7 I_ | 7 I_ | ||
9 | |||
*o* | |||
Florida E932Y | Florida E932Y | ||
: : : J;u November 4, 1994 3F1194-02 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 | : : : J;u November 4, 1994 3F1194-02 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 | ||
| Line 26: | Line 27: | ||
==References:== | ==References:== | ||
A. NRC to FPC letter, 3N0994-16, dated September 22, 1994 B. FPC to NRC letter, 3F0894-03, dated August 12, 1994 | A. | ||
NRC to FPC letter, 3N0994-16, dated September 22, 1994 B. | |||
FPC to NRC letter, 3F0894-03, dated August 12, 1994 | |||
==Dear Sir:== | ==Dear Sir:== | ||
Reference A requested Florida Power Corporation (FPC) to provide additional information to facilitate the completion of the NRC staff's review of the Crystal River Unit 3 (CR-3) Fifth Tendon Surveillance Report (Reference B). | |||
Reference A requested Florida Power Corporation (FPC) to provide additional information to facilitate the completion of the NRC staff's review of the Crystal River Unit 3 (CR-3) Fifth Tendon Surveillance Report (Reference B). FPC is reviewing your request for information and will provide a response by December 15, 1994. The majority of the information requested is based upon the guidance of Regulatory Guide (RG) 1.35 Revision 3. The guidance in the RG was not the licensing basis of CR-3 when the surveillance was performed. Nevertheless, FPC will provide the requested information unless its generation is prohibitely expensive. If such is the case, we will discuss it with our NRC project manager prior to its submittal. | FPC is reviewing your request for information and will provide a response by December 15, 1994. The majority of the information requested is based upon the guidance of Regulatory Guide (RG) 1.35 Revision 3. | ||
The guidance in the RG was not the licensing basis of CR-3 when the surveillance was performed. Nevertheless, FPC will provide the requested information unless its generation is prohibitely expensive. If such is the case, we will discuss it with our NRC project manager prior to its submittal. | |||
Sincerely. | Sincerely. | ||
P. M. Beard, Jr. | P. M. Beard, Jr. | ||
Senior Vice President Nuclear Operations xc: | Senior Vice President Nuclear Operations xc: | ||
Regional Administrator, Region II Senior Resident Inspector NRR Project Manager 010040 1 | |||
CRYSTAL RIVER ENERGY COMPLEX | CRYSTAL RIVER ENERGY COMPLEX | ||
* 15760 W. Power Line Street | * 15760 W. Power Line Street | ||
* Crystal River | * Crystal River | ||
* Florida 34428-6708 | * Florida 34428-6708 | ||
* 1904) 795-6486 A florida Progress Company | * 1904) 795-6486 A florida Progress Company g | ||
PDR | 9412O20202 941104 | ||
[ | |||
b-, | |||
PDR ADOCK 05000302 P | |||
PDR j}} | |||
Latest revision as of 23:32, 14 December 2024
| ML20080B454 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/04/1994 |
| From: | Beard P FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 3F1194-02, 3F1194-2, NUDOCS 9412020202 | |
| Download: ML20080B454 (1) | |
Text
.
7 I_
9
- o*
Florida E932Y
- : : J;u November 4, 1994 3F1194-02 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
Subject:
Fifth Tendon Surveillance, Request for Additional Information
References:
A.
NRC to FPC letter, 3N0994-16, dated September 22, 1994 B.
FPC to NRC letter, 3F0894-03, dated August 12, 1994
Dear Sir:
Reference A requested Florida Power Corporation (FPC) to provide additional information to facilitate the completion of the NRC staff's review of the Crystal River Unit 3 (CR-3) Fifth Tendon Surveillance Report (Reference B).
FPC is reviewing your request for information and will provide a response by December 15, 1994. The majority of the information requested is based upon the guidance of Regulatory Guide (RG) 1.35 Revision 3.
The guidance in the RG was not the licensing basis of CR-3 when the surveillance was performed. Nevertheless, FPC will provide the requested information unless its generation is prohibitely expensive. If such is the case, we will discuss it with our NRC project manager prior to its submittal.
Sincerely.
P. M. Beard, Jr.
Senior Vice President Nuclear Operations xc:
Regional Administrator, Region II Senior Resident Inspector NRR Project Manager 010040 1
CRYSTAL RIVER ENERGY COMPLEX
- 15760 W. Power Line Street
- Crystal River
- Florida 34428-6708
- 1904) 795-6486 A florida Progress Company g
9412O20202 941104
[
b-,
PDR ADOCK 05000302 P
PDR j