ML22340A144: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UFSAR Revision 31.0 16.4       REVISED PER 98-UFSAR-0779                                 UNIT 2 REV. NO.                          DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER              Isometric Mainsteam from Steam Turbine to COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP              Containment Penetration Sleeve Unit No.2 BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.2-1          SH 1 of 1
{{#Wiki_filter:16.4 REVISED PER 98-UFSAR-0779 UNIT 2


UFSAR Revision 31.0 30" Line Break 30" Line Break 30" Line Break 30" Line Break 4" Line Break 4" Line Break
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Isometric Mainsteam from Steam Turbine to COOK NUCLEAR PLANT Containment Penetration Sleeve Unit No.2 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.2-1 SH 1 of 1 30" Line Break
 
30" Line Break
 
30" Line Break
 
30" Line Break
 
4" Line Break
 
4" Line Break
: 1. This drawing is to show the High Energy Line Break Locations only and cannot be used for any construction purposes. For detail information and dimensions see Piping Iso.'s.
: 1. This drawing is to show the High Energy Line Break Locations only and cannot be used for any construction purposes. For detail information and dimensions see Piping Iso.'s.
High Energy Line Break Locations are labeled as shown with Symbol 4"/30" Line Break.
High Energy Line Break Locations are labeled as shown with Symbol 4"/30" Line Break.
: 2. All dimensions & Elevations are Reference only.
: 2. All dimensions & Elevations are Reference only.
16.6    REVISED PER 99-UFSAR-1345                                            UNIT 2 REV. NO.                          DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER                  Isometric Mainsteam From Steam Turbine to COOK NUCLEAR PLANT Containment Penetration Sleeve for Unit 1 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.2-1A                        SH 1 of 1


UFSAR Revision 31.0 16.4       REVISED PER 98-UFSAR-0779                                 UNIT 2 REV. NO.                         DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER             Isometric of Feedwater from Heaters # 6A &
16.6 REVISED PER 99-UFSAR-1345 UNIT 2
COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP              6B to Steam Generators Unit No. 2 BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.2-2           SH 1 of 1
 
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Isometric Mainsteam From Steam Turbine to COOK NUCLEAR PLANT Containment Penetration Sleeve for Unit 1 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.2-1A SH 1 of 1 16.4 REVISED PER 98-UFSAR-0779 UNIT 2
 
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Isometric of Feedwater from Heaters # 6A &
COOK NUCLEAR PLANT 6B to Steam Generators Unit No. 2 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.2-2 SH 1 of 1 6" Line Break
 
14" Line Break 6" Line Break 14" Line Break
 
14" Line Break
 
6" Line Break 14" Line Break


UFSAR Revision 31.0 6" Line Break 14" Line Break 6" Line Break 14" Line Break 14" Line Break 6" Line Break                          14" Line Break 6" Line Break
6" Line Break
: 1. This drawing is to show the High Energy Line Break Locations only and cannot be used for any construction purposes. For detail information and dimensions see Piping Iso.'s.
: 1. This drawing is to show the High Energy Line Break Locations only and cannot be used for any construction purposes. For detail information and dimensions see Piping Iso.'s.
High Energy Line Break Locations are labeled as shown with Symbol 6"/14" Line Break.
High Energy Line Break Locations are labeled as shown with Symbol 6"/14" Line Break.
: 2. All dimensions & Elevations are Reference only.
: 2. All dimensions & Elevations are Reference only.
16.6      REVISED PER 99-UFSAR-1345                                                  UNIT 2 REV. NO.                        DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER              Isometric Feedwater from Heaters 6A and 6B to Steam COOK NUCLEAR PLANT                Generators for Unit 1 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.2-2A                                SH 1 of 1


UFSAR Revision 31.0 16.6 16.6 REVISED PER UCR 99-UFSAR-1307 HI ENERGY LINE BREAK EQUIP/SOURCE ARRG'T MEZZANINE FL. EL. 609'-0" UNITS NO. 1 & 2 FSAR FIG. 14.4.2 - 7 UNIT 2
16.6 REVISED PER 99-UFSAR-1345 UNIT 2
 
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Isometric Feedwater from Heaters 6A and 6B to Steam COOK NUCLEAR PLANT Generators for Unit 1 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.2-2A SH 1 of 1 16.6
 
