ML16228A528: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 13: | Line 13: | ||
| document type = Legal-Correspondence/Miscellaneous | | document type = Legal-Correspondence/Miscellaneous | ||
| page count = 2 | | page count = 2 | ||
| project = CAC:MF7265, CAC:MF7266 | |||
}} | |||
=Text= | |||
{{#Wiki_filter: UNITED STATESNUCLEAR REGULATORY COMMISSIONWASHINGTON, DC 20555 - 0001 August 15, 2016 Lawrence G. McDade, Chair Dr. Michael F. Kennedy Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Mail Stop: T-3 F23 Mail Stop: T-3 F23 Washington, D.C. 20555 Washington, D.C. 20555 Dr. Richard E. Wardwell Administrative Judge Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Mail Stop: T-3 F23 Washington, D.C. 20555 In the Matter of ENTERGY NUCLEAR OPERATIONS, INC. (Indian Point Nuclear Generating Unit Nos. 2 and 3) Docket Nos. 50-247-LR/286-LR Dear Administrative Judges: | |||
In the parties' "Third Joint Status Report Regarding Proposed Track 2 Schedule" (June 28, 2016), the NRC Staff ("Staff") stated that it "presently expects that the results of its [Indian Point Unit 2 baffle-former bolt] inspections 'will be provided in an upcoming publicly available inspection report by August 15, 2016.'" | |||
The Staff in NRC Region I has informed me that its second quarter 2016 integrated inspection report for Indian Point Units 2 and 3, which it had previously expected to issue today, has been delayed. The Staff currently expects to issue the inspection report within the next one to two weeks. | |||
Respectfully, /Signed (electronically) by/ | |||
Sherwin E. Turk Counsel for NRC Staff cc: EIE Service List UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247/286-LR ) (Indian Point Nuclear Generating ) Units 2 and 3) ) | |||
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (as revised), I hereby certify that copies of the foregoing letter from Sherwin E. Turk to the Atomic Safety and Licensing Board, dated August 15, 2016, has been served upon the Electronic Information Exchange (the NRC's E-Filing System), in the above-captioned proceeding, this 15th day of August, 2016. /Signed (electronically) by/ ______________________________ Sherwin E. Turk Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 287-9194 E-mail: Sherwin.Turk@nrc.gov | |||
}} | }} |
Revision as of 07:22, 21 March 2018
ML16228A528 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 08/15/2016 |
From: | Turk S E NRC/OGC |
To: | Kennedy M F, McDade L G, Wardwell R E Atomic Safety and Licensing Board Panel |
SECY RAS | |
References | |
50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01, RAS 51267 | |
Download: ML16228A528 (2) | |
Text
UNITED STATESNUCLEAR REGULATORY COMMISSIONWASHINGTON, DC 20555 - 0001 August 15, 2016 Lawrence G. McDade, Chair Dr. Michael F. Kennedy Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Mail Stop: T-3 F23 Mail Stop: T-3 F23 Washington, D.C. 20555 Washington, D.C. 20555 Dr. Richard E. Wardwell Administrative Judge Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Mail Stop: T-3 F23 Washington, D.C. 20555 In the Matter of ENTERGY NUCLEAR OPERATIONS, INC. (Indian Point Nuclear Generating Unit Nos. 2 and 3) Docket Nos. 50-247-LR/286-LR Dear Administrative Judges:
In the parties' "Third Joint Status Report Regarding Proposed Track 2 Schedule" (June 28, 2016), the NRC Staff ("Staff") stated that it "presently expects that the results of its [Indian Point Unit 2 baffle-former bolt] inspections 'will be provided in an upcoming publicly available inspection report by August 15, 2016.'"
The Staff in NRC Region I has informed me that its second quarter 2016 integrated inspection report for Indian Point Units 2 and 3, which it had previously expected to issue today, has been delayed. The Staff currently expects to issue the inspection report within the next one to two weeks.
Respectfully, /Signed (electronically) by/
Sherwin E. Turk Counsel for NRC Staff cc: EIE Service List UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247/286-LR ) (Indian Point Nuclear Generating ) Units 2 and 3) )
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (as revised), I hereby certify that copies of the foregoing letter from Sherwin E. Turk to the Atomic Safety and Licensing Board, dated August 15, 2016, has been served upon the Electronic Information Exchange (the NRC's E-Filing System), in the above-captioned proceeding, this 15th day of August, 2016. /Signed (electronically) by/ ______________________________ Sherwin E. Turk Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 287-9194 E-mail: Sherwin.Turk@nrc.gov