors in the control room C. Wolf Creek Nuclear Operating Corporation is required to send the final results summary, and any remaining exams and operating tests that have not been reviewed to the Regional office lead inspector for this inspection for final review and comparison against the significance determination tools in order to communicate the exit results for the inspection. 5
Corporation  
P.O. Box411 Burlington,  
KS 66839 SUBJECT:  
ERRATA FOR WOLF CREEK NUCLEAR OPERATING  
CORPORATION  
-NOTIFICATION  
OF INSPECTION  
(NRC INSPECTION  
REPORT 05000482/2018002)  
AND REQUEST FOR INFORMATION  
Dear Mr. Heflin: It was identified  
that the notification  
sent to you dated April 25, 2018 (NRC's Agencywide  
Documents  
Access and Management  
System (ADAMS) Accession  
No. ML18116A613)  
improperly  
listed the inspection  
report number as 05000482/2018002.  
The correct inspection  
report number is 05000482/2018003.  
Please note none of the content of the request for information has changed.  
The NRC has reissued  
the notification  
in its entirety  
to correct this error. This fetter, its enclosure,  
and your response  
(if any) will be made available  
for public inspection  
and copying at http:/!www.nrc.gov/reading-rm/adams.html  
and at the NRC Public Document  
Room in accordance  
with 10 CFR 2.390, "Public Inspections,  
Exemptions,  
Requests  
for Withholding."  
Docket No. 50-482 License No. NPF-42 Enclosure:  
Sincerely,  
IRA/ Vincent G. Gaddy, Chief Operations  
Branch Division  
of Reactor Safety WOLF CREEK NUCLEAR OPERA TING CORPORATION  
-NOTIFICATION  
OF INSPECTION  
(NRC INSPECTION  
REPORT 05000482/2018003)  
AND REQUEST FOR INFORMATION  
cc: Electronic  
Distribution   
A. Heflin 2 ERRATA FOR WOLF CREEK NUCLEAR OPERATING
CORPORATION
-NOTIFICATION
OF INSPECTION
(NRC INSPECTION
REPORT 05000482/2018002)
AND REQUEST FOR INFORMATION-
DATED MAY 29, 2018 DISTRIBUTION:  
KKennedy,
ORA SMorris,
ORA TVegel, DRP Rlantz, DRP MShaffer,
DRS JClark, DRS DDodson,  
DRP FThomas,  
DRP NTaylor,  
DRP DProulx,
DRP JMelfi,DRP
ECombs, DRP SGalemore,
DRP VDricks,
ORA BSingal,
NRR GGeorge,
DRS EUribe, DRS MHerrera,  
DRMA R4Enforcement
SKirkwood,
OGC JWeil, OWFN AMoreno,
OWFN JBowen, OEDO BMaier, ORA ADAMS ACCESSION
NUMBER: ML 18145A249 SUNSI Review [&] Non-Sensitive Publicly
Available
Bv: JCK CJ Sensitive
CJ Non-Publiclv
Available OFFICE SOE:OB
C:OB NAME JKiridand
VGaddy SIGNATURE
IRA/ IRA/ DATE 05/29/18
05/29/18
OFFICIAL
RECORD COPY Keyword:
NRC-002 
Adam C. Heflin, President,  
Chief Executive
Officer,
and Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY
COMMISSION
REGJON IV 1600 EAST LAMAR BOULEVARD
ARLINGTON.
TEXAS 76011-4511
May 29, 2018 Wolf Creek Nuclear Operating
Corporation
P.O. Box411 Burlington,
KS 66839 SUBJECT:
WOLF CREEK NUCLEAR OPERATING
CORPORATION
-NOTIFICATION
OF INSPECTION
(NRC INSPECTION
REPORT 05000482/2018003)  
AND REQUEST FOR INFORMATION
Dear Mr. Heflin: The purpose of this letter is to notify you that the U.S. Nuclear Regulatory
Commission
(NRC) staff will conduct a biennial
requalification
inspection
at the Wolf Creek Nuclear Operating
Corporation
from June 4 -7, 2018. The inspection
will consist of two reactor inspectors
from the NRC's Region IV office for one week. The inspection  
will be conducted
in accordance
with the NRC Inspection
Procedure
{IP) 71111.11
B, "Licensed
Operator
Requalification
Program."
Experience
has shown that this inspection
is a resource
intensive
inspection
both for the NRC inspectors
and your staff. In order to minimize
the impact to your on-site resources
and to ensure a productive
inspection,
we have enclosed
a request for documents
needed for this inspection.  
These documents
have been divided into three groups. The first group (Section
A of the enclosure)
identifies
information
to be provided
prior to the inspection  
to ensure that the inspectors
are adequately
prepared.
The second group (Section
B of the enclosure)
identifies
the information