16.6REVISED PER UCR 99-UFSAR-1307
 
HI ENERGY LINE BREAK EQUIP/SOURCE ARRG'T MEZZANINE FL. EL. 609'-0" UNITS NO. 1 & 2 FSAR FIG. 14.4.2 - 7
 
UNIT 2 16.6 REVISED PER 99-UFSAR-1345 UNIT 2
 
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLESchematic of West Steam Enclosure/Main Steam COOK NUCLEAR PLANT Accessway NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO.FSAR FIG. 14.4.6-1 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2
 
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLETMD Network for West Steam Enclosure/Main Steam COOK NUCLEAR PLANT Accessway NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO.FSAR FIG. 14.4.6-2 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2


UFSAR Revision 31.0 16.6        REVISED PER 99-UFSAR-1345                                  UNIT 2 REV. NO.                         DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER             Schematic of West Steam Enclosure/Main Steam COOK NUCLEAR PLANT                 Accessway NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-1                    SH 1 of 1
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLESchematic of East Steam Enclosure COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-3 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2


UFSAR Revision 31.0 16.6        REVISED PER 99-UFSAR-1345                                  UNIT 2 REV. NO.                         DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER             TMD Network for West Steam Enclosure/Main Steam COOK NUCLEAR PLANT                 Accessway NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-2                  SH 1 of 1
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLETMD Network for East Steam Enclosure COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-4 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345UNIT 2


UFSAR Revision 31.0 16.6        REVISED PER 99-UFSAR-1345                                UNIT 2 REV. NO.                         DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER             Schematic of East Steam Enclosure COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-3                SH 1 of 1
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Peak Environmental Parameters (West Main Steam COOK NUCLEAR PLANT Enclosure and Accessway) (Structural Qualification)
NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-5 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2


UFSAR Revision 31.0 16.6        REVISED PER 99-UFSAR-1345                                  UNIT 2 REV. NO.                         DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER             TMD Network for East Steam Enclosure COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-4                  SH 1 of 1
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Peak Environmental Parameter (East Main Steam COOK NUCLEAR PLANT Enclosure) (Structural Qualification)
NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-6 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2


UFSAR Revision 31.0 16.6        REVISED PER 99-UFSAR-1345                                    UNIT 2 REV. NO.                         DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER             Peak Environmental Parameters (West Main Steam COOK NUCLEAR PLANT                 Enclosure and Accessway) (Structural Qualification)
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE East Main Steam Enclosure Pressure Profile in COOK NUCLEAR PLANT Elements 2 and 3 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-8 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2
NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-5                        SH 1 of 1


UFSAR Revision 31.0 16.6        REVISED PER 99-UFSAR-1345                                    UNIT 2 REV. NO.                         DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER             Peak Environmental Parameter (East Main Steam COOK NUCLEAR PLANT                 Enclosure) (Structural Qualification)
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Feedwater Line Break in Main Steam Accessway COOK NUCLEAR PLANT (Element 7) Pressure VS. Time NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-11 SH 1 of 1 UNIT 2
NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-6                    SH 1 of 1


UFSAR Revision 31.0 16.6         REVISED PER 99-UFSAR-1345                                   UNIT 2 REV. NO.                          DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER              East Main Steam Enclosure Pressure Profile in COOK NUCLEAR PLANT                  Elements 2 and 3 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-8                      SH 1 of 1
16.6 Revised per 99-UFSAR-1345 UNIT 2


UFSAR Revision 31.0 16.6        REVISED PER 99-UFSAR-1345                                  UNIT 2 REV. NO.                         DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER             Feedwater Line Break in Main Steam Accessway COOK NUCLEAR PLANT                 (Element 7) Pressure VS. Time NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-11                  SH 1 of 1
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE LAYOUT AND IDENTIFICATION OF WALLS AND SLABS FOR EAST MAIN COOK NUCLEAR PLANT STEAM ENCLOSURE, WEST MAIN STEAM ENCLOSURE, MAIN STEAM NUCLEAR GENERATION GROUP ACCESSWAY BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-1 SH 1 of 1 16.6 UNIT 2REVISED PER 99-UFSAR-1345


UFSAR Revision 31.0 UNIT 2 16.6        Revised per 99-UFSAR-1345 UNIT 2 REV. NO.                           DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER         TITLE LAYOUT AND IDENTIFICATION OF WALLS AND SLABS FOR EAST MAIN COOK NUCLEAR PLANT                 STEAM ENCLOSURE, WEST MAIN STEAM ENCLOSURE, MAIN STEAM NUCLEAR GENERATION GROUP               ACCESSWAY BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-1                        SH 1 of 1
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Isometric View of Main Steam Enclosure Accessway COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP West of Containment BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-2 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2


