|
|
Line 5: |
Line 5: |
| {{mechanical vocabulary}} | | {{mechanical vocabulary}} |
|
| |
|
| {{topi-Nav}} | | {{topic-Nav}} |
Latest revision as of 09:23, 15 October 2022
The Overtravel is the control rod position beyond the normal full-out notch position.
Reed switches are also provided at locations that are beyond the limits of normal rod movement. If the rod drive piston moves to the full-out overtravel position, an alarm is sounded in the Control Room. The overtravel alarm provides a means to verify that the drive-to-rod coupling is intact, because with the coupling in its normal condition, the drive cannot be physically withdrawn to the overtravel position. Coupling integrity can be checked by attempting to withdraw the drive to the overtravel position.
|
---|
|
Accumulator, Annulus, Babbitt, Backflow preventer, Backseat, Bellows, Bonnet, Bore, Bourdon tube, Braze, Check valve, Clam shell, Clevis, Cotter pin, Coupling, Cremone, Damper, Densitometer, Diaphragm, Differential flow, Door closer, Dowel, Fire wrap, Flange, Full out position, Fuller's earth, Galling, Gasket, Gauge, Globe valve, Grommet, Grout, Header, Heat number, Heat trace, Hoop stress, Lagging, Lash adjuster, Louver, Lube oil, Magnatorque, Manifold, Muffin fan, Overtravel, Penetration, Reboiler, Safe end, Shim, Short cycling, Skid... further results |
Topic |
---|
|
|
All by date | | Start date | Site | Title |
---|
ML24229A157 | 22 August 2024 | | ACRS NuScale Sdaa FSAR Chapters 7, 9, 12, 18 Subcommittee Meeting | ML24107B130 | 26 April 2024 | | Accident Sequence Precursor Program 2023 Annual Report | IR 05000440/2024001 | 24 April 2024 | Perry | Integrated Inspection Report 05000440/2024001 | ML24103A214 | 5 April 2024 | Susquehanna | Technical Specifications Bases, Manual | ML24103A215 | 5 April 2024 | Susquehanna | Revision to Technical Bases Manual | ML24039A188 | 27 February 2024 | Susquehanna | Issuance of Amendment Nos. 286 and 270 Changes to Technical Specifications for Control Rods | 05000263/LER-2023-002, Reactor Scram and Containment Isolation Due to Valve Responses During Main Turbine Control Valve Testing | 13 November 2023 | Monticello | Reactor Scram and Containment Isolation Due to Valve Responses During Main Turbine Control Valve Testing | IR 05000261/2023003 | 7 November 2023 | Robinson | – Integrated Inspection Report 05000261 2023003 and 07200060 2023001 | ML23291A396 | 12 October 2023 | Susquehanna | 1 to Updated Final Safety Analysis Report, Chapter 4, Section 4.6, Fictional Design of Reactivity Control Systems | ML23291A422 | 12 October 2023 | Susquehanna | 1 to Updated Final Safety Analysis Report, Chapter 7, Section 7.7, Controls Systems Not Required for Safety |
|
---|