the inspectors
will need upon arrival at the site. The third group {Section
C of this enclosure)  
identifies
the items which are necessary
to close out the inspection
and are usually sent a few weeks after the team has left the site. It is important
that all of these documents
are up-to-date
and complete
in order to minimize
the number of additional
documents
requested
during the preparation
and/or the on-site portions
of the inspection.
We have discussed
the schedule
for these inspection  
activities
with your staff and understand
that our regulatory
contact for this inspection
will be Ms. Lucille Stone. Our inspection
dates are subject to change based on your updated schedule
of examination
activities.  
If there are any questions
about this inspection
or the material
requested,
please contact the lead inspector
, John Kirkland,
at (817) 200-1771
(John.Kirkland@nrc.gov
). This letter does not contain new or amended information
collection
requirements
subject To the Paperwork
Reduction
Act of 1995 (44 U.S.C. 3501 et seq.). Existing
information  
collection
requirements
were approved
by the Office of Management
and Budget, control number 3150-0018.
A. Heflin 2 The NRC may not conduct or sponsor,
and a person is not required
to respond to, a request for information
or an information
collection
requirement
unless the requesting
document
displays
a currently
valid Office of Management
and Budget control number. In accordance
with 10 CFR 2.390 of the NRC's "Agency Rules of Practice,"
a copy of this letter and its enclosure
will be available
electronically
for public inspection
in the NRC Public Document
Room or from the Publicly
Available
Records (PARS) component
of NRC's document
system (ADAMS).
ADAMS is accessible
from the NRC web site at
rm/adams.html
(the Public Electronic
Reading Room). Docket No. 50-482 License No. NPF-42 Enclosure:
Request for Information
cc: Electronic
Distribution
Sincerely,
IRA! Vincent G. Gaddy, Chief Operations
Branch Division
of Reactor Safety 
Inspection
Report: Inspection
Dates: Initial Request for Information
Biennial
Requalification
Inspection
Wolf Creek Generating
Station 05000482/2018003
June 4-7, 2018 Inspection
Procedure:
IP 71111.11
B, "Licensed
Operator
Requalification
Program"
Lead Inspector:
John Kirkland,
Senior Operations
Engineer
A. The following
information
is requested
In order to support inspection  
preparation
activities.  
These items are fisted by section as they appear in the inspection  
module (ie 2.02, 2.04,
etc). Requested
materf als should be sent either electronically
or CD/DVD ( do not send USB drives) in order to arrive at the Region IV office no later than May 14, 2018. * Electronically:
To: John.Kirkland@nrc.gov
cc: Clyde.Osterholtz@nrc.gov
* CD/DVD to: U.S. Nuclear Regulatory
Commission
Region IV General Bequests:
ATTN: John Kirkland
1600 E. Lamar Blvd Arlington,
TX 76011 * List of licensed
operators
(SRO and RO) by crew (operating
and staff) * Training
and Operations
Department
organization
charts (with qualified
LOR evaluators
identified)  
* Procedures
that identify
process for revising
and maintaining
LO continuing
training
program up-to-date
* List of outstanding
LOR program changes * List of plant events and industry
operating  
experience
incorporated
into LOR program since last BRQ * Audits and/or self-assessment
reports addressing
the licensed
operator
requalification  
training
program * Last 2-years of simulator
review committee
(or equivalent)  
meeting minutes Enclosure 
* Last 2-years of CRC (or equivalent)  
meeting minutes 2.3 Biennial
Regualification
Written Examination
Qual!h'.
* The current and approved
biennial
written examination
schedule
* The current requalification
cycle written examination
results for both SRO and RO that have already been administered
up to the week prior to the inspection
team arrival on-site * All.written
examinations
that have been approved
for administration
up to and including
the week before the inspection
team is on-site.
