ENS 57997: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 20: Line 20:
On October 21, 2025, at 2108 EDT, Unit 1 automatically tripped from 74 percent power due to a negative rate trip. The unit has been stabilized in mode 3 at normal operating temperature and pressure. The reactor trip was uncomplicated, and all control rods fully inserted into the core. This reactor protection system actuation is reportable per 10 CFR 50.72(b)(2)(iv)(B). The auxiliary feedwater pumps actuated as designed because of the reactor trip and is reportable per 10 CFR 50.72(b)(3)(iv)(A) for a valid engineered safety feature (ESF) actuation. Decay heat is being removed via the steam generator power-operated relief valves and Unit 1 is in a normal shutdown electrical lineup. Unit 2 was not affected by this event.
On October 21, 2025, at 2108 EDT, Unit 1 automatically tripped from 74 percent power due to a negative rate trip. The unit has been stabilized in mode 3 at normal operating temperature and pressure. The reactor trip was uncomplicated, and all control rods fully inserted into the core. This reactor protection system actuation is reportable per 10 CFR 50.72(b)(2)(iv)(B). The auxiliary feedwater pumps actuated as designed because of the reactor trip and is reportable per 10 CFR 50.72(b)(3)(iv)(A) for a valid engineered safety feature (ESF) actuation. Decay heat is being removed via the steam generator power-operated relief valves and Unit 1 is in a normal shutdown electrical lineup. Unit 2 was not affected by this event.
The NRC Resident Inspector has been notified.
The NRC Resident Inspector has been notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251022en.html#en57997
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251023en.html#en57997
}}{{unit info
}}{{unit info
| Unit = 1
| Unit = 1

Latest revision as of 06:20, 23 October 2025

ENS 57997 +/-
Where
North Anna Dominion icon.png
Virginia (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation
Time - Person (Reporting Time:+-1.97 h-0.0821 days <br />-0.0117 weeks <br />-0.0027 months <br />)
Opened: Nick Wilson
23:10 Oct 21, 2025
NRC Officer: Josue Ramirez
Last Updated: Oct 21, 2025
57997 - NRC Website
Loading map...