UFSAR Revision 31.0 16.6        REVISED PER 99-UFSAR-1345                                      UNIT 2 REV. NO.                           DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER               Isometric View of Main Steam Enclosure Accessway COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP               West of Containment BRIDGMAN, MICHIGAN DWG. NO.       FSAR FIG. 14.4.8-2            SH 1 of 1
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Yield Line Pattern for Panels with Three Edges Fixed & One Edge COOK NUCLEAR PLANT Unsupported Subjected to Uniformly Distributed Load NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-3 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2


UFSAR Revision 31.0 16.6      REVISED PER 99-UFSAR-1345                                                          UNIT 2 REV. NO.                       DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER       TITLE Yield Line Pattern for Panels with Three Edges Fixed & One Edge COOK NUCLEAR PLANT               Unsupported Subjected to Uniformly Distributed Load NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-3                                    SH 1 of 1
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Yield Line Pattern for Panels with Four Edges Fixed Subjected to COOK NUCLEAR PLANT Uniformly Distributed Load NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-4 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2


UFSAR Revision 31.0 16.6        REVISED PER 99-UFSAR-1345                                                    UNIT 2 REV. NO.                           DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER       TITLE Yield Line Pattern for Panels with Four Edges Fixed Subjected to COOK NUCLEAR PLANT                 Uniformly Distributed Load NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-4                              SH 1 of 1
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Yield Line Pattern for Panels with Four Edges Fixed Subjected to COOK NUCLEAR PLANT Concentrated Point Load NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-5 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2


UFSAR Revision 31.0 16.6        REVISED PER 99-UFSAR-1345                                                    UNIT 2 REV. NO.                         DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER         TITLE Yield Line Pattern for Panels with Four Edges Fixed Subjected to COOK NUCLEAR PLANT                 Concentrated Point Load NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-5                              SH 1 of 1
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Yield Line Pattern for Panels with Three Edges Fixed and Fourth COOK NUCLEAR PLANT Edge Free Subjected to a Concentrated Point Load at the Free NUCLEAR GENERATION GROUP Edge BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-6 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2


UFSAR Revision 31.0 16.6        REVISED PER 99-UFSAR-1345                                                  UNIT 2 REV. NO.                         DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER         TITLE Yield Line Pattern for Panels with Three Edges Fixed and Fourth COOK NUCLEAR PLANT                 Edge Free Subjected to a Concentrated Point Load at the Free NUCLEAR GENERATION GROUP               Edge BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-6                              SH 1 of 1
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Yield Line Patterns for Panels with Three Edges Fixed and Fourth COOK NUCLEAR PLANT Edge Free Subjected to a Concentrated Point Load at Interior NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-7 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2


UFSAR Revision 31.0 16.6        REVISED PER 99-UFSAR-1345                                                  UNIT 2 REV. NO.                         DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER         TITLE Yield Line Patterns for Panels with Three Edges Fixed and Fourth COOK NUCLEAR PLANT                 Edge Free Subjected to a Concentrated Point Load at Interior NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-7                              SH 1 of 1
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE East Steam Enclosure COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.9-1 SH 1 of 1 1 of 4


UFSAR Revision 31.0 16.6        REVISED PER 99-UFSAR-1345                      UNIT 2 REV. NO.                          DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER              East Steam Enclosure COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.9-1 SH 1 of 1
1 of 8


UFSAR Revision 31.0 1 of 4 1 of 8 16.6         REVISED PER 99-UFSAR-1345                     UNIT 2 REV. NO.                           DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER               West Steam Enclosure COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.9-2 SH 1 of 1}}
16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE West Steam Enclosure COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.9-2 SH 1 of 1}}

Revision as of 15:55, 15 November 2024

1 to Updated Final Safety Analysis Report, Chapter 14.4, Figures 14.4.2-1 to 14.4.9-2 (Unit 2)
ML22340A144
Person / Time
Site: Cook  
Issue date: 11/30/2022
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML22340A137 List: ... further results
References
AEP-NRC-2022-62
Download: ML22340A144 (1)


Text

16.4 REVISED PER 98-UFSAR-0779 UNIT 2

REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Isometric Mainsteam from Steam Turbine to COOK NUCLEAR PLANT Containment Penetration Sleeve Unit No.2 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.2-1 SH 1 of 1 30" Line Break

30" Line Break

30" Line Break

30" Line Break

4" Line Break

4" Line Break

1. This drawing is to show the High Energy Line Break Locations only and cannot be used for any construction purposes. For detail information and dimensions see Piping Iso.'s.