This will need to have adequate
password
protection
if e-mailed
or double envelope
protection
if mailed via regular mail per NUREG-1021.  
* The current requalification
cycle examination  
methodology
(sample plan} 2.4 Annual Regualification
Operating
Test Quality 2.5 2.6 * The schedule
for the operating
tests (JPMs and scenarios)
to be given the week of June 4, 2018 * The operating
tests (JPMs and scenarios)
(password
protected
and provide separately
via telephone
at later date) to be given the week of June 4, 2018 * Current requalification  
cycle operating
tests (SRO and RO) and results up to the week prior to the inspection
team arrival on-site (NIA if the inspection
week is the first week of testing)  
* All.of the previous
year's NRC required
annual operating
tests * Current requalification
cycle operating
test methodology
(sample plan) * All portions
of the updated Final Safety Analysis
Report (FSAR) that identify
operator
response
times for time critical
operator
actions Licensee
Admin of Requalification
Exams * All procedures  
used to administer
the annual operating
test * All procedures
used to assess operator
perfomiance
* All procedures
that describe
conduct of simulator
training
* All procedures
used to test, operate,  
and maintain
the simulator  
Regualification
Examination
Secur~ * Submit any tracking
tools that you use as a means to prevent excessive
overlap on the written examinations
and also meet the intent of sampling
all required
topics on a periodic
basis * Submit any tracking
tools that you use as a means to prevent excessive
overlap on 2 
the operating
tests and also meet the intent of sampling
all required
malfunctions
(including
major events, instrument/component
malfunctions,
TS calls, etc.) on a periodic
basis * All procedures
that describe
examination
security,  
including
procedures
used to develop the examinations
that include guidelines
on overlap between examinations
in current exam cycle tests and prior year examinations
* List of all condition
reports since the last biennial
requalification
inspection
related to examination
security
and overlap 2.7 Licensee
Remedial
Training
Program 2.8 2.9 * List of remedial
training
conducted
or planned since last requalification
exams (includes
training
provided
to operators
to enable passing requalification
exams and training
provided
to correct generic or individual
weaknesses
observed
during previous
requalification
exam cycle) * Remediation
plans (lesson plans, reference
materials,  
and attendance
documentation)
Conformance
with Operator
License Conditions
* All procedures
and program documentation
for maintaining
active operator
licenses,  
tracking
training
attendance,
and ensuring
medical fitness of licensed
operators
* All procedures
and associated
documentation
that supports
reactivation
of any SRO/RO license (operating
or staff crew) since the last biennial
inspection
Simulator
Performance
* For the following
cases, send the most recent transient
test packages,
which may be electronic
or in paper single test packages,
and shall be complete
with test procedures
for each test, the acceptance
criteria,
and results.
For each transient
test, the reference chart
should be included
or an equivalent
subject matter expert review versus the simulator
results with a write-up
for any differences
beyond the ANSI 3.5 standard
requirements.
o Transient
test 1, manual reactor trip o Transient
test 5, trip of any single reactor coolant pump o Transient
test 8, maximum size RCS rupture combined
with loss of all offsite power o Steady state tests for low power * SBT Packages
for any three scenarios
used for the 2017 Annual Requalification
Operating
Test 3 
* All Simulator
Management
and Configuration
Procedures
if not already provided
for Section 02.05 above * Simulator
Discrepancy
Report (DR) summacx list for all open DRs. For closed DRs, summary list for those items closed between June 2016 to May 2018 * Malfunction
tests for loss of condenser
vacuum and reactor pressure
