TXX-6122, Interim Deficiency Rept CP-86-08 Re Control of Stamps Used to Identify Super Hilti Kwik Bolts.Initially Reported on 860206.Ultrasonic Testing Will Be Completed by 870227.Next Rept Anticipated by 870320: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
Log # TXX-6122 File # 10110       _1 903.9     =
Log # TXX-6122 File # 10110
TEXAS UTILITIES GENERATING COMPANY                                                           f SKYWAY TOWER . ese NORTH OLIVE STREEr. 3.15. 83 . DALL.AB. TEXAS THOI                           q December 1, 1986                                                       $
_1 903.9
m??,"tff.0:A                                                                               3 @IE Mr. Eric H. Johnson, Director                                                           DEC - 91986            e E
=
i                 Division of Reactor Safety and Projects                                                                   #      [
TEXAS UTILITIES GENERATING COMPANY f
U. S. Nuclear Regulatory Commission                                               _ __
SKYWAY TOWER. ese NORTH OLIVE STREEr. 3.15. 83. DALL.AB. TEXAS THOI q
611 Ryan Plaza Drive, Suite 1000                                                                           -
December 1, 1986 m??,"tff.0:A 3 @IE DEC - 91986 e
Arlington, TX 76011                                                                                                   -
Mr. Eric H. Johnson, Director E
a
[
[                
i Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 a
[


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)                                                         -
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446                                                                     I l
DOCKET NOS. 50-445 AND 50-446 I
'                            INSTALLATION OF SUPER HILTI KWIK BOLTS                                                           =
l INSTALLATION OF SUPER HILTI KWIK BOLTS
SDAR: CP-86-08 (INTERIM REPORT)                                                                   }
=
SDAR: CP-86-08 (INTERIM REPORT)
}


==Dear Mr. Johnson:==
==Dear Mr. Johnson:==
On February 6,1986, we verbally notified your Mr. T. F. Westerman of a                                       1 deficiency involving the control of stamps used to identify Super Hilti Kwik                                     4l Bolts. This is an interim report of a potentially reportable item under the                                   .3 -
On February 6,1986, we verbally notified your Mr. T. F. Westerman of a 1
provisions of 10CFR50.55(e). Our latest interim report, logged TXX-4963, was                                 e submitted on August 22, 1986.                                                                                   "
deficiency involving the control of stamps used to identify Super Hilti Kwik 4l Bolts.
l As noted in our previous response, the portion of this deficiency which                                       5 involves ASME installations has been completed without the identification of conditions adverse to safety. All installations were evaluated and determined                                 $
This is an interim report of a potentially reportable item under the
to be acceptable "as-is".                                                                                               ,
.3 -
For the portion of this issue involving non-ASME applications (such as cable                                         _
provisions of 10CFR50.55(e). Our latest interim report, logged TXX-4963, was "e
tray supports, structural steel, conduit supports, and electrical equipment                                   y, installations), our evaluation is continuing.                     This effort, which consists of             ?
submitted on August 22, 1986.
ultrasonic testing of a sample of non-ASME installations, must be completed                                   a prior to our assessment of the possible adverse effects of this deficiency.                                     F' These testing activities are currently scheduled for completion on February                                   E_
l As noted in our previous response, the portion of this deficiency which 5
involves ASME installations has been completed without the identification of conditions adverse to safety. All installations were evaluated and determined to be acceptable "as-is".
For the portion of this issue involving non-ASME applications (such as cable tray supports, structural steel, conduit supports, and electrical equipment y,
installations), our evaluation is continuing.
This effort, which consists of
?
ultrasonic testing of a sample of non-ASME installations, must be completed a
prior to our assessment of the possible adverse effects of this deficiency.
F' These testing activities are currently scheduled for completion on February E_
27, 1987.
27, 1987.
4 We anticipate submitting our next report by March 20, 1987.                                                     -
4 We anticipate submitting our next report by March 20, 1987.
Very truly yours,                         ;
Very truly yours,
                                                                                                                                =
=
                                                                                                                  .            E s
8612160441 861201
8612160441 861201                                           /               /                       6- -
/
PDR S
/
ADOCK 05000445 PDR
E 6- -
                                                                                      /     ,
s PDR ADOCK 05000445
                                                                                                ' '      g
/
* 2 l                                                                                     W. G. Counsil                               ,,'
g S
!                GLB/mlh                                                                                                                 -
PDR 2
c - NRC Region IV (0 + 1 copy)
l W. G. Counsil GLB/mlh c - NRC Region IV (0 + 1 copy)
!                      Director, Inspection & Enforcement (15 copies)                                                           '
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission                                                                       %
U. S. Nuclear Regulatory Commission Washington, D.C.
Washington, D.C. 20555                                                                                   g A unusum or rms twmas ruernic <<mmr                                     1
20555 g
    % -1400                                                                                                      i   o   IEZ7    _p
% -1400 A unusum or rms twmas ruernic <<mmr 1
                                                                                                                                  ;}}
IEZ7
_p i o
_...}}

Latest revision as of 22:50, 3 December 2024

Interim Deficiency Rept CP-86-08 Re Control of Stamps Used to Identify Super Hilti Kwik Bolts.Initially Reported on 860206.Ultrasonic Testing Will Be Completed by 870227.Next Rept Anticipated by 870320
ML20215D661
Person / Time
Site: Comanche Peak  
Issue date: 12/01/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-08, CP-86-8, TXX-6122, NUDOCS 8612160441
Download: ML20215D661 (1)


Text

.

Log # TXX-6122 File # 10110

_1 903.9

=

TEXAS UTILITIES GENERATING COMPANY f

SKYWAY TOWER. ese NORTH OLIVE STREEr. 3.15. 83. DALL.AB. TEXAS THOI q

December 1, 1986 m??,"tff.0:A 3 @IE DEC - 91986 e

Mr. Eric H. Johnson, Director E

[

i Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 a

[

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 I

l INSTALLATION OF SUPER HILTI KWIK BOLTS

=

SDAR: CP-86-08 (INTERIM REPORT)

}

Dear Mr. Johnson:

On February 6,1986, we verbally notified your Mr. T. F. Westerman of a 1

deficiency involving the control of stamps used to identify Super Hilti Kwik 4l Bolts.

This is an interim report of a potentially reportable item under the

.3 -

provisions of 10CFR50.55(e). Our latest interim report, logged TXX-4963, was "e

submitted on August 22, 1986.

l As noted in our previous response, the portion of this deficiency which 5

involves ASME installations has been completed without the identification of conditions adverse to safety. All installations were evaluated and determined to be acceptable "as-is".

For the portion of this issue involving non-ASME applications (such as cable tray supports, structural steel, conduit supports, and electrical equipment y,

installations), our evaluation is continuing.

This effort, which consists of

?

ultrasonic testing of a sample of non-ASME installations, must be completed a

prior to our assessment of the possible adverse effects of this deficiency.

F' These testing activities are currently scheduled for completion on February E_

27, 1987.

4 We anticipate submitting our next report by March 20, 1987.

Very truly yours,

=

8612160441 861201

/

/

E 6- -

s PDR ADOCK 05000445

/

g S

PDR 2

l W. G. Counsil GLB/mlh c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 g

% -1400 A unusum or rms twmas ruernic <<mmr 1

IEZ7

_p i o

_...