ML16111B211: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:i REV. 14, APRIL 2002 LA SALLE COUNTY STATION UPDATED FINAL SAFETY ANALYSIS REPORT Table of Contents   VOLUME I  CHAPTER 1 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT   1.0 Introduction and General Description of Plant  1.1 Introduction  1.2 General Plant Description  1.3 Comparison Tables 1.4 Identification of Agents and Contractors  1.5 Requirements for Further Technical Information - Current  Concerns  1.6 Material Incorporated by Reference   CHAPTER 2 SITE CHARACTERISTICS 2.0 Site Characteristics  2.1 Geography and Demography  2.2 Nearby Industrial Transportation and Military Facilities  2.3 Meteorology  2.4 Hydrologic Engineering  VOLUME II  CHAPTER 2 (Continued) SITE CHARACTERISTICS   2.5 Geology, Seismology, and Geotechnical Engineering    Appendix 2.5A  Selected Structures Outside the      200-mile Radius 
{{#Wiki_filter:i REV. 14, APRIL 2002 LA SALLE COUNTY STATION UPDATED FINAL SAFETY ANALYSIS REPORT Table of Contents VOLUME I  CHAPTER 1 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT 1.0 Introduction and General Description of Plant  1.1 Introduction  1.2 General Plant Description  1.3 Comparison Tables 1.4 Identification of Agents and Contractors  1.5 Requirements for Further Technical Information - Current  Concerns  1.6 Material Incorporated by Reference CHAPTER 2 SITE CHARACTERISTICS  


LSCS-UFSAR  Table of Contents (Continued)  ii REV. 15, APRIL 2004  VOLUME III CHAPTER 3 DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS  3.0 Design of Structures, Components, Equipment, and Systems  3.1 Conformance with NRC General Design Criteria  3.2 Classification of Structures, Components, and Systems  3.3 Wind and Tornado Loadings  3.4 Water Level (Flood) Design  3.5 Missile Protection  3.6 Protection Against Dynamic Effects Associated with the Postulated Rupture of Piping  3.7 Seismic Design  3.8 Design of Category I Structures VOLUME IV  CHAPTER 3 (Continued) DESIGN OF STRUCTURES, COMPONENTS AND SYSTEMS  3.9 Mechanical Systems and Components  3.10  Seismic Qualification of Seismic Category I Instrumentation and Electrical Equipment  3.11  Environmental Design of Mechanical and Electrical Equipment  Attachment  3.A Deleted  Attachment 3.B A Generic Upper Boundary Probabilistic Analysis of the Effect of Recirculation Pump Missiles on Containment and Equipment in a Typical BWR 5 Mark II General Electric Boiling Water Reactor Nuclear Power Plant  Attachment 3.C Category I Concrete Masonry Walls LSCS-UFSAR  Table of Contents (Continued)  iii REV. 15, APRIL 2004 VOLUME IV - A  CHAPTER 4 REACTOR 4.0 Reactor  4.1 Summary Description  4.2 Fuel System  4.3 Nuclear Design  4.4 Thermal and Hydraulic Design  4.5 Reactor Materials 4.6 Functional Design of Reactivity Control Systems CHAPTER 5 REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS  5.0 Reactor Coolant System and Connected Systems  5.1 Summary Description  5.2 Integrity of Reactor Coolant Pressure Boundary 5.3 Reactor Vessel  5.4 Component and Subsystem Design  VOLUME V  CHAPTER 6 ENGINEERED SAFETY FEATURES 6.0 Engineered Safety Features  6.1 Engineered Safety Feature Materials  6.2 Containment Systems  6.3 Emergency Core Cooling Systems   6.4 Habitability Systems  6.5 Fission Product Removal and Control Systems  6.6 Inservice Inspection of ASME Code Class 2 and 3 Components  6.7 Main Steam Isolation Valve Leakage Control System (MSIV-LCS) - Unit 2 deleted, Unit 1 Abandoned in Place  6.8 Main Steam Isolation Valve - Isolated Condenser Leakage Treatment Method  Attachment 6.A Annulus Pressurization Attachment 6.B Recirculation System Single-Loop Operation LSCS-UFSAR  Table of Contents (Continued)  iv REV. 13 VOLUME VI  CHAPTER 7 INSTRUMENTATION AND CONTROL SYSTEMS 7.0 Instrumentation and Control Systems  7.1 Introduction  7.2 Reactor Protection System Instrumentation and Control  7.3 Engineered Safety Feature Systems  7.4 Systems Required for Safe Shutdown  7.5 Safety-Related Display Instrumentation 7.6 Other Instrumentation Systems Required for Safety  7.7 Control Systems Not Required for Safety  7.8 Status Displays  ATTACHMENT  7.A Analysis of Conformance of Instrumentation and Control Systems with IEEE Criteria CHAPTER 8 ELECTRIC POWER   8.0 Electric Power  8.1 Introduction  8.2 Offsite Power System  8.3 Onsite Power Systems  8.4 Other Electrical Features and Requirements for Safety VOLUME VII  CHAPTER 9 AUXILIARY SYSTEMS  9.0 Auxiliary Systems  9.1 Fuel Storage and Handling  9.2 Water Systems  9.3 Process Auxiliaries 9.4 Heating, Ventilation, and Air Conditioning  9.5 Other Auxiliary Systems  CHAPTER 10 STEAM AND POWER CONVERSION SYSTEM   10.0  Steam and Power Conversion System  10.1  Summary Description 10.2  Turbine Generator  10.3  Main Steam Supply System  10.4  Other Features of Steam and Power Conversion System LSCS-UFSAR  Table of Contents (Continued)  v REV. 13  CHAPTER 11 RADIOACTIVE WASTE MANAGEMENT 11.0  Radioactive Waste Management  11.1  Source Terms  11.2 Liquid Waste Management Systems  11.3 Gaseous Waste Management Systems  11.4  Solid Waste Management System  11.5  Process and Effluent Radiological Monitoring and Sampling Systems  CHAPTER 12 RADIATION PROTECTION   12.0  Radiation Protection  12.1  Ensuring that Occupational Radiation Exposures Are as Low as Reasonably Achievable  12.2 Radiation Sources 12.3  Radiation Protection Design Features  12.4 Dose Assessment  12.5  Health Physics Program  VOLUME VIII  CHAPTER 13 CONDUCT OF OPERATIONS 13.0  Conduct of Operations  13.1  Organizational Structures of Licensee  13.2 Training  13.3  Emergency Planning  13.4  Review and Audit  13.5  Plant Procedures  13.6  Plant Records  13.7  Industrial Security CHAPTER 14 INITIAL TEST PROGRAM    14.0  Initial Test Program LSCS-UFSAR  Table of Contents (Continued) vi REV. 15, APRIL 2004  CHAPTER 15 ACCIDENT ANALYSES 15.0  Accident Analyses  15.1  Increase in Heat Removal by the Secondary System  15.2  Decrease in Heat Removal by the Secondary System  15.3  Decrease in Reactor Coolant System Flow Rate  15.4  Reactivity and Power Distribution Anomalies  15.5  Increase in Reactor Coolant Inventory  15.6  Decrease in Reactor Coolant Inventory 15.7  Radioactive Release from Subsystems and Components  15.8  Anticipated Transients Without Scram (ATWS)  15.9 Loss of All Alternating Current Power (Station Blackout)  15.A  Unit 1 Cycle 2 Safety Analyses  15.B  Unit 2 Safety Analyses  CHAPTER 16 TECHNICAL SPECIFICATIONS 16.0  Technical Specifications  CHAPTER 17 QUALITY ASSURANCE    17.0  Quality Assurance APPENDIX A GLOSSARY  APPENDIX B CONFORMANCE TO REGULATORY GUIDES  APPENDIX C ANALYSIS OF HIGH-ENERGY LINE BREAKS OUTSIDE PRIMARY CONTAINMENT  APPENDIX D PLANT NUCLEAR SAFETY OPERATIONAL ANALYSIS APPENDIX E CONSTRUCTION MATERIAL STANDARDS AND QUALITY CONTROL PROCEDURES  APPENDIX F COMPUTER PROGRAMS  F.0 Computer Programs for Structural Analysis and Design  F.1 Concrete  F.2 CSEF-III  F.3 DAPS-II  F.4 DYNAS  F.5 DYNAX LSCS-UFSAR  Table of Contents (Continued)  via REV. 15, APRIL 2004  F.6 EASE  F.7 EMBANK  F.8 INDIA  F.9 SETTLE  F.10 KALSHEL  F.11 LAFD  F.12 MESHG  F.13 PLFEM-II  F.14 QUAD4  F.15 RGS  F.16 SEPOL  F.17 SHAKE  F.18 SLOPE  F.19 SLSAP  F.20 SOR-III  F.21 SSANA  F.22 STAND  F.23 STRESS  F.24 STRUDL-II  F.25 TEMCO  F.26 WARLOC  F.27 PIPSYS  F.28 PENAN  F.29 FAST  F.30 REFERENCES LSCS-UFSAR  Table of Contents (Continued)  vii REV. 15, APRIL 2004  APPENDIX G REACTOR RECIRCULATION SYSTEM G.0 Reactor Recirculation System  G.1 Introduction  G.2 Recirculation System Design Description  G.3 System Design Evaluations  G.4 Testing G.5 Recirculation Pump Trip and Flow Control Features  G.6 Transient Analysis G.7 References  ATTACHMENT  G.A REACTOR RECIRCULATION SYSTEM DESIGN DRAWINGS  ATTACHMENT  G.B FAILURE MODES AND EFFECTS ANALYSES VOLUME IX  APPENDIX H DELETED - Moved to Fire Protection Report (FPR)  APPENDIX I INFORMATION RELEVANT TO KEEPING LEVELS OF RADIOACTIVITY IN EFFLUENTS TO UNRESTRICTED AREAS AS LOW AS REASONABLY ACHIEVABLE  APPENDIX J ANALYSIS OF THE EFFECTS OF MODERATE ENERGY LINE THROUGH WALL LEAKAGE CRACKS OUTSIDE PRIMARY CONTAINMENT  J.0 Introduction  J.1 Moderate Energy Lines  J.2 Plant Areas and Equipment Affected by MELB  J.3 Spray Shield  J.4 Effects of Flooding  J.5 Conclusion  APPENDIX K INTERIM OFFSITE POWER ARRANGEMENT LSCS-UFSAR Table of Contents (Continued)  viii REV. 19, APRIL 2012  APPENDIX L REQUIREMENTS RESULTING FROM TMI-2 ACCIDENT APPENDIX M ENVIRONMENTAL QUALIFICATION OF ELECTRICAL                            EQUIPMENT  APPENDIX N INTERIM SECONDARY CONTAINMENT  APPENDIX O CONTROL OF HEAVY LOADS   
2.0 Site Characteristics   2.1 Geography and Demography   2.2 Nearby Industrial Transportation and Military Facilities   2.3 Meteorology   2.4 Hydrologic Engineering VOLUME II CHAPTER 2 (Continued) SITE CHARACTERISTICS 2.5 Geology, Seismology, an d Geotechnical Engineering Appendix 2.5A Selected Structures Outside the      200-mile Radius  


