p OPERATING DATA REPORT BOCKET NO. 50-266 DATE september 4, 1986 COMPLETED BY     C. W. KRAUSE TELEPHONE     414 277 2001 OPERATING STATUS
p OPERATING DATA REPORT BOCKET NO. 50-266 DATE september 4, 1986 COMPLETED BY C. W. KRAUSE TELEPHONE 414 277 2001 OPERATING STATUS
: 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1       . NOTES                                           .
: 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1
: 2. REPORTING PERIOD:     AUGUST 1986               .                                                .
. NOTES
: 3. LICENSED THERMAL POWER (MWT): 1518.              .                                                .
: 2. REPORTING PERIOD:
: 4. NAMEPLATE RATING (GROSS MWE):     523.8         .                                                .
AUGUST 1986
: 5. DESIGN ELECTRICAL RATING (NET MUE): 497.          .                                                .
: 3. LICENSED THERMAL POWER (MWT): 1518.
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.    .                                                .
: 4. NAMEPLATE RATING (GROSS MWE):
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MUE): 485.      ........................
523.8
: 5. DESIGN ELECTRICAL RATING (NET MUE): 497.
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MUE): 485.
: 8. IF CHANGES OCCUR IN CAPACITY RATlNGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
: 8. IF CHANGES OCCUR IN CAPACITY RATlNGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
NOT APPLICABLE
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE jg     10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE jg
    -nlo
: 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE
    @@,'                                                          THIS MONTH         YR TO EATE       CUMULATIVE SS       11. HOURS IN REPORTING PERIOD                               744             5,831           138,671 ano p3 g    12. NUMBER OF HOURS REACTOR WAS CRITICAL                   744,0             4,980.3       112,453.3 PlO     13. REACTOR RESERVE SHUTDOWN HOURS                           0.0               11.0           645.4 oO       14. HOURS GENERATOR ON LINE                                 744.0             4,865.5       109,772.3 f,4     15. UNIT RESERVE SHUTDOWN HOURS                               0.0               28.0           832.0 gg     16. GROSS THERMAL ENERGY GENERATED (MWH)             1,074,052           7,136,70?       150,304,653 ac o   17. GROSS ELECTRICAL ENERGY GENERATED (MWH)             359,560         2,434,630       50,586,310 03 '"   18. NET ELECTRICAL ENERGY GENERATED (MWH)               343,253         2,326,209       48,145,141
-nlo THIS MONTH YR TO EATE CUMULATIVE SS ano
: 19. UNIT SERVICE FACTOR                                     100.0               83.4             79.2
: 11. HOURS IN REPORTING PERIOD 744 5,831 138,671
: 20. UNIT AVAILABILITY FACTOR                               100.0               83.9             79.8
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744,0 4,980.3 112,453.3 p3 g PlO
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                     95.1               82.3             71.1
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 11.0 645.4 oO
: 22. UNIT CAPACITY FACTOR (USING DER NET)                     92.8               80.3             69.9
: 14. HOURS GENERATOR ON LINE 744.0 4,865.5 109,772.3 f,4
: 23. UNIT FORCE 3 OUTAGE RATE                                 0.0                 0.5             2.2
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 28.0 832.0 gg
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,074,052 7,136,70?
150,304,653 ac o
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 359,560 2,434,630 50,586,310 03 '"
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 343,253 2,326,209 48,145,141
: 19. UNIT SERVICE FACTOR 100.0 83.4 79.2
: 20. UNIT AVAILABILITY FACTOR 100.0 83.9 79.8
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 95.1 82.3 71.1
: 22. UNIT CAPACITY FACTOR (USING DER NET) 92.8 80.3 69.9
: 23. UNIT FORCE 3 OUTAGE RATE 0.0 0.5 2.2
: 24. SHUTDOWNS SCHEDULED GVED NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
: 24. SHUTDOWNS SCHEDULED GVED NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE
NONE
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ' NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ' NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977