control system failure.
If these are included
in an SBT package then the review of that package would be acceptable
* Two examples
of primary parameters
tested in order to verify core physics parameters.
The applicable
reference
grf}phs from the plant physics data book (electronic  
or other means as available)  
should also be included
as well as the test procedures  
used and the acceptance  
criteria  
with results.  
* All simulator
modification
packages
that are on hold, delayed,  
or just not completed
in the last 2-years * A list of simulator
modification
packages  
completed
in the last 2-year window 2.10 Problem Identification
and Resolution * A summary report of all condition
reports related to operator
actions/errors
in the control room * Any revised requalification
training
that was based on licensed
operator
performance
issues B. The following
information
is requested
in order to support the on-site inspection
activities.
Requested
materials
should be available
to the inspection
team, either electronically
or hardcopy,
upon site arrival on June 4, 2018. 2.2 2.8 2.9 Exam Results / 02.03 and 02.04: Written Exam and Op Test Qualit'l
* All Operating
tests (JPMs and scenarios)
to be given in all subsequent
weeks after on-site week * All results up to the day the team leaves the site Conformance
with Operator
License Conditions
* Access to licensed
operators'
records ( operating
and staff crews) * Access to licensed
operators'
training
attendance
records * Access to licensed
operators'
medical records Simulator
Performance
* Simulator
discrepancy
reports (DRs) from June 2016 to May 2018. This should include all open DR's and DR's that have been closed, including
the documentation/justification
for closure.
* Acceptance
test documentation,
including
hardware
and software
model revisions
at the time of acceptance
(as available)
* Documentation
that validates
current models, including
the thermal*hydraulics
and neutronics
models, to the actual plant * All current model deficiencies,
including
FSAR vs. Design differences
in the simulator
(any documentation
on this) * Summary list of modifications
from June 2016 to May 2018 * Plant modifications
(both hardware
and software)
completed
on the simulator
by due date from June 2016 to May 2018 * Simulator
Differences
Lesson plan used in training
(current
to June 4, 2018) * The complete
book of all simulator
annual performance
test packages
(usually
in a single book, but may be electronic
or in single test packages),
complete
with all transient
tests, steady state tests, and malfunction
tests. This should also include the test procedures
for each test, the acceptance
criteria,
and results.
For each transient
test, the reference
chart should be included
or an equivalent
subject matter expert review versus the simulator
results with a write-up
for any differences
beyond the ANSI standard
requirements.
* All test packages
used to verify core physics parameters.
The applicable
reference
graphs from the plant physics data book ( electronic
or other means as available)
should also be included
as well as the test procedures
used and the acceptance
criteria
with results.
* All simulator
test, configuration
management,
and related documents
available
in the room for inspectors
to review. This includes
training
needs analysis
packages,
simulator
review committee
meeting minutes,
etc. * Current copy of ANSI 3.5 standard
you are committed
to for simulator
testing 2.10 Problem Identification
and Resolution
* All condition  
reports related to operator  
actions/errors  
in the control room C. Wolf Creek Nuclear Operating  
Corporation  
is required  
to send the final results summary,  
and any remaining  
exams and operating  
tests that have not been reviewed  
to the Regional  
office lead inspector  
for this inspection  
for final review and comparison  
against the significance  
determination  
tools in order to communicate  
the exit results for the inspection.  
5
}}
}}