i REV. 14, APRIL 2002 LA SALLE COUNTY STATION  UPDATED FINAL SAFETY ANALYSIS REPORT  Table of Contents   VOLUME I  CHAPTER 1 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT  1.0 Introduction and General Description of Plant  1.1 Introduction  1.2 General Plant Description  1.3 Comparison Tables 1.4 Identification of Agents and Contractors  1.5 Requirements for Further Technical Information - Current  Concerns  1.6 Material Incorporated by Reference  CHAPTER 2 SITE CHARACTERISTICS 2.0 Site Characteristics  2.1 Geography and Demography  2.2 Nearby Industrial Transportation and Military Facilities  2.3 Meteorology  2.4 Hydrologic Engineering  VOLUME II  CHAPTER 2 (Continued) SITE CHARACTERISTICS    2.5 Geology, Seismology, and Geotechnical Engineering    Appendix 2.5A  Selected Structures Outside the      200-mile Radius 
LSCS-UFSAR Table of Contents (Continued) ii REV. 15, APRIL 2004 VOLUME III


LSCS-UFSAR  Table of Contents (Continued)  ii REV. 15, APRIL 2004  VOLUME III CHAPTER 3 DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS  3.0 Design of Structures, Components, Equipment, and Systems  3.1 Conformance with NRC General Design Criteria  3.2 Classification of Structures, Components, and Systems  3.3 Wind and Tornado Loadings  3.4 Water Level (Flood) Design  3.5 Missile Protection  3.6 Protection Against Dynamic Effects Associated with the Postulated Rupture of Piping  3.7 Seismic Design  3.8 Design of Category I Structures VOLUME IV CHAPTER 3 (Continued) DESIGN OF STRUCTURES, COMPONENTS AND SYSTEMS  3.9 Mechanical Systems and Components  3.10  Seismic Qualification of Seismic Category I Instrumentation and Electrical Equipment  3.11  Environmental Design of Mechanical and Electrical Equipment   Attachment  3.A Deleted Attachment 3.B A Generic Upper Boundary Probabilistic Analysis of the Effect of Recirculation Pump Missiles on Containment and Equipment in a Typical BWR 5 Mark II General Electric Boiling Water Reactor Nuclear Power Plant   Attachment 3.C Category I Concrete Masonry Walls LSCS-UFSAR Table of Contents (Continued) iii REV. 15, APRIL 2004 VOLUME IV - A CHAPTER 4 REACTOR 4.0 Reactor  4.1 Summary Description  4.2 Fuel System  4.3 Nuclear Design  4.4 Thermal and Hydraulic Design  4.5 Reactor Materials 4.6 Functional Design of Reactivity Control Systems CHAPTER 5 REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS   5.0 Reactor Coolant System and Connected Systems  5.1 Summary Description  5.2 Integrity of Reactor Coolant Pressure Boundary 5.3 Reactor Vessel  5.4 Component and Subsystem Design VOLUME V  CHAPTER 6 ENGINEERED SAFETY FEATURES 6.0 Engineered Safety Features  6.1 Engineered Safety Feature Materials  6.2 Containment Systems  6.3 Emergency Core Cooling Systems  6.4 Habitability Systems  6.5 Fission Product Removal and Control Systems  6.6 Inservice Inspection of ASME Code Class 2 and 3 Components  6.7 Main Steam Isolation Valve Leakage Control System (MSIV-LCS) - Unit 2 deleted, Unit 1 Abandoned in Place  6.8 Main Steam Isolation Valve - Isolated Condenser Leakage Treatment Method Attachment 6.A Annulus Pressurization Attachment 6.B Recirculation System Single-Loop Operation LSCS-UFSAR Table of Contents (Continued) iv REV. 13 VOLUME VI CHAPTER 7 INSTRUMENTATION AND CONTROL SYSTEMS 7.0 Instrumentation and Control Systems  7.1 Introduction  7.2 Reactor Protection System Instrumentation and Control  7.3 Engineered Safety Feature Systems  7.4 Systems Required for Safe Shutdown  7.5 Safety-Related Display Instrumentation 7.6 Other Instrumentation Systems Required for Safety  7.7 Control Systems Not Required for Safety 7.8 Status Displays ATTACHMENT  7.A Analysis of Conformance of Instrumentation and Control Systems with IEEE Criteria CHAPTER 8 ELECTRIC POWER   8.0 Electric Power  8.1 Introduction  8.2 Offsite Power System  8.3 Onsite Power Systems  8.4 Other Electrical Features and Requirements for Safety VOLUME VII CHAPTER 9 AUXILIARY SYSTEMS   9.0 Auxiliary Systems  9.1 Fuel Storage and Handling  9.2 Water Systems  9.3 Process Auxiliaries 9.4 Heating, Ventilation, and Air Conditioning  9.5 Other Auxiliary Systems   CHAPTER 10 STEAM AND POWER CONVERSION SYSTEM   10.0  Steam and Power Conversion System  10.1  Summary Description 10.2  Turbine Generator  10.3  Main Steam Supply System  10.4  Other Features of Steam and Power Conversion System LSCS-UFSAR Table of Contents (Continued) v REV. 13 CHAPTER 11 RADIOACTIVE WASTE MANAGEMENT 11.0  Radioactive Waste Management  11.1  Source Terms  11.2  Liquid Waste Management Systems  11.3  Gaseous Waste Management Systems  11.4  Solid Waste Management System  11.5  Process and Effluent Radiological Monitoring and Sampling Systems  CHAPTER 12 RADIATION