ENS 56894: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 9: Line 9:
| unit = 1
| unit = 1
| utype = GE-6
| utype = GE-6
| cfr = 10 CFR 50.72(b)(2)(iv)(B)
| cfr = 10 CFR 50.72(b)(2)(iv)(B), 10 CFR 50.72(b)(3)(iv)(A)
| emergency class = Non Emergency
| emergency class = Non Emergency
| notification date = 12/16/2023 08:22
| notification date = 12/16/2023 08:22

Latest revision as of 15:55, 4 January 2024

ENS 56894 +/-
Where
Grand Gulf Entergy icon.png
Mississippi (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-1.47 h-0.0613 days <br />-0.00875 weeks <br />-0.00201 months <br />)
Opened: Mike Riehl
08:22 Dec 16, 2023
NRC Officer: Dan Livermore
Last Updated: Dec 18, 2023
56894 - NRC Website
Loading map...