TXX-4752, Forwards Comanche Peak Response Team Result Repts,Including Rev 1 to ISAP:I.a.4,Agreement Between Drawings & Field Terminations, Rev 1 to ISAP:I.b.3,Conduit to Cable Tray Separation & Rev 1 to ISAP:VII.b.2,Valve Disassembly: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:f         CPRT-0347                                                                 LOG NO. TXX-4752 FILE NO. 10068 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER e 400 NORTH OtJVE STREET, L.B. A B . IBAIJ AN. TEXAS 7530 t g-HS April       4,   1986
{{#Wiki_filter:f CPRT-0347 LOG NO. TXX-4752 FILE NO. 10068 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER e 400 NORTH OtJVE STREET, L.B. A B. IBAIJ AN. TEXAS 7530 t
    .EU8e.*0E.7Ai Mr. Vincent S. Noonan Director of Nuclear Reactor Regulation Comanche Peak Project Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555
-HS April 4,
1986 g
.EU8e.*0E.7Ai Mr. Vincent S.
Noonan Director of Nuclear Reactor Regulation Comanche Peak Project Division of Licensing U.
S.
Nuclear Regulatory Commission Washington, D. C.
20555


==SUBJECT:==
==SUBJECT:==
Line 25: Line 31:


==Dear Mr. Noonan:==
==Dear Mr. Noonan:==
 
We transmit herewith the SRT approved Results Reports listed below.
We transmit herewith the SRT approved Results Reports listed below. The files which contain supporting documentation for the Results Reports have been reproduced in their entirety and are available for public inspection in our Dallas i         office.     Anyone wishing to inspect these files should I       contact Ms. Susan Palmer (214/979-8242).
The files which contain supporting documentation for the Results Reports have been reproduced in their entirety and are available for public inspection in our Dallas i
I.a.4       Agreement Between Drawings and Field Terminations I.b.3       Conduit to Cable Tray Separation II.b       Concrete Compression Strength III d       Preoperational Testing VII.b.2     Valve Disassembly We shall issue future Results Reports on a periodic basis as they are approved by the CPRT Senior Review Team.
office.
Very truly yours, W. G. Counsil WGC:tj Enclosure I
Anyone wishing to inspect these files should I
contact Ms. Susan Palmer (214/979-8242).
I.a.4 Agreement Between Drawings and Field Terminations I.b.3 Conduit to Cable Tray Separation II.b Concrete Compression Strength III d Preoperational Testing VII.b.2 Valve Disassembly We shall issue future Results Reports on a periodic basis as they are approved by the CPRT Senior Review Team.
Very truly yours, W.
G.
Counsil WGC:tj Enclosure I
qM M4TDanMU$P A
qM M4TDanMU$P A
A vsysssox orisxAs urss2rsss ssxcrasc courAny
A vsysssox orisxAs urss2rsss ssxcrasc courAny


CPRT-0344                                                           LOG NO. TUS-4829 FILE NO. 10068 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER e 400 NORTH OLIVE ETREET. L.B. 81 e DALLAS. TEXAS 75301 April 3,       1986
CPRT-0344 LOG NO. TUS-4829 FILE NO. 10068 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER e 400 NORTH OLIVE ETREET. L.B. 81 e DALLAS. TEXAS 75301 April 3, 1986
  #8e*0E.5lE" MEMORANDUM TO:   Mr. W. G. Counsil
#8e*0E.5lE" MEMORANDUM TO:
Mr.
W. G. Counsil


==SUBJECT:==
==SUBJECT:==
CPRT RESULTS REPORTS i
CPRT RESULTS REPORTS i
We transmit herewith the SRT approved Results Reports listed                                           i below. The files which contain supporting documentation for the Results Reports have been reproduced and are available in the Dallas file room for public inspection.
We transmit herewith the SRT approved Results Reports listed below.
l I.a.4       Agreement Between Drawings and Field Terminations                                         j l
The files which contain supporting documentation for the Results Reports have been reproduced and are available in the Dallas file room for public inspection.
I.b.3       Conduit to Cable Tray Separation II.b         Concrete Compression Strength III.d       Preoperational Testing VII.b.2     Valve Disassembly w W.s%av) -j wm                     --
l I.a.4 Agreement Between Drawings and Field Terminations j
fhnW.       Beck Chairman, CPRT Senior Review Team JWB:tj Enclosures cc:   CPRT File A DIVISION Of TEXAB U11LETTES E12CTRIC COMPANY}}
l I.b.3 Conduit to Cable Tray Separation II.b Concrete Compression Strength III.d Preoperational Testing VII.b.2 Valve Disassembly w
s% ) -j wm W. av fhnW.
Beck
: Chairman, CPRT Senior Review Team JWB:tj Enclosures cc:
CPRT File A DIVISION Of TEXAB U11LETTES E12CTRIC COMPANY}}

Latest revision as of 22:27, 10 December 2024

Forwards Comanche Peak Response Team Result Repts,Including Rev 1 to ISAP:I.a.4,Agreement Between Drawings & Field Terminations, Rev 1 to ISAP:I.b.3,Conduit to Cable Tray Separation & Rev 1 to ISAP:VII.b.2,Valve Disassembly
ML20155B113
Person / Time
Site: Comanche Peak  
Issue date: 04/04/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Noonan V
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
Shared Package
ML20155B118 List:
References
CON-#286-671 CPRT-0347, OL, TXX-4752, NUDOCS 8604100236
Download: ML20155B113 (2)


Text

f CPRT-0347 LOG NO. TXX-4752 FILE NO. 10068 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER e 400 NORTH OtJVE STREET, L.B. A B. IBAIJ AN. TEXAS 7530 t

-HS April 4,

1986 g

.EU8e.*0E.7Ai Mr. Vincent S.

Noonan Director of Nuclear Reactor Regulation Comanche Peak Project Division of Licensing U.

S.

Nuclear Regulatory Commission Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION CPRT RESULTS REPORTS

Dear Mr. Noonan:

We transmit herewith the SRT approved Results Reports listed below.

The files which contain supporting documentation for the Results Reports have been reproduced in their entirety and are available for public inspection in our Dallas i

office.

Anyone wishing to inspect these files should I

contact Ms. Susan Palmer (214/979-8242).

I.a.4 Agreement Between Drawings and Field Terminations I.b.3 Conduit to Cable Tray Separation II.b Concrete Compression Strength III d Preoperational Testing VII.b.2 Valve Disassembly We shall issue future Results Reports on a periodic basis as they are approved by the CPRT Senior Review Team.

Very truly yours, W.

G.

Counsil WGC:tj Enclosure I

qM M4TDanMU$P A

A vsysssox orisxAs urss2rsss ssxcrasc courAny

CPRT-0344 LOG NO. TUS-4829 FILE NO. 10068 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER e 400 NORTH OLIVE ETREET. L.B. 81 e DALLAS. TEXAS 75301 April 3, 1986

  1. 8e*0E.5lE" MEMORANDUM TO:

Mr.

W. G. Counsil

SUBJECT:

CPRT RESULTS REPORTS i

We transmit herewith the SRT approved Results Reports listed below.

The files which contain supporting documentation for the Results Reports have been reproduced and are available in the Dallas file room for public inspection.

l I.a.4 Agreement Between Drawings and Field Terminations j

l I.b.3 Conduit to Cable Tray Separation II.b Concrete Compression Strength III.d Preoperational Testing VII.b.2 Valve Disassembly w

s% ) -j wm W. av fhnW.

Beck

Chairman, CPRT Senior Review Team JWB:tj Enclosures cc:

CPRT File A DIVISION Of TEXAB U11LETTES E12CTRIC COMPANY