ML21005A026: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ES-301 | {{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: | ||
: a. Start HPCS with failure of manual pushbutton (S-HP-05) | LaSalle Date of Examination: | ||
11/2020 Exam Level: RO SRO-I SRO-U Operating Test Number: | |||
2020301 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code* | |||
Safety Function | |||
: a. Start HPCS with failure of manual pushbutton (S-HP-05) | |||
[209002 A4.05 3.8/3.8] | [209002 A4.05 3.8/3.8] | ||
: b. Start Off-Gas with Main Steam High Radiation (S-OG-02) | A, D, EN, L, S 2 | ||
: b. Start Off-Gas with Main Steam High Radiation (S-OG-02) | |||
[271000 A2.03 3.5/3.8] | [271000 A2.03 3.5/3.8] | ||
A, D, L, S 9 | |||
: c. N/A | : c. N/A | ||
: d. Bypass a Failed Local Power Range Monitor (S-NR-01) | : d. Bypass a Failed Local Power Range Monitor (S-NR-01) | ||
[215005 A4.04 3.2/3.2] | [215005 A4.04 3.2/3.2] | ||
: e. Monthly Notch Withdrawal Surveillance (S-RD-01) | D, S 7 | ||
: e. Monthly Notch Withdrawal Surveillance (S-RD-01) | |||
[201002 A4.01 3.5/3.4] | [201002 A4.01 3.5/3.4] | ||
: f. Establish Normal Nitrogen Makeup to the Drywell (S-VQ-14) | D, S 1 | ||
: f. Establish Normal Nitrogen Makeup to the Drywell (S-VQ-14) | |||
[223001 A4.10 3.2/3.2] | [223001 A4.10 3.2/3.2] | ||
: g. Respond to Loss of Bus 142X (S-AP-07) | M, S 5 | ||
: g. Respond to Loss of Bus 142X (S-AP-07) | |||
[295003 AA2.01 3.4/3.7] | [295003 AA2.01 3.4/3.7] | ||
: h. Respond to a Loss of Shutdown Cooling due to Pump Trip | A, D, S 6 | ||
: h. Respond to a Loss of Shutdown Cooling due to Pump Trip | |||
[205000 A2.06 3.4/3.5] | [205000 A2.06 3.4/3.5] | ||
A, L, N, S 4 | |||
In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U | In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U | ||
: i. Remove Fuses for a Stuck Open SRV (P-NB-01) | : i. Remove Fuses for a Stuck Open SRV (P-NB-01) | ||
[239002 A2.03 4.1/4.2] LaSalle 2016 NRC ILT Exam | [239002 A2.03 4.1/4.2] LaSalle 2016 NRC ILT Exam P, E, R 3 | ||
: j. Defeat RCIC Isolations IAW LGA-RI-101 (P-RI-02) | : j. Defeat RCIC Isolations IAW LGA-RI-101 (P-RI-02) | ||
[295031 EA1.05 4.3/4.3] | [295031 EA1.05 4.3/4.3] | ||
: k. Respond to low Service Water Pressure due to Failed Open TCV | D, E, R, L 2 | ||
: k. Respond to low Service Water Pressure due to Failed Open TCV IAW LOA-WS-101 [400000 K6.01 2.7/2.8] | |||
A, N, E, R 8 | |||
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room. | |||
ES-301 | ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 | ||
* Type Codes | * Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A) | ||
(L)ow-Power/Shutdown | (P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1}} | ||
Latest revision as of 11:41, 29 November 2024
| ML21005A026 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 12/01/2020 |
| From: | Gregory Roach Operations Branch III |
| To: | Exelon Generation Co, NRC/RGN-III/DRS/OLB |
| Roach G | |
| Shared Package | |
| ML19127A359 | List: |
| References | |
| Download: ML21005A026 (2) | |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:
LaSalle Date of Examination:
11/2020 Exam Level: RO SRO-I SRO-U Operating Test Number:
2020301 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*
Safety Function
- a. Start HPCS with failure of manual pushbutton (S-HP-05)
[209002 A4.05 3.8/3.8]
A, D, EN, L, S 2
- b. Start Off-Gas with Main Steam High Radiation (S-OG-02)
[271000 A2.03 3.5/3.8]
A, D, L, S 9
- c. N/A
- d. Bypass a Failed Local Power Range Monitor (S-NR-01)
[215005 A4.04 3.2/3.2]
D, S 7
- e. Monthly Notch Withdrawal Surveillance (S-RD-01)
[201002 A4.01 3.5/3.4]
D, S 1
- f. Establish Normal Nitrogen Makeup to the Drywell (S-VQ-14)
[223001 A4.10 3.2/3.2]
M, S 5
- g. Respond to Loss of Bus 142X (S-AP-07)
[295003 AA2.01 3.4/3.7]
A, D, S 6
- h. Respond to a Loss of Shutdown Cooling due to Pump Trip
[205000 A2.06 3.4/3.5]
A, L, N, S 4
In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
- i. Remove Fuses for a Stuck Open SRV (P-NB-01)
[239002 A2.03 4.1/4.2] LaSalle 2016 NRC ILT Exam P, E, R 3
[295031 EA1.05 4.3/4.3]
D, E, R, L 2
- k. Respond to low Service Water Pressure due to Failed Open TCV IAW LOA-WS-101 [400000 K6.01 2.7/2.8]
A, N, E, R 8
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2
- Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1