ML20054M945: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
                                                                                              ,
,
  '  '
-//b cd
                                                                                      -//b cd
'
                                            JUN 181982
'
        South Carolina Electric and Gas Company
JUN 181982
        ATTN: Mr. O. W. Di xon , Jr.
South Carolina Electric and Gas Company
                Vice President, Nuclear Operations
ATTN: Mr. O. W. Di xon , Jr.
        P. O. Box 764 (Mail Code F-04)
Vice President, Nuclear Operations
        Columbia, SC 29218
P. O. Box 764 (Mail Code F-04)
        Gentlemen:
Columbia, SC 29218
        Subject: Report No. 50-395/82-37
Gentlemen:
        This refers to the routine safety inspection conducted by Mr. P. A. Taylor of
Subject: Report No. 50-395/82-37
        this office on June 7-9,     1982, of activities authorized by NRC Construction
This refers to the routine safety inspection conducted by Mr. P. A. Taylor of
        Permit No. 50-395/82-37 for the V. C. Summer facility and to the discussion of
this office on June 7-9,
        our findirgs held with Mr. O. S. Bradham, Station Manager, at the conclusion of
1982, of activities authorized by NRC Construction
        the inspection.
Permit No. 50-395/82-37 for the V. C. Summer facility and to the discussion of
        Areas examined during the inspection and our findings are discussed in the
our findirgs held with Mr. O. S. Bradham, Station Manager, at the conclusion of
        enclosed inspection report.     Within these areas, the inspection consisted of
the inspection.
        selective examinations of procedures and representative records, interviews with
Areas examined during the inspection and our findings are discussed in the
        personnel, and observations by the inspector.
enclosed inspection report.
        Within the scope of this inspection, no violations or deviations were disclosed.
Within these areas, the inspection consisted of
        In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
selective examinations of procedures and representative records, interviews with
        be placed in the NRC's Public Document Room unless you notify this office, by
personnel, and observations by the inspector.
        telephone, within ten days of the date of this letter and submit written
Within the scope of this inspection, no violations or deviations were disclosed.
        application to withhold information contained therein within thirty days of the
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
        date of this letter. Such application must be consistent with the requirements
be placed in the NRC's Public Document Room unless you notify this office, by
        of 10 CFR 2.790(b)(1).
telephone, within ten days of the date of this letter and submit written
        Should you have any questions concerning this letter, we will be glad to discuss
application to withhold information contained therein within thirty days of the
        them with you.
date of this letter. Such application must be consistent with the requirements
                                            Sincerely,
of 10 CFR 2.790(b)(1).
                                              h>*7n W
Should you have any questions concerning this letter, we will be glad to discuss
                                            H. C. Dance, Chief
them with you.
                                            Reactor Projects Branch 2
Sincerely,
                                            Division of Project and
h>*7n W
                                              Resident Programs
H. C. Dance, Chief
        Enclosure:
Reactor Projects Branch 2
        See Page 2
Division of Project and
    8207150179 820618
Resident Programs
    PDR ADOCK 05000395
Enclosure:
    G                 PDR
See Page 2
                                                                                        TEo/
8207150179 820618
PDR ADOCK 05000395
G
PDR
TEo/


.   .
.
  .     .
.
      South Carolina Electric and Gas   2               JUN 18 1982
.
      Enclosure:
.
      Inspection Report No. 50-395/82-37
JUN 18 1982
      cc w/ enc 1:
South Carolina Electric and Gas
      J. B. Knotts, Jr.
2
      O. S. Bradham, Station Manager
Enclosure:
      J. P. Harrison, Manager Nuclear
Inspection Report No. 50-395/82-37
          Security
cc w/ enc 1:
      C. A. Price, Manager, Nuclear
J. B. Knotts, Jr.
          Engineering
O. S. Bradham, Station Manager
      A. A. Smith, Site QA Coordinator
J. P. Harrison, Manager Nuclear
      bcc w/ encl:
Security
      Document Management Branch
C. A. Price, Manager, Nuclear
      State of South Carolina
Engineering
      NRC Resident Inspector
A. A. Smith, Site QA Coordinator
      RII                 RII           RII,s   RII           RII
bcc w/ encl:
              W
Document Management Branch
      PATayfot:es         FJape
State of South Carolina
                                jf         bIY
NRC Resident Inspector
                                          ARHerdt JFfogge       [ifDanceh
RII
  4' %/ /}l82               6/jj/82       6/zq/82 6/ '/82       64f/82
RII
RII,s
RII
RII
PATayfot:es
jf
bIY
JFfogge
[ifDanceh
W
FJape
ARHerdt
4' %/ }l82
6/jj/82
6/zq/82
6/ '/82
64f/82
/
}}
}}

Latest revision as of 16:28, 17 December 2024

Forwards IE Insp Rept 50-395/82-37 on 820607-09.No Noncompliance Noted
ML20054M945
Person / Time
Site: Summer 
Issue date: 06/18/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20054M946 List:
References
NUDOCS 8207150179
Download: ML20054M945 (2)


See also: IR 05000395/1982037

Text

-

,

-//b cd

'

'

JUN 181982

South Carolina Electric and Gas Company

ATTN: Mr. O. W. Di xon , Jr.

Vice President, Nuclear Operations

P. O. Box 764 (Mail Code F-04)

Columbia, SC 29218

Gentlemen:

Subject: Report No. 50-395/82-37

This refers to the routine safety inspection conducted by Mr. P. A. Taylor of

this office on June 7-9,

1982, of activities authorized by NRC Construction

Permit No. 50-395/82-37 for the V. C. Summer facility and to the discussion of

our findirgs held with Mr. O. S. Bradham, Station Manager, at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

h>*7n W

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure:

See Page 2

8207150179 820618

PDR ADOCK 05000395

G

PDR

TEo/

.

.

.

.

JUN 18 1982

South Carolina Electric and Gas

2

Enclosure:

Inspection Report No. 50-395/82-37

cc w/ enc 1:

J. B. Knotts, Jr.

O. S. Bradham, Station Manager

J. P. Harrison, Manager Nuclear

Security

C. A. Price, Manager, Nuclear

Engineering

A. A. Smith, Site QA Coordinator

bcc w/ encl:

Document Management Branch

State of South Carolina

NRC Resident Inspector

RII

RII

RII,s

RII

RII

PATayfot:es

jf

bIY

JFfogge

[ifDanceh

W

FJape

ARHerdt

4' %/ }l82

6/jj/82

6/zq/82

6/ '/82

64f/82

/