{{#Wiki_filter:fl Xcel Energy                                                              1717 Wakonade Drive Welch, MN 55089 October 6, 2022                                                               L-PI-22-040 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed Facility Operating License DPR-42 and DPR-60 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections
{{#Wiki_filter:1717 Wakonade Drive
 
Welch, MN 55089 fl Xcel Energy
 
October 6, 2022 L-PI-22-040 10 CFR 50.90
 
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
 
Prairie Island Nuclear Generating Plant Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed Facility Operating License DPR-42 and DPR-60
 
Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections


==References:==
==References:==
: 1) Letter L-PI-22-003 from NSPM to NRC, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, dated June 7, 2022 In Reference 1, Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter NSPM), submitted a license amendment request (LAR) to the Technical Specifications (TS) for the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2. The LAR proposed to adopt TSTF-577 to revise the TS related to steam generator tube inspections and reporting based on operating history.
: 1) Letter L-PI-22-003 from NSPM to NRC, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Insp ections, dated June 7, 2022
The enclosed updated TS 5.6.7 markups (Enclosure 1 to this letter) and clean TS 5.6.7 pages (Enclosure 2 to this letter) resolve formatting issues with the TS markups and TS clean pages provided with Reference 1 and will align the proposed TS 5.6.7 punctuation and conjunctions with the standard TS 5.6.7 and TSTF-577.
 
In Reference 1, Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter NSPM), submitted a license amendment request (LAR) to the Technical Specifications (TS) for the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2. The LAR proposed to adopt TSTF-577 to revise the TS related to steam generator tube inspections and reporting based on operating history.
 
The enclosed updated TS 5.6.7 markups (Enclo sure 1 to this letter) and clean TS 5.6.7 pages (Enclosure 2 to this letter) resolve formatting issues with the TS markups and TS clean pages provided with Reference 1 and will align the proposed TS 5.6.7 punctuation and conjunctions with the standard TS 5.6.7 and TSTF-577.
 
The information in this letter does not alter the evaluations performed in accordance with 10 CFR 50.92 in Reference 1.
The information in this letter does not alter the evaluations performed in accordance with 10 CFR 50.92 in Reference 1.
NSPM is notifying the State of Minnesota of this supplement by transmitting a copy of this letter and enclosures to the designated State Official.
NSPM is notifying the State of Minnesota of this supplement by transmitting a copy of this letter and enclosures to the designated State Official.
Please contact Mr. Jeff Kivi at (612) 330-5788 or Jeffrey.L.Kivi@xcelenergy.com if there are any questions or if additional information is needed.
Please contact Mr. Jeff Kivi at (612) 330-5788 or Jeffrey.L.Kivi@xcelenergy.com if there are any questions or if additional information is needed.


Document Control Desk L-Pl-22-040 Page 2 Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
Document Control Desk L-Pl-22-040 Page 2
 
Summary of Commitments
 
This letter makes no new commitments and no revisions to existing commitments.
 
I declare under penalty of perjury, that the foregoing is true and correct.
I declare under penalty of perjury, that the foregoing is true and correct.
Executed on Oc e ~
Executed on Oc e ~* 2022.
* 2022.
,- ~
                                  ,-       ~
 
Christopher P. Domingos Site Vice President, Monticello, and Prairie Island Nuclear Generating Plants Northern States Power Company - Minnesota Enclosures cc:   Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC State of Minnesota
Christopher P. Domingos Site Vice President, Monticello, and Prairie Island Nuclear Generating Plants Northern States Power Company - Minnesota
 
Enclosures
 
cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC State of Minnesota ENCLOSURE 1
 
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2
 
Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections
 
TECHNICAL SPECIFICATION PAGES (Markups)


ENCLOSURE 1 PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections TECHNICAL SPECIFICATION PAGES (Markups)
(2 pages follow)
(2 pages follow)
Reporting Requirements 5.6


