ML22146A342: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:June 13, 2022 LICENSEE: | {{#Wiki_filter:June 13, 2022 | ||
LICENSEE: NEXTERA ENERGY SEABROOK, LLC | |||
FACILITIES: SEABROOK STATION, UNIT NO. 1 | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF FEBRUARY 23, 2022, MEETING WITH NEXTERA ENERGY SEABROOK, LLC REGARDING PLANNED SUBMITTAL OF LICENSE AMENDMENT REQUEST TO UPDATE PRESSURE-TEMPERATURE LIMITS CURVES PERIOD OF APPLICABILITY (EPID L-2022-LRM-0016) | OF FEBRUARY 23, 2022, MEETING WITH NEXTERA ENERGY SEABROOK, LLC REGARDING PLANNED SUBMITTAL OF LICENSE AMENDMENT REQUEST TO UPDATE PRESSURE-TEMPERATURE LIMITS CURVES PERIOD OF APPLICABILITY (EPID L-2022-LRM-0016) | ||
On February 23, 2022, an Observation public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and | |||
The licensees slide presentation is available in ADAMS at Accession No. ML22146A347. In the meeting, the licensee discussed how they intend to submit a license amendment request for Seabrook to update the PTL curves found in TS 3.4.9.1 (Figures 3.4-2 and Figures 3.4-3) and TS 3.4.9.3 (Figure 3.4-4) to reflect a reduced period of applicability from 55 EFPY to 52.6 EFPY, as a result from higher reactor vessel fluence projections following removal of capsule X in 2020. The licensee stated that on September 30, 2021 (ML21277A388), it had submitted WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program, which projected that at 55 EFPY the peak clad/base metal fluence would be 3. | On February 23, 2022, an Observation public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representativ es of NextEra Energy Seabrook, LLC (the licensee) via webinar. The purpose of the meeting was to discuss the licensees plan to submit a license amendment request to revise the reacto r coolant system pressure temperature limit (PTL) curves of Technical Specification (TS) 3.4.9. to reflect the reduced period of applicability from 55 effective full power years (EFPY) to 52.6 EFPY at Seabrook Station, Unit No. 1. The meeting notice and agenda, dated February 9, 2022, is available in the Agencywide Documents Access and Management System (ADAMS) at A ccession No. ML22040A212. A list of attendees is provided as an Enclosure. | ||
The licensees slide presentation is available in ADAMS at Accession No. ML22146A347. In the meeting, the licensee discussed how they intend to submit a license amendment request for Seabrook to update the PTL curves found in TS 3.4.9.1 (Figures 3.4-2 and Figures 3.4-3) and TS 3.4.9.3 (Figure 3.4-4) to reflect a reduced period of applicability from 55 EFPY to 52.6 EFPY, as a result from higher reactor vessel fluence projections following removal of capsule X in 2020. The licensee stated that on September 30, 2021 (ML21277A388), it had submitted WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program, which projected that at 55 EFPY the peak clad/base metal fluence would be 3.19x10 19 n/cm2, which is slightly higher than the 3.05x10 19 n/cm2 used to create the current PTL curves in the TS, per WCAP-17441-NP, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal Operations. The licensee stated that it is submitting this license amendment request to address the non-conservative TS per Regulatory Guide 1.239, Licensee Actions to Address Nonconservative Technical Specifications. The licensee asked whether the NRC staff would handle this as an administrative change to the TS. The NRC staff stated that a technical review would be required to validate the licensees new proposed limit. | |||
No members of the public were in attendance. No Public Meeting Feedback Forms were received. | No members of the public were in attendance. No Public Meeting Feedback Forms were received. | ||
Please direct any inquiries to me at 301-415-2048, or via email at Justin.Poole@nrc.gov. | Please direct any inquiries to me at 301-415-2048, or via email at Justin.Poole@nrc.gov. | ||
Justin C. Poole, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 | /RA/ | ||
Justin C. Poole, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | |||
Docket No. 50-443 | |||
==Enclosure:== | ==Enclosure:== | ||
List of Attendees | |||
cc: Listserv | |||
LIST OF ATTENDEES | |||
FEBRUARY 23, 2022, MEETING WITH NEXTERA ENERGY/FLORIDA POWER & LIGHT | |||
PTL CURVE LICENSE AMENDMENT REQUEST | |||
NRC | |||
==Participants:== | ==Participants:== | ||