PROTECTION   12.0  Radiation Protection  12.1  Ensuring that Occupational Radiation Exposures Are as Low as Reasonably Achievable  12.2  Radiation Sources 12.3  Radiation Protection Design Features  12.4  Dose Assessment  12.5  Health Physics Program VOLUME VIII CHAPTER 13 CONDUCT OF OPERATIONS 13.0  Conduct of Operations  13.1  Organizational Structures of Licensee  13.2  Training  13.3  Emergency Planning  13.4  Review and Audit  13.5  Plant Procedures  13.6  Plant Records  13.7  Industrial Security CHAPTER 14 INITIAL TEST PROGRAM   14.0  Initial Test Program LSCS-UFSAR Table of Contents (Continued) vi REV. 15, APRIL 2004 CHAPTER 15 ACCIDENT ANALYSES 15.0  Accident Analyses  15.1  Increase in Heat Removal by the Secondary System  15.2  Decrease in Heat Removal by the Secondary System  15.3  Decrease in Reactor Coolant System Flow Rate  15.4  Reactivity and Power Distribution Anomalies  15.5  Increase in Reactor Coolant Inventory  15.6  Decrease in Reactor Coolant Inventory 15.7  Radioactive Release from Subsystems and Components  15.8  Anticipated Transients Without Scram (ATWS)  15.9 Loss of All Alternating Current Power (Station Blackout)  15.A  Unit 1 Cycle 2 Safety Analyses  15.B  Unit 2 Safety Analyses   CHAPTER 16 TECHNICAL SPECIFICATIONS 16.0  Technical Specifications CHAPTER 17 QUALITY ASSURANCE   17.0  Quality Assurance APPENDIX A GLOSSARY APPENDIX B CONFORMANCE TO REGULATORY GUIDES   APPENDIX C ANALYSIS OF HIGH-ENERGY LINE BREAKS OUTSIDE PRIMARY CONTAINMENT   APPENDIX D PLANT NUCLEAR SAFETY OPERATIONAL ANALYSIS APPENDIX E CONSTRUCTION MATERIAL STANDARDS AND QUALITY CONTROL PROCEDURES   APPENDIX F COMPUTER PROGRAMS  F.0 Computer Programs for Structural Analysis and Design  F.1 Concrete  F.2 CSEF-III F.3 DAPS-II F.4 DYNAS F.5 DYNAX LSCS-UFSAR Table of Contents (Continued) via REV. 15, APRIL 2004   F.6 EASE F.7 EMBANK F.8 INDIA F.9 SETTLE F.10 KALSHEL F.11 LAFD F.12 MESHG F.13 PLFEM-II F.14 QUAD4 F.15 RGS F.16 SEPOL F.17 SHAKE F.18 SLOPE F.19 SLSAP F.20 SOR-III F.21 SSANA F.22 STAND F.23 STRESS F.24 STRUDL-II F.25 TEMCO F.26 WARLOC F.27 PIPSYS F.28 PENAN F.29 FAST F.30 REFERENCES LSCS-UFSAR Table of Contents (Continued) vii REV. 15, APRIL 2004 APPENDIX G REACTOR RECIRCULATION SYSTEM G.0 Reactor Recirculation System  G.1 Introduction  G.2 Recirculation System Design Description  G.3 System Design Evaluations  G.4 Testing  G.5 Recirculation Pump Trip and Flow Control Features  G.6 Transient Analysis G.7 References ATTACHMENT  G.A REACTOR RECIRCULATION SYSTEM DESIGN DRAWINGS   ATTACHMENT  G.B FAILURE MODES AND EFFECTS ANALYSES VOLUME IX APPENDIX H DELETED - Moved to Fire Protection Report (FPR) APPENDIX I INFORMATION RELEVANT TO KEEPING LEVELS OF RADIOACTIVITY IN EFFLUENTS TO UNRESTRICTED AREAS AS LOW AS REASONABLY ACHIEVABLE APPENDIX J ANALYSIS OF THE EFFECTS OF MODERATE ENERGY LINE THROUGH WALL LEAKAGE CRACKS OUTSIDE PRIMARY CONTAINMENT   J.0 Introduction  J.1 Moderate Energy Lines  J.2 Plant Areas and Equipment Affected by MELB  J.3 Spray Shield  J.4 Effects of Flooding  J.5 Conclusion   APPENDIX K INTERIM OFFSITE POWER ARRANGEMENT LSCS-UFSAR Table of Contents (Continued) viii REV. 19, APRIL 2012 APPENDIX L REQUIREMENTS RESULTING FROM TMI-2 ACCIDENT APPENDIX M ENVIRONMENTAL QUALIFICATION OF ELECTRICAL                           EQUIPMENT   APPENDIX N INTERIM SECONDARY CONTAINMENT  APPENDIX O CONTROL OF HEAVY LOADS}}
CHAPTER 3 DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS  3.0 Design of Structures, Compo nents, Equipment, and Systems  3.1 Conformance with NRC General Design Criteria  3.2 Classification of Structures, Components, and Systems  3.3 Wind and Tornado Loadings  3.4 Water Level (Flood) Design  3.5 Missile Protection  3.6 Protection Against Dynamic Effects Associated with the Postulated Rupture of Piping  3.7 Seismic Design  3.8 Design of Category I Structures
 
VOLUME IV CHAPTER 3 (Continued) DESIGN OF STRUCTURES, COMPONENTS AND SYSTEMS  3.9 Mechanical Systems and Components  3.10  Seismic Qualification of Se ismic Category I Instrumentation and Electrical Equipment  3.11  Environmental Design of Mechanical and Electrical Equipment Attachment  3.A Deleted Attachment 3.B A Generic Upper Bound ary Probabilistic Analysis of the Effect of Recirculation Pump Missiles on Containment and Equipment in a Typical BWR 5 Mark II General Electric Boiling Water Reactor Nuclear Power Plant Attachment 3.C Category I Concrete Masonry Walls LSCS-UFSAR Table of Contents (Continued) iii REV. 15, APRIL 2004 VOLUME IV - A CHAPTER 4 REACTOR  
 
4.0 Reactor  4.1 Summary Description  4.2 Fuel System  4.3 Nuclear Design  4.4 Thermal and Hydraulic Design  4.5 Reactor Materials 4.6 Functional Design of Reactivity Control Systems  
 