Reporting Requirements 5.6 5.6       Reporting Requirements (continued) 5.6.7         Steam Generator Tube Inspection Report A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Specification 5.5.8, Steam Generator (SG) Program. The report shall include:                                                 ;
5.6 Reporting Requirements (continued)
 
5.6.7 Steam Generator Tube Inspection Report
 
A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Specification 5.5.8, Steam Generator (SG) Program. The report shall include:
: a. The scope of inspections performed on each SG,
: a. The scope of inspections performed on each SG,
: b. Degradation mechanisms found,
: b. Degradation mechanisms found,
Line 45: Line 80:
: f. The number and percentage of tubes plugged to date, and the effective plugging percentage in each steam generator, and
: f. The number and percentage of tubes plugged to date, and the effective plugging percentage in each steam generator, and
: g. The results of condition monitoring, including the results of tube pulls and in-situ testing.
: g. The results of condition monitoring, including the results of tube pulls and in-situ testing.
INSERT B Prairie Island                                              Unit 1 - Amendment No. 238 Units 1 and 2                                5.6-8          Unit 2 - Amendment No. 226


INSERT B
Prairie Island Unit 1 - Amendment No. 238 Units 1 and 2 5.6-8 Unit 2 - Amendment No. 226
: b. The nondestructive examination techniques utilized for tubes with increased degradation susceptibility;
 
: c. For each degradation mechanism found:
ENCLOSURE 2
: 1. The nondestructive examination techniques utilized;
 
: 2. The location, orientation (if linear), measured size (if available), and voltage response for each indication. For tube wear at support structures less than 20 percent through-wall, only the total number of indications needs to be reported;
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2
: 3. A description of the condition monitoring assessment and results, including the margin to the tube integrity performance criteria and comparison with the margin predicted to exist at the inspection by the previous forward-looking tube integrity assessment; and
 
: 4. The number of tubes plugged during the inspection outage.
Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections
: d. An analysis summary of the tube integrity conditions predicted to exist at the next scheduled inspection (the forward-looking tube integrity assessment) relative to the applicable performance criteria, including the analysis methodology, inputs, and results;
 
: e. The number and percentage of tubes plugged to date, and the effective plugging percentage in each SG; and
TECHNICAL SPECIFICATION PAGES (Re-typed)
: f. The results of any SG secondary side inspections.


ENCLOSURE 2 PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections TECHNICAL SPECIFICATION PAGES (Re-typed)
(1 page follows)
(1 page follows)
Reporting Requirements 5.6
5.6 Reporting Requirements (continued)
5.6.7 Steam Generator Tube Inspection Report


Reporting Requirements 5.6 5.6      Reporting Requirements (continued) 5.6.7          Steam Generator Tube Inspection Report A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Specification 5.5.8, Steam Generator (SG) Program. The report shall include:
A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Specification 5.5.8, Steam Generator (SG) Program. The report shall include:
: a. The scope of inspections performed on each SG;
: a. The scope of inspections performed on each SG;
: b. The nondestructive examination techniques utilized for tubes with increased degradation susceptibility;
: b. The nondestructive examination techniques utilized for tubes with increased degradation susceptibility;
Line 73: Line 110:
: e. The number and percentage of tubes plugged to date, and the effective plugging percentage in each SG; and
: e. The number and percentage of tubes plugged to date, and the effective plugging percentage in each SG; and
: f. The results of any SG secondary side inspections.
: f. The results of any SG secondary side inspections.
Prairie Island                                               Unit 1 - Amendment No. TBD Units 1 and 2                               5.6-8           Unit 2 - Amendment No. TBD}}
 
Prairie Island Unit 1 - Amendment No. TBD Units 1 and 2 5.6-8 Unit 2 - Amendment No. TBD}}

Revision as of 02:07, 16 November 2024

Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections
ML22279B046
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 10/06/2022
From: Domingos C
Northern States Power Company, Minnesota, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-PI-22-040
Download: ML22279B046 (7)


Text

1717 Wakonade Drive

Welch, MN 55089 fl Xcel Energy

October 6, 2022 L-PI-22-040 10 CFR 50.90

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Prairie Island Nuclear Generating Plant Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed Facility Operating License DPR-42 and DPR-60

Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections

References:

1) Letter L-PI-22-003 from NSPM to NRC, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Insp ections, dated June 7, 2022

In Reference 1, Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter NSPM), submitted a license amendment request (LAR) to the Technical Specifications (TS) for the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2. The LAR proposed to adopt TSTF-577 to revise the TS related to steam generator tube inspections and reporting based on operating history.