Revision as of 22:15, 28 June 2018

Errata for Wolf Creek Nuclear Operating Corporation - Notification of Inspection (NRC Inspection Report 05000482/2018002) and Request for Information
ML18145A249
Person / Time
Site: Wolf Creek 
Issue date: 05/29/2018
From: Vincent Gaddy
Operations Branch IV
To: Heflin A C
Wolf Creek
References
IR 2018002
Download: ML18145A249 (9)


See also: IR 05000482/2018002

Text

Adam C. Heflin, President,

Chief Executive

Officer,

and Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY

COMMISSION

REGION IV 1600 EAST LAMAR BOULEVARD

ARLINGTON,

TEXAS 76011-4511

May 29, 2018 Wolf Creek Nuclear Operating

Corporation

P.O. Box411 Burlington,

KS 66839 SUBJECT:

ERRATA FOR WOLF CREEK NUCLEAR OPERATING

CORPORATION

-NOTIFICATION

OF INSPECTION

(NRC INSPECTION

REPORT 05000482/2018002)

AND REQUEST FOR INFORMATION

Dear Mr. Heflin: It was identified

that the notification

sent to you dated April 25, 2018 (NRC's Agencywide

Documents

Access and Management

System (ADAMS) Accession

No. ML18116A613)

improperly

listed the inspection

report number as 05000482/2018002.

The correct inspection

report number is 05000482/2018003.

Please note none of the content of the request for information has changed.

The NRC has reissued

the notification

in its entirety

to correct this error. This fetter, its enclosure,

and your response

(if any) will be made available

for public inspection

and copying at http:/!www.nrc.gov/reading-rm/adams.html

and at the NRC Public Document

Room in accordance

with 10 CFR 2.390, "Public Inspections,

Exemptions,

Requests

for Withholding."

Docket No. 50-482 License No. NPF-42 Enclosure:

Sincerely,

IRA/ Vincent G. Gaddy, Chief Operations

Branch Division

of Reactor Safety WOLF CREEK NUCLEAR OPERA TING CORPORATION

-NOTIFICATION

OF INSPECTION

(NRC INSPECTION

REPORT 05000482/2018003)

AND REQUEST FOR INFORMATION

cc: Electronic

Distribution

A. Heflin 2 ERRATA FOR WOLF CREEK NUCLEAR OPERATING

CORPORATION

-NOTIFICATION

OF INSPECTION

(NRC INSPECTION

REPORT 05000482/2018002)

AND REQUEST FOR INFORMATION-

DATED MAY 29, 2018 DISTRIBUTION:

KKennedy,

ORA SMorris,

ORA TVegel, DRP Rlantz, DRP MShaffer,

DRS JClark, DRS DDodson,

DRP FThomas,

DRP NTaylor,

DRP DProulx,

DRP JMelfi,DRP

ECombs, DRP SGalemore,

DRP VDricks,

ORA BSingal,

NRR GGeorge,

DRS EUribe, DRS MHerrera,

DRMA R4Enforcement

SKirkwood,

OGC JWeil, OWFN AMoreno,

OWFN JBowen, OEDO BMaier, ORA ADAMS ACCESSION

NUMBER: ML 18145A249 SUNSI Review [&] Non-Sensitive Publicly

Available

Bv: JCK CJ Sensitive

CJ Non-Publiclv

Available OFFICE SOE:OB

C:OB NAME JKiridand

VGaddy SIGNATURE

IRA/ IRA/ DATE 05/29/18

05/29/18

OFFICIAL

RECORD COPY Keyword:

NRC-002

Adam C. Heflin, President,

Chief Executive

Officer,

and Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY

COMMISSION

REGJON IV 1600 EAST LAMAR BOULEVARD

ARLINGTON.