CHAPTER 5 REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS 5.0 Reactor Coolant System and Connected Systems  5.1 Summary Description  5.2 Integrity of Reactor Coolant Pressure Boundary 5.3 Reactor Vessel  5.4 Component and Subsystem Design VOLUME V  CHAPTER 6 ENGINEERED SAFETY FEATURES  
 
6.0 Engineered Safety Features  6.1 Engineered Safety Feature Materials  6.2 Containment Systems  6.3 Emergency Core Cooling Systems  6.4 Habitability Systems  6.5 Fission Product Removal and Control Systems  6.6 Inservice Inspection of ASME Code Class 2 and 3 Components  6.7 Main Steam Isolation Valve Leakage Control System (MSIV-LCS) - Unit 2 deleted, Unit 1 Abandoned in Place  6.8 Main Steam Isolation Valve - Isolated Condenser Leakage Treatment Method Attachment 6.A Annulus Pressurization Attachment 6.B Recirculation System Single-Loop Operation LSCS-UFSAR Table of Contents (Continued) iv REV. 13 VOLUME VI CHAPTER 7 INSTRUMENTATION AND CONTROL SYSTEMS  
 
7.0 Instrumentation and Control Systems  7.1 Introduction  7.2 Reactor Protection System Instrumentation and Control  7.3 Engineered Safety Feature Systems  7.4 Systems Required for Safe Shutdown  7.5 Safety-Related Display Instrumentation 7.6 Other Instrumentation Systems Required for Safety  7.7 Control Systems Not Required for Safety 7.8 Status Displays ATTACHMENT  7.A Analysis of Conformance of Instrumentation and Control Systems with IEEE Criteria  
 
CHAPTER 8 ELECTRIC POWER 8.0 Electric Power  8.1 Introduction  8.2 Offsite Power System  8.3 Onsite Power Systems  8.4 Other Electrical Features and Requirements for Safety
 
VOLUME VII CHAPTER 9 AUXILIARY SYSTEMS 9.0 Auxiliary Systems  9.1 Fuel Storage and Handling  9.2 Water Systems  9.3 Process Auxiliaries 9.4 Heating, Ventilation, and Air Conditioning  9.5 Other Auxiliary Systems CHAPTER 10 STEAM AND POWER CONVERSION SYSTEM 10.0  Steam and Power Conversion System  10.1  Summary Description 10.2  Turbine Generator  10.3  Main Steam Supply System  10.4  Other Features of Steam and Power Conversion System LSCS-UFSAR Table of Contents (Continued) v REV. 13 CHAPTER 11 RADIOACTIVE WASTE MANAGEMENT  
 
11.0  Radioactive Waste Management  11.1  Source Terms  11.2  Liquid Waste Management Systems  11.3  Gaseous Waste Management Systems  11.4  Solid Waste Management System  11.5  Process and Effluent Radiological Monitoring and Sampling Systems  CHAPTER 12 RADIATION PROTECTION 12.0  Radiation Protection  12.1  Ensuring that Occupational Radiation Exposures Are as Low as Reasonably Achievable  12.2  Radiation Sources 12.3  Radiation Protection Design Features  12.4  Dose Assessment  12.5  Health Physics Program VOLUME VIII CHAPTER 13 CONDUCT OF OPERATIONS  
 
13.0  Conduct of Operations  13.1  Organizational Structures of Licensee  13.2  Training  13.3  Emergency Planning  13.4  Review and Audit  13.5  Plant Procedures  13.6  Plant Records  13.7  Industrial Security  
 
CHAPTER 14 INITIAL TEST PROGRAM 14.0  Initial Test Program LSCS-UFSAR Table of Contents (Continued) vi REV. 15, APRIL 2004 CHAPTER 15 ACCIDENT ANALYSES  
 
15.0  Accident Analyses  15.1  Increase in Heat Removal by the Secondary System  15.2  Decrease in Heat Removal by the Secondary System  15.3  Decrease in Reactor C oolant System Flow Rate  15.4  Reactivity and Power Distribution Anomalies  15.5  Increase in Reactor Coolant Inventory  15.6  Decrease in Reactor Coolant Inventory 15.7  Radioactive Release from Subsystems and Components  15.8  Anticipated Transients Without Scram (ATWS)  15.9 Loss of All Alternating Current Power (Station Blackout)  15.A  Unit 1 Cycle 2 Safety Analyses  15.B  Unit 2 Safety Analyses CHAPTER 16 TECHNICAL SPECIFICATIONS  
 
16.0  Technical Specifications CHAPTER 17 QUALITY ASSURANCE 17.0  Quality Assurance
 
APPENDIX A GLOSSARY APPENDIX B CONFORMANCE TO REGULATORY GUIDES APPENDIX C ANALYSIS OF HIGH-ENERGY LINE BREAKS OUTSIDE PRIMARY CONTAINMENT APPENDIX D PLANT NUCLEAR SAFE TY OPERATIONAL ANALYSIS  
 
APPENDIX E CONSTRUCTION MATERIAL STANDARDS AND QUALITY CONTROL PROCEDURES APPENDIX F COMPUTER PROGRAMS  F.0 Computer Programs for Structural Analysis and Design  F.1 Concrete  F.2 CSEF-III F.3 DAPS-II F.4 DYNAS F.5 DYNAX
 
LSCS-UFSAR Table of Contents (Continued) via REV. 15, APRIL 2004 F.6 EASE F.7 EMBANK F.8 INDIA F.9 SETTLE F.10 KALSHEL F.11 LAFD F.12 MESHG F.13 PLFEM-II F.14 QUAD4 F.15 RGS F.16 SEPOL F.17 SHAKE F.18 SLOPE F.19 SLSAP F.20 SOR-III F.21 SSANA F.22 STAND F.23 STRESS F.24 STRUDL-II F.25 TEMCO F.26 WARLOC F.27 PIPSYS F.28 PENAN F.29 FAST F.30 REFERENCES
 
LSCS-UFSAR Table of Contents (Continued) vii REV. 15, APRIL 2004 APPENDIX G REACTOR RECIRCULATION SYSTEM  
 
G.0 Reactor Recirculation System  G.1 Introduction  G.2 Recirculation System Design Description  G.3 System Design Evaluations  G.4 Testing  G.5 Recirculation Pump Trip and Flow Control Features  G.6 Transient Analysis G.7 References ATTACHMENT  G.A REACTOR RECIRCULATION SYSTEM DESIGN DRAWINGS ATTACHMENT  G.B FAILURE MODES AN D EFFECTS ANALYSES
 
VOLUME IX APPENDIX H DELETED - Moved to Fire Protection Report (FPR)
APPENDIX I INFORMATION RELEVANT TO KEEPING LEVELS OF RADIOACTIVITY IN EFFLUENTS TO UNRESTRICTED AREAS AS LOW AS REASONABLY ACHIEVABLE APPENDIX J ANALYSIS OF THE EFFECTS OF MODERATE ENERGY LINE THROUGH WALL LEAKAGE CRACKS OUTSIDE PRIMARY CONTAINMENT J.0 Introduction  J.1 Moderate Energy Lines  J.2 Plant Areas and Equipment Affected by MELB  J.3 Spray Shield  J.4 Effects of Flooding  J.5 Conclusion APPENDIX K INTERIM OFFSITE POWER ARRANGEMENT LSCS-UFSAR Table of Contents (Continued) viii REV. 19, APRIL 2012 APPENDIX L REQUIREMENTS RESULTING FROM TMI-2 ACCIDENT  
 
