ENS 57175: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 21: Line 21:
This event is being reported as a 4-hour non-emergency notification in accordance with 10 CFR 50.72(b)(2)(iv)(B) as an actuation of the reactor protection system when the reactor is critical and as an 8-hour non-emergency notification in accordance with 10 CFR 50.72(b)(3)(iv)(A) as a valid actuation of the EFW system.
This event is being reported as a 4-hour non-emergency notification in accordance with 10 CFR 50.72(b)(2)(iv)(B) as an actuation of the reactor protection system when the reactor is critical and as an 8-hour non-emergency notification in accordance with 10 CFR 50.72(b)(3)(iv)(A) as a valid actuation of the EFW system.
The NRC Resident Inspector has been notified.
The NRC Resident Inspector has been notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/20240617en.html#en57175
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/20240618en.html#en57175
}}{{unit info
}}{{unit info
| Unit = 3
| Unit = 3

Revision as of 06:20, 18 June 2024

ENS 57175 +/-
Where
Waterford Entergy icon.png
Louisiana (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
LER: 05000382/LER-2024-004
Automatic Reactor Trip Due to Lightning Strike
Time - Person (Reporting Time:+-0.87 h-0.0363 days <br />-0.00518 weeks <br />-0.00119 months <br />)
Opened: Kylie Granier
16:41 Jun 16, 2024
NRC Officer: Kerby Scales
Last Updated: Jun 16, 2024
57175 - NRC Website
Loading map...