TEXAS 76011-4511

May 29, 2018 Wolf Creek Nuclear Operating

Corporation

P.O. Box411 Burlington,

KS 66839 SUBJECT:

WOLF CREEK NUCLEAR OPERATING

CORPORATION

-NOTIFICATION

OF INSPECTION

(NRC INSPECTION

REPORT 05000482/2018003)

AND REQUEST FOR INFORMATION

Dear Mr. Heflin: The purpose of this letter is to notify you that the U.S. Nuclear Regulatory

Commission

(NRC) staff will conduct a biennial

requalification

inspection

at the Wolf Creek Nuclear Operating

Corporation

from June 4 -7, 2018. The inspection

will consist of two reactor inspectors

from the NRC's Region IV office for one week. The inspection

will be conducted

in accordance

with the NRC Inspection

Procedure

{IP) 71111.11

B, "Licensed

Operator

Requalification

Program."

Experience

has shown that this inspection

is a resource

intensive

inspection

both for the NRC inspectors

and your staff. In order to minimize

the impact to your on-site resources

and to ensure a productive

inspection,

we have enclosed

a request for documents

needed for this inspection.

These documents

have been divided into three groups. The first group (Section

A of the enclosure)

identifies

information

to be provided

prior to the inspection

to ensure that the inspectors

are adequately

prepared.

The second group (Section

B of the enclosure)

identifies

the information

the inspectors

will need upon arrival at the site. The third group {Section

C of this enclosure)

identifies

the items which are necessary

to close out the inspection

and are usually sent a few weeks after the team has left the site. It is important

that all of these documents

are up-to-date

and complete

in order to minimize

the number of additional

documents

requested

during the preparation

and/or the on-site portions

of the inspection.

We have discussed

the schedule

for these inspection

activities

with your staff and understand

that our regulatory

contact for this inspection

will be Ms. Lucille Stone. Our inspection

dates are subject to change based on your updated schedule

of examination

activities.

If there are any questions

about this inspection

or the material

requested,

please contact the lead inspector

, John Kirkland,

at (817) 200-1771

(John.Kirkland@nrc.gov

). This letter does not contain new or amended information

collection

requirements

subject To the Paperwork

Reduction

Act of 1995 (44 U.S.C. 3501 et seq.). Existing

information

collection

requirements

were approved

by the Office of Management

and Budget, control number 3150-0018.

A. Heflin 2 The NRC may not conduct or sponsor,

and a person is not required

to respond to, a request for information

or an information

collection

requirement

unless the requesting

document

displays

a currently

valid Office of Management

and Budget control number. In accordance

with 10 CFR 2.390 of the NRC's "Agency Rules of Practice,"

a copy of this letter and its enclosure

will be available

electronically

for public inspection

in the NRC Public Document

Room or from the Publicly

Available

Records (PARS) component

of NRC's document

system (ADAMS).

ADAMS is accessible

from the NRC web site at

rm/adams.html

(the Public Electronic

Reading Room). Docket No. 50-482 License No. NPF-42 Enclosure:

Request for Information

cc: Electronic

Distribution

Sincerely,

IRA! Vincent G. Gaddy, Chief Operations

Branch Division

of Reactor Safety

Inspection

Report: Inspection

Dates: Initial Request for Information

Biennial

Requalification

Inspection

Wolf Creek Generating

Station 05000482/2018003

June 4-7, 2018 Inspection

Procedure:

IP 71111.11

B, "Licensed

Operator

Requalification

Program"

Lead Inspector:

John Kirkland,

Senior Operations

Engineer

A. The following

information

is requested

In order to support inspection

preparation

activities.