APPENDIX M ENVIRONMENTAL QUALIFICATION OF ELECTRICAL EQUIPMENT APPENDIX N INTERIM SECONDARY CONTAINMENT APPENDIX O CONTROL OF HEAVY LOADS
 
i REV. 14, APRIL 2002 LA SALLE COUNTY STATION UPDATED FINAL SAFETY ANALYSIS REPORT Table of Contents VOLUME I  CHAPTER 1 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT 1.0 Introduction and General Description of Plant  1.1 Introduction   1.2 General Plant Description  1.3 Comparison Tables 1.4 Identification of Agents and Contractors  1.5 Requirements for Further Technical Information - Current  Concerns  1.6 Material Incorporated by Reference CHAPTER 2 SITE CHARACTERISTICS
 
2.0 Site Characteristics  2.1 Geography and Demography  2.2 Nearby Industrial Transportation and Military Facilities  2.3 Meteorology  2.4 Hydrologic Engineering VOLUME II CHAPTER 2 (Continued) SITE CHARACTERISTICS 2.5 Geology, Seismology, an d Geotechnical Engineering Appendix 2.5A  Selected Structures Outside the      200-mile Radius 
 
LSCS-UFSAR Table of Contents (Continued) ii REV. 15, APRIL 2004 VOLUME III
 
CHAPTER 3 DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS  3.0 Design of Structures, Compo nents, Equipment, and Systems  3.1 Conformance with NRC General Design Criteria  3.2 Classification of Structures, Components, and Systems  3.3 Wind and Tornado Loadings  3.4 Water Level (Flood) Design  3.5 Missile Protection  3.6 Protection Against Dynamic Effects Associated with the Postulated Rupture of Piping  3.7 Seismic Design  3.8 Design of Category I Structures 
 
VOLUME IV CHAPTER 3 (Continued) DESIGN OF STRUCTURES, COMPONENTS AND SYSTEMS  3.9 Mechanical Systems and Components  3.10  Seismic Qualification of Se ismic Category I Instrumentation and Electrical Equipment  3.11  Environmental Design of Mechanical and Electrical Equipment Attachment  3.A Deleted Attachment 3.B A Generic Upper Bound ary Probabilistic Analysis of the Effect of Recirculation Pump Missiles on Containment and Equipment in a Typical BWR 5 Mark II General Electric Boiling Water Reactor Nuclear Power Plant Attachment 3.C Category I Concrete Masonry Walls LSCS-UFSAR Table of Contents (Continued) iii REV. 15, APRIL 2004 VOLUME IV - A CHAPTER 4 REACTOR
 
4.0 Reactor  4.1 Summary Description  4.2 Fuel System  4.3 Nuclear Design  4.4 Thermal and Hydraulic Design  4.5 Reactor Materials 4.6 Functional Design of Reactivity Control Systems
 
CHAPTER 5 REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS 5.0 Reactor Coolant System and Connected Systems  5.1 Summary Description  5.2 Integrity of Reactor Coolant Pressure Boundary 5.3 Reactor Vessel  5.4 Component and Subsystem Design VOLUME V  CHAPTER 6 ENGINEERED SAFETY FEATURES
 
6.0 Engineered Safety Features  6.1 Engineered Safety Feature Materials  6.2 Containment Systems  6.3 Emergency Core Cooling Systems  6.4 Habitability Systems  6.5 Fission Product Removal and Control Systems  6.6 Inservice Inspection of ASME Code Class 2 and 3 Components  6.7 Main Steam Isolation Valve Leakage Control System (MSIV-LCS) - Unit 2 deleted, Unit 1 Abandoned in Place  6.8 Main Steam Isolation Valve - Isolated Condenser Leakage Treatment Method Attachment 6.A Annulus Pressurization Attachment 6.B Recirculation System Single-Loop Operation LSCS-UFSAR Table of Contents (Continued) iv REV. 13 VOLUME VI CHAPTER 7 INSTRUMENTATION AND CONTROL SYSTEMS
 
7.0 Instrumentation and Control Systems  7.1 Introduction  7.2 Reactor Protection System Instrumentation and Control  7.3 Engineered Safety Feature Systems  7.4 Systems Required for Safe Shutdown  7.5 Safety-Related Display Instrumentation 7.6 Other Instrumentation Systems Required for Safety  7.7 Control Systems Not Required for Safety 7.8 Status Displays ATTACHMENT  7.A Analysis of Conformance of Instrumentation and Control Systems with IEEE Criteria
 
CHAPTER 8 ELECTRIC POWER 8.0 Electric Power  8.1 Introduction  8.2 Offsite Power System  8.3 Onsite Power Systems  8.4 Other Electrical Features and Requirements for Safety 
 
VOLUME VII CHAPTER 9 AUXILIARY SYSTEMS 9.0 Auxiliary Systems  9.1 Fuel Storage and Handling  9.2 Water Systems  9.3 Process Auxiliaries 9.4 Heating, Ventilation, and Air Conditioning  9.5 Other Auxiliary Systems CHAPTER 10 STEAM AND POWER CONVERSION SYSTEM 10.0  Steam and Power Conversion System  10.1  Summary Description 10.2  Turbine Generator  10.3  Main Steam Supply System  10.4  Other Features of Steam and Power Conversion System LSCS-UFSAR Table of Contents (Continued) v REV. 13 CHAPTER 11 RADIOACTIVE WASTE MANAGEMENT
 
11.0  Radioactive Waste Management  11.1  Source Terms  11.2  Liquid Waste Management Systems  11.3  Gaseous Waste Management Systems  11.4  Solid Waste Management System  11.5  Process and Effluent Radiological Monitoring and Sampling Systems  CHAPTER 12 RADIATION PROTECTION 12.0  Radiation Protection  12.1  Ensuring that Occupational Radiation Exposures Are as Low as Reasonably Achievable  12.2  Radiation Sources 12.3  Radiation Protection Design Features  12.4  Dose Assessment  12.5  Health Physics Program VOLUME VIII CHAPTER 13 CONDUCT OF OPERATIONS
 
13.0  Conduct of Operations  13.1  Organizational Structures of Licensee  13.2  Training  13.3  Emergency Planning  13.4  Review and Audit  13.5  Plant Procedures  13.6  Plant Records  13.7  Industrial Security
 
CHAPTER 14 INITIAL TEST PROGRAM 14.0  Initial Test Program LSCS-UFSAR Table of Contents (Continued) vi REV. 15, APRIL 2004 CHAPTER 15 ACCIDENT ANALYSES
 
15.0  Accident Analyses  15.1  Increase in Heat Removal by the Secondary System  15.2  Decrease in Heat Removal by the Secondary System  15.3  Decrease in Reactor C oolant System Flow Rate  15.4  Reactivity and Power Distribution Anomalies  15.5  Increase in Reactor Coolant Inventory  15.6  Decrease in Reactor Coolant Inventory 15.7  Radioactive Release from Subsystems and Components  15.8  Anticipated Transients Without Scram (ATWS)  15.9 Loss of All Alternating Current Power (Station Blackout)  15.A  Unit 1 Cycle 2 Safety Analyses  15.B  Unit 2 Safety Analyses CHAPTER 16 TECHNICAL SPECIFICATIONS
 
16.0  Technical Specifications CHAPTER 17 QUALITY ASSURANCE 17.0  Quality Assurance 
 
APPENDIX A GLOSSARY APPENDIX B CONFORMANCE TO REGULATORY GUIDES APPENDIX C ANALYSIS OF HIGH-ENERGY LINE BREAKS OUTSIDE PRIMARY CONTAINMENT APPENDIX D PLANT NUCLEAR SAFE TY OPERATIONAL ANALYSIS
 
APPENDIX E CONSTRUCTION MATERIAL STANDARDS AND QUALITY CONTROL PROCEDURES APPENDIX F COMPUTER PROGRAMS  F.0 Computer Programs for Structural Analysis and Design  F.1 Concrete  F.2 CSEF-III F.3 DAPS-II F.4 DYNAS F.5 DYNAX
 
