ENS 57243: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 15: Line 15:
| NRC officer = Adam Koziol
| NRC officer = Adam Koziol
| event date = 07/23/2024 00:00 EDT
| event date = 07/23/2024 00:00 EDT
| last update date = 11/13/2025
| last update date = 12/04/2025
| title = Part 21 Report - NON-COMPLAINT Insulated Conductor
| title = Part 21 Report - NON-COMPLAINT Insulated Conductor
| event text = The following is a synopsis of information received via fax:
| event text = The following is a synopsis of information received via fax:
Line 72: Line 72:
The vendor provided an update on their ongoing evaluation. The vendor continues to receive product from their customers to perform testing and evaluations. Test results for completed testing have been forwarded to customers. The process is still ongoing.
The vendor provided an update on their ongoing evaluation. The vendor continues to receive product from their customers to perform testing and evaluations. Test results for completed testing have been forwarded to customers. The process is still ongoing.
Notified R1DO (Lilliendahl), R3DO (Ziolkowski), R4DO (Vossmar), and Part 21 group (Email).
Notified R1DO (Lilliendahl), R3DO (Ziolkowski), R4DO (Vossmar), and Part 21 group (Email).
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251114en.html#en57243
* * * UPDATE ON 12/04/2025 AT 1602 EST FROM CAROL GROSSO TO KERBY SCALES * * *
The vendor provided an update on their ongoing evaluation. The vendor continues to receive product from their customers to perform testing and evaluations. Test results for completed testing have been forwarded to customers. The process is still ongoing.
Notified R1DO (Schussler), R3DO (Hills), R4DO (Deese), and Part 21 group via email.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251205en.html#en57243
}}
}}


{{ENS-Nav}}
{{ENS-Nav}}

Latest revision as of 07:20, 5 December 2025

ENS 57243 +/-
Where
Rscc Dba Marmon
East Granby, Connecticut (NRC Region 1)
Organization: Rscc Dba Marmon
Reporting
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
Time - Person (Reporting Time:+55.08 h2.295 days <br />0.328 weeks <br />0.0754 months <br />)
Opened: Phillip Sargenski
11:05 Jul 25, 2024
NRC Officer: Adam Koziol
Last Updated: Dec 4, 2025
57243 - NRC Website