These items are fisted by section as they appear in the inspection

module (ie 2.02, 2.04,

etc). Requested

materf als should be sent either electronically

or CD/DVD ( do not send USB drives) in order to arrive at the Region IV office no later than May 14, 2018. * Electronically:

To: John.Kirkland@nrc.gov

cc: Clyde.Osterholtz@nrc.gov

  • CD/DVD to: U.S. Nuclear Regulatory

Commission

Region IV General Bequests:

ATTN: John Kirkland

1600 E. Lamar Blvd Arlington,

TX 76011 * List of licensed

operators

(SRO and RO) by crew (operating

and staff) * Training

and Operations

Department

organization

charts (with qualified

LOR evaluators

identified)

  • Procedures

that identify

process for revising

and maintaining

LO continuing

training

program up-to-date

  • List of outstanding

LOR program changes * List of plant events and industry

operating

experience

incorporated

into LOR program since last BRQ * Audits and/or self-assessment

reports addressing

the licensed

operator

requalification

training

program * Last 2-years of simulator

review committee

(or equivalent)

meeting minutes Enclosure

  • Last 2-years of CRC (or equivalent)

meeting minutes 2.3 Biennial

Regualification

Written Examination

Qual!h'.

  • The current and approved

biennial

written examination

schedule

  • The current requalification

cycle written examination

results for both SRO and RO that have already been administered

up to the week prior to the inspection

team arrival on-site * All.written

examinations

that have been approved

for administration

up to and including

the week before the inspection

team is on-site.

This will need to have adequate

password

protection

if e-mailed

or double envelope

protection

if mailed via regular mail per NUREG-1021.

  • The current requalification

cycle examination

methodology

(sample plan} 2.4 Annual Regualification

Operating

Test Quality 2.5 2.6 * The schedule

for the operating

tests (JPMs and scenarios)

to be given the week of June 4, 2018 * The operating

tests (JPMs and scenarios)

(password

protected

and provide separately

via telephone

at later date) to be given the week of June 4, 2018 * Current requalification

cycle operating

tests (SRO and RO) and results up to the week prior to the inspection

team arrival on-site (NIA if the inspection

week is the first week of testing)

  • All.of the previous

year's NRC required

annual operating

tests * Current requalification

cycle operating

test methodology

(sample plan) * All portions

of the updated Final Safety Analysis

Report (FSAR) that identify

operator

response

times for time critical

operator

actions Licensee

Admin of Requalification

Exams * All procedures

used to administer

the annual operating

test * All procedures

used to assess operator

perfomiance

  • All procedures

that describe

conduct of simulator

training

  • All procedures

used to test, operate,

and maintain

the simulator

Regualification

Examination

Secur~ * Submit any tracking

tools that you use as a means to prevent excessive

overlap on the written examinations

and also meet the intent of sampling

all required

topics on a periodic

basis * Submit any tracking

tools that you use as a means to prevent excessive

overlap on 2

the operating

tests and also meet the intent of sampling

all required

malfunctions

(including

major events, instrument/component

malfunctions,

TS calls, etc.) on a periodic

basis * All procedures

that describe

examination

security,

including

procedures

used to develop the examinations

that include guidelines

on overlap between examinations

in current exam cycle tests and prior year examinations

  • List of all condition

reports since the last biennial

requalification

inspection

related to examination

security

and overlap 2.7 Licensee

Remedial

Training

Program 2.8 2.9 * List of remedial

training

conducted

or planned since last requalification

exams (includes

training

provided

to operators

to enable passing requalification

exams and training

provided

to correct generic or individual

weaknesses

observed

during previous

requalification

exam cycle) * Remediation

plans (lesson plans, reference

materials,

and attendance

documentation)

Conformance

with Operator

License Conditions

  • All procedures

and program documentation

for maintaining

active operator

licenses,

tracking

training

attendance,

and ensuring

medical fitness of licensed

operators

  • All procedures

and associated

documentation

that supports

reactivation

of any SRO/RO license (operating

or staff crew) since the last biennial

inspection

Simulator

Performance

  • For the following

cases, send the most recent transient

test packages,

which may be electronic

or in paper single test packages,

and shall be complete

with test procedures

for each test, the acceptance

criteria,

and results.