LSCS-UFSAR Table of Contents (Continued) via REV. 15, APRIL 2004 F.6 EASE F.7 EMBANK F.8 INDIA F.9 SETTLE F.10 KALSHEL F.11 LAFD F.12 MESHG F.13 PLFEM-II F.14 QUAD4 F.15 RGS F.16 SEPOL F.17 SHAKE F.18 SLOPE F.19 SLSAP F.20 SOR-III F.21 SSANA F.22 STAND F.23 STRESS F.24 STRUDL-II F.25 TEMCO F.26 WARLOC F.27 PIPSYS F.28 PENAN F.29 FAST F.30 REFERENCES
 
LSCS-UFSAR Table of Contents (Continued) vii REV. 15, APRIL 2004 APPENDIX G REACTOR RECIRCULATION SYSTEM
 
G.0 Reactor Recirculation System  G.1 Introduction  G.2 Recirculation System Design Description  G.3 System Design Evaluations  G.4 Testing  G.5 Recirculation Pump Trip and Flow Control Features  G.6 Transient Analysis G.7 References ATTACHMENT  G.A REACTOR RECIRCULATION SYSTEM DESIGN DRAWINGS ATTACHMENT  G.B FAILURE MODES AN D EFFECTS ANALYSES 
 
VOLUME IX APPENDIX H DELETED - Moved to Fire Protection Report (FPR)
APPENDIX I INFORMATION RELEVANT TO KEEPING LEVELS OF RADIOACTIVITY IN EFFLUENTS TO UNRESTRICTED AREAS AS LOW AS REASONABLY ACHIEVABLE APPENDIX J ANALYSIS OF THE EFFECTS OF MODERATE ENERGY LINE THROUGH WALL LEAKAGE CRACKS OUTSIDE PRIMARY CONTAINMENT J.0 Introduction  J.1 Moderate Energy Lines  J.2 Plant Areas and Equipment Affected by MELB  J.3 Spray Shield  J.4 Effects of Flooding  J.5 Conclusion APPENDIX K INTERIM OFFSITE POWER ARRANGEMENT LSCS-UFSAR Table of Contents (Continued) viii REV. 19, APRIL 2012 APPENDIX L REQUIREMENTS RESULTING FROM TMI-2 ACCIDENT
 
APPENDIX M ENVIRONMENTAL QUALIFICATION OF ELECTRICAL EQUIPMENT APPENDIX N INTERIM SECONDARY CONTAINMENT APPENDIX O CONTROL OF HEAVY LOADS}}

Revision as of 10:49, 30 June 2018

LaSalle County, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 22, List of Effective Pages
ML16111B211
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 04/11/2016
From:
Exelon Generation Co
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML16111B236 List:
References
RS-16-080
Download: ML16111B211 (171)


Text

i REV. 14, APRIL 2002 LA SALLE COUNTY STATION UPDATED FINAL SAFETY ANALYSIS REPORT Table of Contents VOLUME I CHAPTER 1 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT 1.0 Introduction and General Description of Plant 1.1 Introduction 1.2 General Plant Description 1.3 Comparison Tables 1.4 Identification of Agents and Contractors 1.5 Requirements for Further Technical Information - Current Concerns 1.6 Material Incorporated by Reference CHAPTER 2 SITE CHARACTERISTICS

2.0 Site Characteristics 2.1 Geography and Demography 2.2 Nearby Industrial Transportation and Military Facilities 2.3 Meteorology 2.4 Hydrologic Engineering VOLUME II CHAPTER 2 (Continued) SITE CHARACTERISTICS 2.5 Geology, Seismology, an d Geotechnical Engineering Appendix 2.5A Selected Structures Outside the 200-mile Radius

LSCS-UFSAR Table of Contents (Continued) ii REV. 15, APRIL 2004 VOLUME III

CHAPTER 3 DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS 3.0 Design of Structures, Compo nents, Equipment, and Systems 3.1 Conformance with NRC General Design Criteria 3.2 Classification of Structures, Components, and Systems 3.3 Wind and Tornado Loadings 3.4 Water Level (Flood) Design 3.5 Missile Protection 3.6 Protection Against Dynamic Effects Associated with the Postulated Rupture of Piping 3.7 Seismic Design 3.8 Design of Category I Structures

VOLUME IV CHAPTER 3 (Continued) DESIGN OF STRUCTURES, COMPONENTS AND SYSTEMS 3.9 Mechanical Systems and Components 3.10 Seismic Qualification of Se ismic Category I Instrumentation and Electrical Equipment 3.11 Environmental Design of Mechanical and Electrical Equipment Attachment 3.A Deleted Attachment 3.B A Generic Upper Bound ary Probabilistic Analysis of the Effect of Recirculation Pump Missiles on Containment and Equipment in a Typical BWR 5 Mark II General Electric Boiling Water Reactor Nuclear Power Plant Attachment 3.C Category I Concrete Masonry Walls LSCS-UFSAR Table of Contents (Continued) iii REV. 15, APRIL 2004 VOLUME IV - A CHAPTER 4 REACTOR

4.0 Reactor 4.1 Summary Description 4.2 Fuel System 4.3 Nuclear Design 4.4 Thermal and Hydraulic Design 4.5 Reactor Materials 4.6 Functional Design of Reactivity Control Systems

CHAPTER 5 REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS 5.0 Reactor Coolant System and Connected Systems 5.1 Summary Description 5.2 Integrity of Reactor Coolant Pressure Boundary 5.3 Reactor Vessel 5.4 Component and Subsystem Design VOLUME V CHAPTER 6 ENGINEERED SAFETY FEATURES

6.0 Engineered Safety Features 6.1 Engineered Safety Feature Materials 6.2 Containment Systems 6.3 Emergency Core Cooling Systems 6.4 Habitability Systems 6.5 Fission Product Removal and Control Systems 6.6 Inservice Inspection of ASME Code Class 2 and 3 Components 6.7 Main Steam Isolation Valve Leakage Control System (MSIV-LCS) - Unit 2 deleted, Unit 1 Abandoned in Place 6.8 Main Steam Isolation Valve - Isolated Condenser Leakage Treatment Method Attachment 6.A Annulus Pressurization Attachment 6.B Recirculation System Single-Loop Operation LSCS-UFSAR Table of Contents (Continued) iv REV. 13 VOLUME VI CHAPTER 7 INSTRUMENTATION AND CONTROL SYSTEMS

7.0 Instrumentation and Control Systems 7.1 Introduction 7.2 Reactor Protection System Instrumentation and Control 7.3 Engineered Safety Feature Systems 7.4 Systems Required for Safe Shutdown 7.5 Safety-Related Display Instrumentation 7.6 Other Instrumentation Systems Required for Safety 7.7 Control Systems Not Required for Safety 7.8 Status Displays ATTACHMENT 7.A Analysis of Conformance of Instrumentation and Control Systems with IEEE Criteria

CHAPTER 8 ELECTRIC POWER 8.0 Electric Power 8.1 Introduction 8.2 Offsite Power System 8.3 Onsite Power Systems 8.4 Other Electrical Features and Requirements for Safety

VOLUME VII CHAPTER 9 AUXILIARY SYSTEMS 9.0 Auxiliary Systems 9.1 Fuel Storage and Handling 9.2 Water Systems 9.3 Process Auxiliaries 9.4 Heating, Ventilation, and Air Conditioning 9.5 Other Auxiliary Systems CHAPTER 10 STEAM AND POWER CONVERSION SYSTEM 10.0 Steam and Power Conversion System 10.1 Summary Description 10.2 Turbine Generator 10.3 Main Steam Supply System 10.4 Other Features of Steam and Power Conversion System LSCS-UFSAR Table of Contents (Continued) v REV. 13 CHAPTER 11 RADIOACTIVE WASTE MANAGEMENT