High Energy Line Break Locations are labeled as shown with Symbol 4"/30" Line Break.

2. All dimensions & Elevations are Reference only.

16.6 REVISED PER 99-UFSAR-1345 UNIT 2

REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Isometric Mainsteam From Steam Turbine to COOK NUCLEAR PLANT Containment Penetration Sleeve for Unit 1 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.2-1A SH 1 of 1 16.4 REVISED PER 98-UFSAR-0779 UNIT 2

REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Isometric of Feedwater from Heaters # 6A &

COOK NUCLEAR PLANT 6B to Steam Generators Unit No. 2 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.2-2 SH 1 of 1 6" Line Break

14" Line Break 6" Line Break 14" Line Break

14" Line Break

6" Line Break 14" Line Break

6" Line Break

1. This drawing is to show the High Energy Line Break Locations only and cannot be used for any construction purposes. For detail information and dimensions see Piping Iso.'s.

High Energy Line Break Locations are labeled as shown with Symbol 6"/14" Line Break.

2. All dimensions & Elevations are Reference only.

16.6 REVISED PER 99-UFSAR-1345 UNIT 2

REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Isometric Feedwater from Heaters 6A and 6B to Steam COOK NUCLEAR PLANT Generators for Unit 1 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.2-2A SH 1 of 1 16.6

16.6REVISED PER UCR 99-UFSAR-1307

HI ENERGY LINE BREAK EQUIP/SOURCE ARRG'T MEZZANINE FL. EL. 609'-0" UNITS NO. 1 & 2 FSAR FIG. 14.4.2 - 7

UNIT 2 16.6 REVISED PER 99-UFSAR-1345 UNIT 2

REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLESchematic of West Steam Enclosure/Main Steam COOK NUCLEAR PLANT Accessway NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO.FSAR FIG. 14.4.6-1 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2

REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLETMD Network for West Steam Enclosure/Main Steam COOK NUCLEAR PLANT Accessway NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO.FSAR FIG. 14.4.6-2 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2

REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLESchematic of East Steam Enclosure COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-3 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2

REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLETMD Network for East Steam Enclosure COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-4 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345UNIT 2

REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Peak Environmental Parameters (West Main Steam COOK NUCLEAR PLANT Enclosure and Accessway) (Structural Qualification)

NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-5 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2

REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Peak Environmental Parameter (East Main Steam COOK NUCLEAR PLANT Enclosure) (Structural Qualification)

NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-6 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2

REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE East Main Steam Enclosure Pressure Profile in COOK NUCLEAR PLANT Elements 2 and 3 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-8 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2

REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Feedwater Line Break in Main Steam Accessway COOK NUCLEAR PLANT (Element 7) Pressure VS. Time NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-11 SH 1 of 1 UNIT 2

16.6 Revised per 99-UFSAR-1345 UNIT 2

REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE LAYOUT AND IDENTIFICATION OF WALLS AND SLABS FOR EAST MAIN COOK NUCLEAR PLANT STEAM ENCLOSURE, WEST MAIN STEAM ENCLOSURE, MAIN STEAM NUCLEAR GENERATION GROUP ACCESSWAY BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-1 SH 1 of 1 16.6 UNIT 2REVISED PER 99-UFSAR-1345

REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Isometric View of Main Steam Enclosure Accessway COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP West of Containment BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-2 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2

REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Yield Line Pattern for Panels with Three Edges Fixed & One Edge COOK NUCLEAR PLANT Unsupported Subjected to Uniformly Distributed Load NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-3 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2

REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Yield Line Pattern for Panels with Four Edges Fixed Subjected to COOK NUCLEAR PLANT Uniformly Distributed Load NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-4 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2

REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Yield Line Pattern for Panels with Four Edges Fixed Subjected to COOK NUCLEAR PLANT Concentrated Point Load NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-5 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2

REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Yield Line Pattern for Panels with Three Edges Fixed and Fourth COOK NUCLEAR PLANT Edge Free Subjected to a Concentrated Point Load at the Free NUCLEAR GENERATION GROUP Edge BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-6 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2

REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Yield Line Patterns for Panels with Three Edges Fixed and Fourth COOK NUCLEAR PLANT Edge Free Subjected to a Concentrated Point Load at Interior NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-7 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2

REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE East Steam Enclosure COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.9-1 SH 1 of 1 1 of 4

1 of 8

16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE West Steam Enclosure COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.9-2 SH 1 of 1