. t DOCKET NO.           50-266 UNIT NAME       Point Beach, Unit 1 DATE             September 4, 1986 COMPLETED BY     C. W. Krause TELEPHONE         414/277-2001 AVERAGE DAILY UNIT POWER LEVEL
t DOCKET NO.
          ,            MONTH     August 1986 AVERAGE               AVERAGE                           AVERAGE DAILY                 DAILY                             DAILY POWER LEVEL             POWER LEVEL                       POWER LEVEL DAY       MWe NET   DAY         MWe NET             DAY           MWe NET 1           497     11 '           493               21               488 2           495     12             489               22               479 3           492     13             493               23               470 4           492     14             497               24               441 5           495     15             500               25               436 6           496     16             499               26               437 7           498     17             499               27               389 8           496     18             496               28               378 9           497     19             496               29               367 10           479     20             491               30               250 31               277 EQR-28a (04-86)
50-266 UNIT NAME Point Beach, Unit 1 DATE September 4, 1986 COMPLETED BY C. W. Krause TELEPHONE 414/277-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH August 1986 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
497 11 '
493 21 488 2
495 12 489 22 479 3
492 13 493 23 470 4
492 14 497 24 441 5
495 15 500 25 436 6
496 16 499 26 437 7
498 17 499 27 389 8
496 18 496 28 378 9
497 19 496 29 367 10 479 20 491 30 250 31 277 EQR-28a (04-86)


UNIT SHUTDOWNS AND POWER REDUCTIONS       DOCKET NO.           50-266 UNIT NAME     Point   Berch Unit 1 DATE           September     4, 1986 -
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
REPORT MONTH   August, 1986         COMPLETED BY     C. W. Krause TELEPHONE         414/277-2001 c
50-266 UNIT NAME Point Berch Unit 1 DATE September 4, 1986 -
5                               a 82   "c   a   "a                           5 1   Y$
REPORT MONTH August, 1986 COMPLETED BY C. W. Krause TELEPHONE 414/277-2001 c
eo 0
5 a
e toao
82 "c
                                $O   Licensee Event 0'e ut
a "a
                                                                $*e o.c Cause & Corrective Action No. Date   g g    $$
5 1
a
Y$
                          $  {}d$       Report No.     $,0 m
0 t $O 0'e
                                                                @0 U
$*e eo e
To Prevent Recurrence yyM m
oao Licensee Event ut o.c Cause & Corrective Action No.
7    860829   S 49.0     B   N/A     N/A           ZZ   ZZZZZZ   Reduced power for cleaning biological fouling from condenser tubes 1 F: Forced       2 Reason:                             3 Method:                4 Exhibit G-Instructions S:   Scheduled     A - Equipment Failure (explain)       1 - Manual                 for preparation of B - Maintenance or Test               2 - Manual Scram           data entry sheets C - Refueling                         3 - Automatic Scram       LER file (NUREG-0161)
Date g
D - Regulatory Restriction           4 - Continuation of E - Operator Training &                   Previous Shutdown Licensing Exam                 5 - Reduced Load       SExhibit I-Same Source F - Administrative                   6 - Other (explain)
{}d$
Report No.
$,0
@0 To Prevent Recurrence g
m U
yyM a
m 7
860829 S
49.0 B
N/A N/A ZZ ZZZZZZ Reduced power for cleaning biological fouling from condenser tubes 4 Exhibit G-Instructions 3 Method:
1 F:
Forced 2 Reason:
S:
Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown SExhibit I-Same Source Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain)
G - Operational Error (explain)
G - Operational Error (explain)
H - Other (explain)                           ,
H - Other (explain)
EQR-28B (06-86)
EQR-28B (06-86)


Line 63: Line 100:


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Docket No.     50-266 Unit Name       Point Beach Unit 1 Date           September 4' , 1986 Completed By   C. W. Krause Telephone       414/277-2001 Unit 1 operated at 496 MWe net throughout the period with one scheduled load reduction. On August 29, 1986, load was reduced for approximately 49 hours to allow cleaning biological fouling from the inside of the condenser tubes.
OF OPERATING EXPERIENCE Docket No.
50-266 Unit Name Point Beach Unit 1 Date September 4' 1986 Completed By C. W. Krause Telephone 414/277-2001 Unit 1 operated at 496 MWe net throughout the period with one scheduled load reduction.
On August 29, 1986, load was reduced for approximately 49 hours to allow cleaning biological fouling from the inside of the condenser tubes.
No safety-related maintenance was performed on the unit during the period.
No safety-related maintenance was performed on the unit during the period.
9 e
9 e
e
e