11.0 Radioactive Waste Management 11.1 Source Terms 11.2 Liquid Waste Management Systems 11.3 Gaseous Waste Management Systems 11.4 Solid Waste Management System 11.5 Process and Effluent Radiological Monitoring and Sampling Systems CHAPTER 12 RADIATION PROTECTION 12.0 Radiation Protection 12.1 Ensuring that Occupational Radiation Exposures Are as Low as Reasonably Achievable 12.2 Radiation Sources 12.3 Radiation Protection Design Features 12.4 Dose Assessment 12.5 Health Physics Program VOLUME VIII CHAPTER 13 CONDUCT OF OPERATIONS

13.0 Conduct of Operations 13.1 Organizational Structures of Licensee 13.2 Training 13.3 Emergency Planning 13.4 Review and Audit 13.5 Plant Procedures 13.6 Plant Records 13.7 Industrial Security

CHAPTER 14 INITIAL TEST PROGRAM 14.0 Initial Test Program LSCS-UFSAR Table of Contents (Continued) vi REV. 15, APRIL 2004 CHAPTER 15 ACCIDENT ANALYSES

15.0 Accident Analyses 15.1 Increase in Heat Removal by the Secondary System 15.2 Decrease in Heat Removal by the Secondary System 15.3 Decrease in Reactor C oolant System Flow Rate 15.4 Reactivity and Power Distribution Anomalies 15.5 Increase in Reactor Coolant Inventory 15.6 Decrease in Reactor Coolant Inventory 15.7 Radioactive Release from Subsystems and Components 15.8 Anticipated Transients Without Scram (ATWS) 15.9 Loss of All Alternating Current Power (Station Blackout) 15.A Unit 1 Cycle 2 Safety Analyses 15.B Unit 2 Safety Analyses CHAPTER 16 TECHNICAL SPECIFICATIONS

16.0 Technical Specifications CHAPTER 17 QUALITY ASSURANCE 17.0 Quality Assurance

APPENDIX A GLOSSARY APPENDIX B CONFORMANCE TO REGULATORY GUIDES APPENDIX C ANALYSIS OF HIGH-ENERGY LINE BREAKS OUTSIDE PRIMARY CONTAINMENT APPENDIX D PLANT NUCLEAR SAFE TY OPERATIONAL ANALYSIS

APPENDIX E CONSTRUCTION MATERIAL STANDARDS AND QUALITY CONTROL PROCEDURES APPENDIX F COMPUTER PROGRAMS F.0 Computer Programs for Structural Analysis and Design F.1 Concrete F.2 CSEF-III F.3 DAPS-II F.4 DYNAS F.5 DYNAX

LSCS-UFSAR Table of Contents (Continued) via REV. 15, APRIL 2004 F.6 EASE F.7 EMBANK F.8 INDIA F.9 SETTLE F.10 KALSHEL F.11 LAFD F.12 MESHG F.13 PLFEM-II F.14 QUAD4 F.15 RGS F.16 SEPOL F.17 SHAKE F.18 SLOPE F.19 SLSAP F.20 SOR-III F.21 SSANA F.22 STAND F.23 STRESS F.24 STRUDL-II F.25 TEMCO F.26 WARLOC F.27 PIPSYS F.28 PENAN F.29 FAST F.30 REFERENCES

LSCS-UFSAR Table of Contents (Continued) vii REV. 15, APRIL 2004 APPENDIX G REACTOR RECIRCULATION SYSTEM

G.0 Reactor Recirculation System G.1 Introduction G.2 Recirculation System Design Description G.3 System Design Evaluations G.4 Testing G.5 Recirculation Pump Trip and Flow Control Features G.6 Transient Analysis G.7 References ATTACHMENT G.A REACTOR RECIRCULATION SYSTEM DESIGN DRAWINGS ATTACHMENT G.B FAILURE MODES AN D EFFECTS ANALYSES

VOLUME IX APPENDIX H DELETED - Moved to Fire Protection Report (FPR)

APPENDIX I INFORMATION RELEVANT TO KEEPING LEVELS OF RADIOACTIVITY IN EFFLUENTS TO UNRESTRICTED AREAS AS LOW AS REASONABLY ACHIEVABLE APPENDIX J ANALYSIS OF THE EFFECTS OF MODERATE ENERGY LINE THROUGH WALL LEAKAGE CRACKS OUTSIDE PRIMARY CONTAINMENT J.0 Introduction J.1 Moderate Energy Lines J.2 Plant Areas and Equipment Affected by MELB J.3 Spray Shield J.4 Effects of Flooding J.5 Conclusion APPENDIX K INTERIM OFFSITE POWER ARRANGEMENT LSCS-UFSAR Table of Contents (Continued) viii REV. 19, APRIL 2012 APPENDIX L REQUIREMENTS RESULTING FROM TMI-2 ACCIDENT

APPENDIX M ENVIRONMENTAL QUALIFICATION OF ELECTRICAL EQUIPMENT APPENDIX N INTERIM SECONDARY CONTAINMENT APPENDIX O CONTROL OF HEAVY LOADS

i REV. 14, APRIL 2002 LA SALLE COUNTY STATION UPDATED FINAL SAFETY ANALYSIS REPORT Table of Contents VOLUME I CHAPTER 1 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT 1.0 Introduction and General Description of Plant 1.1 Introduction 1.2 General Plant Description 1.3 Comparison Tables 1.4 Identification of Agents and Contractors 1.5 Requirements for Further Technical Information - Current Concerns 1.6 Material Incorporated by Reference CHAPTER 2 SITE CHARACTERISTICS

2.0 Site Characteristics 2.1 Geography and Demography 2.2 Nearby Industrial Transportation and Military Facilities 2.3 Meteorology 2.4 Hydrologic Engineering VOLUME II CHAPTER 2 (Continued) SITE CHARACTERISTICS 2.5 Geology, Seismology, an d Geotechnical Engineering Appendix 2.5A Selected Structures Outside the 200-mile Radius

LSCS-UFSAR Table of Contents (Continued) ii REV. 15, APRIL 2004 VOLUME III

CHAPTER 3 DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS 3.0 Design of Structures, Compo nents, Equipment, and Systems 3.1 Conformance with NRC General Design Criteria 3.2 Classification of Structures, Components, and Systems 3.3 Wind and Tornado Loadings 3.4 Water Level (Flood) Design 3.5 Missile Protection 3.6 Protection Against Dynamic Effects Associated with the Postulated Rupture of Piping 3.7 Seismic Design 3.8 Design of Category I Structures

VOLUME IV CHAPTER 3 (Continued) DESIGN OF STRUCTURES, COMPONENTS AND SYSTEMS 3.9 Mechanical Systems and Components 3.10 Seismic Qualification of Se ismic Category I Instrumentation and Electrical Equipment 3.11 Environmental Design of Mechanical and Electrical Equipment Attachment 3.A Deleted Attachment 3.B A Generic Upper Bound ary Probabilistic Analysis of the Effect of Recirculation Pump Missiles on Containment and Equipment in a Typical BWR 5 Mark II General Electric Boiling Water Reactor Nuclear Power Plant Attachment 3.C Category I Concrete Masonry Walls LSCS-UFSAR Table of Contents (Continued) iii REV. 15, APRIL 2004 VOLUME IV - A CHAPTER 4 REACTOR

4.0 Reactor 4.1 Summary Description 4.2 Fuel System 4.3 Nuclear Design 4.4 Thermal and Hydraulic Design 4.5 Reactor Materials 4.6 Functional Design of Reactivity Control Systems