For each transient

test, the reference chart

should be included

or an equivalent

subject matter expert review versus the simulator

results with a write-up

for any differences

beyond the ANSI 3.5 standard

requirements.

o Transient

test 1, manual reactor trip o Transient

test 5, trip of any single reactor coolant pump o Transient

test 8, maximum size RCS rupture combined

with loss of all offsite power o Steady state tests for low power * SBT Packages

for any three scenarios

used for the 2017 Annual Requalification

Operating

Test 3

  • All Simulator

Management

and Configuration

Procedures

if not already provided

for Section 02.05 above * Simulator

Discrepancy

Report (DR) summacx list for all open DRs. For closed DRs, summary list for those items closed between June 2016 to May 2018 * Malfunction

tests for loss of condenser

vacuum and reactor pressure

control system failure.

If these are included

in an SBT package then the review of that package would be acceptable

  • Two examples

of primary parameters

tested in order to verify core physics parameters.

The applicable

reference

grf}phs from the plant physics data book (electronic

or other means as available)

should also be included

as well as the test procedures

used and the acceptance

criteria

with results.

  • All simulator

modification

packages

that are on hold, delayed,

or just not completed

in the last 2-years * A list of simulator

modification

packages

completed

in the last 2-year window 2.10 Problem Identification

and Resolution * A summary report of all condition

reports related to operator

actions/errors

in the control room * Any revised requalification

training

that was based on licensed

operator

performance

issues B. The following

information

is requested

in order to support the on-site inspection

activities.

Requested

materials

should be available

to the inspection

team, either electronically

or hardcopy,

upon site arrival on June 4, 2018. 2.2 2.8 2.9 Exam Results / 02.03 and 02.04: Written Exam and Op Test Qualit'l

  • All Operating

tests (JPMs and scenarios)

to be given in all subsequent

weeks after on-site week * All results up to the day the team leaves the site Conformance

with Operator

License Conditions

  • Access to licensed

operators'

records ( operating

and staff crews) * Access to licensed

operators'

training

attendance

records * Access to licensed

operators'

medical records Simulator

Performance

  • Simulator

discrepancy

reports (DRs) from June 2016 to May 2018. This should include all open DR's and DR's that have been closed, including

the documentation/justification

for closure.

4

  • Acceptance

test documentation,

including

hardware

and software

model revisions

at the time of acceptance

(as available)

  • Documentation

that validates

current models, including

the thermal*hydraulics

and neutronics

models, to the actual plant * All current model deficiencies,

including

FSAR vs. Design differences

in the simulator

(any documentation

on this) * Summary list of modifications

from June 2016 to May 2018 * Plant modifications

(both hardware

and software)

completed

on the simulator

by due date from June 2016 to May 2018 * Simulator

Differences

Lesson plan used in training

(current

to June 4, 2018) * The complete

book of all simulator

annual performance

test packages

(usually

in a single book, but may be electronic

or in single test packages),

complete

with all transient

tests, steady state tests, and malfunction

tests. This should also include the test procedures

for each test, the acceptance

criteria,

and results.

For each transient

test, the reference

chart should be included

or an equivalent

subject matter expert review versus the simulator

results with a write-up

for any differences

beyond the ANSI standard

requirements.

  • All test packages

used to verify core physics parameters.

The applicable

reference

graphs from the plant physics data book ( electronic

or other means as available)

should also be included

as well as the test procedures

used and the acceptance

criteria

with results.

  • All simulator

test, configuration

management,

and related documents

available

in the room for inspectors

to review. This includes

training

needs analysis

packages,

simulator

review committee

meeting minutes,

etc. * Current copy of ANSI 3.5 standard

you are committed

to for simulator

testing 2.10 Problem Identification

and Resolution

  • All condition

reports related to operator

actions/errors

in the control room C. Wolf Creek Nuclear Operating

Corporation

is required

to send the final results summary,

and any remaining

exams and operating

tests that have not been reviewed

to the Regional

office lead inspector

for this inspection

for final review and comparison

against the significance

determination

tools in order to communicate

the exit results for the inspection.

5