The enclosed updated TS 5.6.7 markups (Enclo sure 1 to this letter) and clean TS 5.6.7 pages (Enclosure 2 to this letter) resolve formatting issues with the TS markups and TS clean pages provided with Reference 1 and will align the proposed TS 5.6.7 punctuation and conjunctions with the standard TS 5.6.7 and TSTF-577.

The information in this letter does not alter the evaluations performed in accordance with 10 CFR 50.92 in Reference 1.

NSPM is notifying the State of Minnesota of this supplement by transmitting a copy of this letter and enclosures to the designated State Official.

Please contact Mr. Jeff Kivi at (612) 330-5788 or Jeffrey.L.Kivi@xcelenergy.com if there are any questions or if additional information is needed.

Document Control Desk L-Pl-22-040 Page 2

Summary of Commitments

This letter makes no new commitments and no revisions to existing commitments.

I declare under penalty of perjury, that the foregoing is true and correct.

Executed on Oc e ~* 2022.

,- ~

Christopher P. Domingos Site Vice President, Monticello, and Prairie Island Nuclear Generating Plants Northern States Power Company - Minnesota

Enclosures

cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC State of Minnesota ENCLOSURE 1

PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2

Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections

TECHNICAL SPECIFICATION PAGES (Markups)

(2 pages follow)

Reporting Requirements 5.6

5.6 Reporting Requirements (continued)

5.6.7 Steam Generator Tube Inspection Report

A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Specification 5.5.8, Steam Generator (SG) Program. The report shall include:

a. The scope of inspections performed on each SG,
b. Degradation mechanisms found,
c. Nondestructive examination techniques utilized for each degradation mechanism,
d. Location, orientation (if linear), and measured sizes (if available) of service induced indications,
e. Number of tubes plugged during the inspection outage for each degradation mechanism,
f. The number and percentage of tubes plugged to date, and the effective plugging percentage in each steam generator, and
g. The results of condition monitoring, including the results of tube pulls and in-situ testing.

Prairie Island Unit 1 - Amendment No. 238 Units 1 and 2 5.6-8 Unit 2 - Amendment No. 226

ENCLOSURE 2

PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2

Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections

TECHNICAL SPECIFICATION PAGES (Re-typed)

(1 page follows)

Reporting Requirements 5.6

5.6 Reporting Requirements (continued)

5.6.7 Steam Generator Tube Inspection Report

A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Specification 5.5.8, Steam Generator (SG) Program. The report shall include:

a. The scope of inspections performed on each SG;
b. The nondestructive examination techniques utilized for tubes with increased degradation susceptibility;
c. For each degradation mechanism found:
1. The nondestructive examination techniques utilized;
2. The location, orientation (if linear), measured size (if available),

and voltage response for each indication. For tube wear at support structures less than 20 percent through-wall, only the total number of indications needs to be reported;

3. A description of the condition monitoring assessment and results, including the margin to the tube integrity performance criteria and comparison with the margin predicted to exist at the inspection by the previous forward-looking tube integrity assessment; and
4. The number of tubes plugged during the inspection outage.
d. An analysis summary of the tube integrity conditions predicted to exist at the next scheduled inspection (the forward-looking tube integrity assessment) relative to the applicable performance criteria, including the analysis methodology, inputs, and results;
e. The number and percentage of tubes plugged to date, and the effective plugging percentage in each SG; and
f. The results of any SG secondary side inspections.