CHAPTER 5 REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS 5.0 Reactor Coolant System and Connected Systems 5.1 Summary Description 5.2 Integrity of Reactor Coolant Pressure Boundary 5.3 Reactor Vessel 5.4 Component and Subsystem Design VOLUME V CHAPTER 6 ENGINEERED SAFETY FEATURES

6.0 Engineered Safety Features 6.1 Engineered Safety Feature Materials 6.2 Containment Systems 6.3 Emergency Core Cooling Systems 6.4 Habitability Systems 6.5 Fission Product Removal and Control Systems 6.6 Inservice Inspection of ASME Code Class 2 and 3 Components 6.7 Main Steam Isolation Valve Leakage Control System (MSIV-LCS) - Unit 2 deleted, Unit 1 Abandoned in Place 6.8 Main Steam Isolation Valve - Isolated Condenser Leakage Treatment Method Attachment 6.A Annulus Pressurization Attachment 6.B Recirculation System Single-Loop Operation LSCS-UFSAR Table of Contents (Continued) iv REV. 13 VOLUME VI CHAPTER 7 INSTRUMENTATION AND CONTROL SYSTEMS

7.0 Instrumentation and Control Systems 7.1 Introduction 7.2 Reactor Protection System Instrumentation and Control 7.3 Engineered Safety Feature Systems 7.4 Systems Required for Safe Shutdown 7.5 Safety-Related Display Instrumentation 7.6 Other Instrumentation Systems Required for Safety 7.7 Control Systems Not Required for Safety 7.8 Status Displays ATTACHMENT 7.A Analysis of Conformance of Instrumentation and Control Systems with IEEE Criteria

CHAPTER 8 ELECTRIC POWER 8.0 Electric Power 8.1 Introduction 8.2 Offsite Power System 8.3 Onsite Power Systems 8.4 Other Electrical Features and Requirements for Safety

VOLUME VII CHAPTER 9 AUXILIARY SYSTEMS 9.0 Auxiliary Systems 9.1 Fuel Storage and Handling 9.2 Water Systems 9.3 Process Auxiliaries 9.4 Heating, Ventilation, and Air Conditioning 9.5 Other Auxiliary Systems CHAPTER 10 STEAM AND POWER CONVERSION SYSTEM 10.0 Steam and Power Conversion System 10.1 Summary Description 10.2 Turbine Generator 10.3 Main Steam Supply System 10.4 Other Features of Steam and Power Conversion System LSCS-UFSAR Table of Contents (Continued) v REV. 13 CHAPTER 11 RADIOACTIVE WASTE MANAGEMENT

11.0 Radioactive Waste Management 11.1 Source Terms 11.2 Liquid Waste Management Systems 11.3 Gaseous Waste Management Systems 11.4 Solid Waste Management System 11.5 Process and Effluent Radiological Monitoring and Sampling Systems CHAPTER 12 RADIATION PROTECTION 12.0 Radiation Protection 12.1 Ensuring that Occupational Radiation Exposures Are as Low as Reasonably Achievable 12.2 Radiation Sources 12.3 Radiation Protection Design Features 12.4 Dose Assessment 12.5 Health Physics Program VOLUME VIII CHAPTER 13 CONDUCT OF OPERATIONS

13.0 Conduct of Operations 13.1 Organizational Structures of Licensee 13.2 Training 13.3 Emergency Planning 13.4 Review and Audit 13.5 Plant Procedures 13.6 Plant Records 13.7 Industrial Security

CHAPTER 14 INITIAL TEST PROGRAM 14.0 Initial Test Program LSCS-UFSAR Table of Contents (Continued) vi REV. 15, APRIL 2004 CHAPTER 15 ACCIDENT ANALYSES

15.0 Accident Analyses 15.1 Increase in Heat Removal by the Secondary System 15.2 Decrease in Heat Removal by the Secondary System 15.3 Decrease in Reactor C oolant System Flow Rate 15.4 Reactivity and Power Distribution Anomalies 15.5 Increase in Reactor Coolant Inventory 15.6 Decrease in Reactor Coolant Inventory 15.7 Radioactive Release from Subsystems and Components 15.8 Anticipated Transients Without Scram (ATWS) 15.9 Loss of All Alternating Current Power (Station Blackout) 15.A Unit 1 Cycle 2 Safety Analyses 15.B Unit 2 Safety Analyses CHAPTER 16 TECHNICAL SPECIFICATIONS

16.0 Technical Specifications CHAPTER 17 QUALITY ASSURANCE 17.0 Quality Assurance

APPENDIX A GLOSSARY APPENDIX B CONFORMANCE TO REGULATORY GUIDES APPENDIX C ANALYSIS OF HIGH-ENERGY LINE BREAKS OUTSIDE PRIMARY CONTAINMENT APPENDIX D PLANT NUCLEAR SAFE TY OPERATIONAL ANALYSIS

APPENDIX E CONSTRUCTION MATERIAL STANDARDS AND QUALITY CONTROL PROCEDURES APPENDIX F COMPUTER PROGRAMS F.0 Computer Programs for Structural Analysis and Design F.1 Concrete F.2 CSEF-III F.3 DAPS-II F.4 DYNAS F.5 DYNAX

LSCS-UFSAR Table of Contents (Continued) via REV. 15, APRIL 2004 F.6 EASE F.7 EMBANK F.8 INDIA F.9 SETTLE F.10 KALSHEL F.11 LAFD F.12 MESHG F.13 PLFEM-II F.14 QUAD4 F.15 RGS F.16 SEPOL F.17 SHAKE F.18 SLOPE F.19 SLSAP F.20 SOR-III F.21 SSANA F.22 STAND F.23 STRESS F.24 STRUDL-II F.25 TEMCO F.26 WARLOC F.27 PIPSYS F.28 PENAN F.29 FAST F.30 REFERENCES

LSCS-UFSAR Table of Contents (Continued) vii REV. 15, APRIL 2004 APPENDIX G REACTOR RECIRCULATION SYSTEM

G.0 Reactor Recirculation System G.1 Introduction G.2 Recirculation System Design Description G.3 System Design Evaluations G.4 Testing G.5 Recirculation Pump Trip and Flow Control Features G.6 Transient Analysis G.7 References ATTACHMENT G.A REACTOR RECIRCULATION SYSTEM DESIGN DRAWINGS ATTACHMENT G.B FAILURE MODES AN D EFFECTS ANALYSES

VOLUME IX APPENDIX H DELETED - Moved to Fire Protection Report (FPR)

APPENDIX I INFORMATION RELEVANT TO KEEPING LEVELS OF RADIOACTIVITY IN EFFLUENTS TO UNRESTRICTED AREAS AS LOW AS REASONABLY ACHIEVABLE APPENDIX J ANALYSIS OF THE EFFECTS OF MODERATE ENERGY LINE THROUGH WALL LEAKAGE CRACKS OUTSIDE PRIMARY CONTAINMENT J.0 Introduction J.1 Moderate Energy Lines J.2 Plant Areas and Equipment Affected by MELB J.3 Spray Shield J.4 Effects of Flooding J.5 Conclusion APPENDIX K INTERIM OFFSITE POWER ARRANGEMENT LSCS-UFSAR Table of Contents (Continued) viii REV. 19, APRIL 2012 APPENDIX L REQUIREMENTS RESULTING FROM TMI-2 ACCIDENT

APPENDIX M ENVIRONMENTAL QUALIFICATION OF ELECTRICAL EQUIPMENT APPENDIX N INTERIM SECONDARY CONTAINMENT APPENDIX O CONTROL OF HEAVY LOADS