Justin Poole, Project Manager John Tsao, Senior Materials Engineer Dan Widrevitz, Materials Engineer Jeremy Dean, Senior Nuclear Engineer Santosh Bhatt, Nuclear Engineer NextEra Energy/FPL | Justin Poole, Project Manager John Tsao, Senior Materials Engineer Dan Widrevitz, Materials Engineer Jeremy Dean, Senior Nuclear Engineer Santosh Bhatt, Nuclear Engineer | ||
NextEra Energy/FPL | |||
==Participants:== | ==Participants:== | ||
Jarrett Mack Steve Catron Public: | Jarrett Mack Steve Catron | ||
None Enclosure | |||
Public: | |||
None | |||
Enclosure | |||
Package: ML22146A340 Meeting Slides: ML22146A347 Meeting Notice: ML22040A212 Meeting Summary: ML22146A342 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM NAME JPoole | Package: ML22146A340 Meeting Slides: ML22146A347 Meeting Notice: ML22040A212 Meeting Summary: ML22146A342 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM NAME JPoole KZeleznock JDanna JPoole DATE 05/23/2022 05/27/2022 06/13/2022 06/13/2022}} | ||
Revision as of 00:11, 18 November 2024
| ML22146A342 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 06/13/2022 |
| From: | Justin Poole NRC/NRR/DORL/LPL1 |
| To: | |
| Poole J, NRR/DORL/LPL1 | |
| Shared Package | |
| ML22146A340 | List: |
| References | |
| EPID L-2022-LRM-0016 | |
| Download: ML22146A342 (4) | |
Text
June 13, 2022
LICENSEE: NEXTERA ENERGY SEABROOK, LLC
FACILITIES: SEABROOK STATION, UNIT NO. 1
SUBJECT:
SUMMARY
OF FEBRUARY 23, 2022, MEETING WITH NEXTERA ENERGY SEABROOK, LLC REGARDING PLANNED SUBMITTAL OF LICENSE AMENDMENT REQUEST TO UPDATE PRESSURE-TEMPERATURE LIMITS CURVES PERIOD OF APPLICABILITY (EPID L-2022-LRM-0016)
On February 23, 2022, an Observation public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representativ es of NextEra Energy Seabrook, LLC (the licensee) via webinar. The purpose of the meeting was to discuss the licensees plan to submit a license amendment request to revise the reacto r coolant system pressure temperature limit (PTL) curves of Technical Specification (TS) 3.4.9. to reflect the reduced period of applicability from 55 effective full power years (EFPY) to 52.6 EFPY at Seabrook Station, Unit No. 1. The meeting notice and agenda, dated February 9, 2022, is available in the Agencywide Documents Access and Management System (ADAMS) at A ccession No. ML22040A212. A list of attendees is provided as an Enclosure.
The licensees slide presentation is available in ADAMS at Accession No. ML22146A347. In the meeting, the licensee discussed how they intend to submit a license amendment request for Seabrook to update the PTL curves found in TS 3.4.9.1 (Figures 3.4-2 and Figures 3.4-3) and TS 3.4.9.3 (Figure 3.4-4) to reflect a reduced period of applicability from 55 EFPY to 52.6 EFPY, as a result from higher reactor vessel fluence projections following removal of capsule X in 2020. The licensee stated that on September 30, 2021 (ML21277A388), it had submitted WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program, which projected that at 55 EFPY the peak clad/base metal fluence would be 3.19x10 19 n/cm2, which is slightly higher than the 3.05x10 19 n/cm2 used to create the current PTL curves in the TS, per WCAP-17441-NP, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal Operations. The licensee stated that it is submitting this license amendment request to address the non-conservative TS per Regulatory Guide 1.239, Licensee Actions to Address Nonconservative Technical Specifications. The licensee asked whether the NRC staff would handle this as an administrative change to the TS. The NRC staff stated that a technical review would be required to validate the licensees new proposed limit.
No members of the public were in attendance. No Public Meeting Feedback Forms were received.
Please direct any inquiries to me at 301-415-2048, or via email at Justin.Poole@nrc.gov.
/RA/
Justin C. Poole, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Docket No. 50-443
Enclosure:
List of Attendees
cc: Listserv
LIST OF ATTENDEES
FEBRUARY 23, 2022, MEETING WITH NEXTERA ENERGY/FLORIDA POWER & LIGHT
PTL CURVE LICENSE AMENDMENT REQUEST
NRC
Participants:
Justin Poole, Project Manager John Tsao, Senior Materials Engineer Dan Widrevitz, Materials Engineer Jeremy Dean, Senior Nuclear Engineer Santosh Bhatt, Nuclear Engineer
NextEra Energy/FPL
Participants:
Jarrett Mack Steve Catron
Public:
None
Enclosure
Package: ML22146A340 Meeting Slides: ML22146A347 Meeting Notice: ML22040A212 Meeting Summary: ML22146A342 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM NAME JPoole KZeleznock JDanna JPoole DATE 05/23/2022 05/27/2022 06/13/2022 06/13/2022