e OPERATING DATA REPORT DOCKET NO. 50-301 DATE     September 4, 1986 COMPLETED BY     C. W. KRAUSE TELEPHONE   414 277 2001 OPERATING STATUS
e OPERATING DATA REPORT DOCKET NO. 50-301 DATE September 4, 1986 COMPLETED BY C. W. KRAUSE TELEPHONE 414 277 2001 OPERATING STATUS
: 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2       . NOTES                                         .
: 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2
: 2. REPORTING PERIOD     AUGUST 1986                 .                                                .
. NOTES
: 3. LICENSED THERMAL POWER (MUT): 1518.              .                                                .
: 2. REPORTING PERIOD AUGUST 1986
: 4. NAMEPLATE RATING (GROSS MWE):     523.8           .                                                .
: 3. LICENSED THERMAL POWER (MUT): 1518.
: 5. DESIGN ELECTRICAL RATING (NET MWE): 497.          .                                                .
: 4. NAMEPLATE RATING (GROSS MWE):
: 6. MAXIhUM DEPENDABLE CAPACITY (GROSS MWE): 509.    .
523.8
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.      ........................
: 5. DESIGN ELECTRICAL RATING (NET MWE): 497.
: 6. MAXIhUM DEPENDABLE CAPACITY (GROSS MWE): 509.
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
l NOT APPLICABLE
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
: 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH         YR TO DATE       CUMULATIVE
: 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
: 11. HOURS IN REPORTING PERIOD                               744             5,831           123,456
: 11. HOURS IN REPORTING PERIOD 744 5,831 123,456
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                     744.0           5,827.2         109,375.8
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,827.2 109,375.8
: 13. REACTOR RESERVE SHUTDOWN HOURS                             0.0               0.0           207.4
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 207.4
: 14. HOURS GENERATOR ON LINE                                 744.0           5,781.6         107,582.3
: 14. HOURS GENERATOR ON LINE 744.0 5,781.6 107,582.3
: 15. UNIT RESERVE SHUTDOWN HOURS                                 0.0               9.9           244.2
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 9.9 244.2
: 16. GROSS THERMAL ENERGY GENERATED (MWH)             1,083,054         8,543,168       151,423,038
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,083,054 8,543,168 151,423,038
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)             362,170         2,885,840       51,301,690
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 362,170 2,885,840 51,301,690
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)               345,189         2,755,755       48,870,241
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 345,189 2,755,755 48,870,241
: 19. UNIT SERVICE FACTOR                                     100.0             99.2             87.1
: 19. UNIT SERVICE FACTOR 100.0 99.2 87.1
: 20. UNIT AVAILABILITY FACTOR                                 100.0             99.3             87,3
: 20. UNIT AVAILABILITY FACTOR 100.0 99.3 87,3
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                     95.7               97.4             80.7
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 95.7 97.4 80.7
: 22. UNIT CAPACITY FACTOR (USING DER NET)                     93.4               95.1             79.6
: 22. UNIT CAPACITY FACTOR (USING DER NET) 93.4 95.1 79.6
: 23. UNIT FORCED OUTAGE RATE                                   0.0               0.4             1.2
: 23. UNIT FORCED OUTAGE RATE 0.0 0.4 1.2
: 24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
: 24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Annual refueling / maintenance outage, 09/26/86 - 11/16/86       '
Annual refueling / maintenance outage, 09/26/86 - 11/16/86
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977


DOCKET NO.         50-301 UNIT NAME     Point Beach, Unit 2 DATE           September 4, 1986 COMPLETED BY     C. W. Krause TELEPHONE       414/277-2001 AVERAGE DAILY UNIT POWER LEVEL
DOCKET NO.
                          ,                        MONTH   August 1986 AVERAGE                           AVERAGE                           AVERAGE DAILY                             DAILY                             DAILY POWER LEVEL                       POWER LEVEL                       POWER LEVEL DAY           MWe NET               DAY         MWe NET             DAY           MWe NET 1             493                 11 '           488               21             480 2             491                 12             483               22             456 3             465                 13             487               23             411 4             487                 14             491               24             271 5             490                 15             492               25             192 6             492                 16             493               26             396 7             492                 17             493               27             482 8             492                 18           489               28             468 9             493                 19           487               29             481 10               492                 20             482             30               485 31               487 EQR-28a (04-86)
50-301 UNIT NAME Point Beach, Unit 2 DATE September 4, 1986 COMPLETED BY C. W. Krause TELEPHONE 414/277-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH August 1986 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
493 11 '
488 21 480 2
491 12 483 22 456 3
465 13 487 23 411 4
487 14 491 24 271 5
490 15 492 25 192 6
492 16 493 26 396 7
492 17 493 27 482 8
492 18 489 28 468 9
493 19 487 29 481 10 492 20 482 30 485 31 487 EQR-28a (04-86)


UNIT SHUTDOWNS AND POWER REDUCTIONS           DOCKET NO.           50-301 UNIT NAME     Point Berch Unit 2 DATE           September 4, 1986 ~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
REPORT MONTH August 1986               COMPLETED BY       C. W. Krause TELEPHONE         414/277-2001 o                                         4J ca       a   **4 Q o                                       c
50-301 UNIT NAME Point Berch Unit 2 DATE September 4, 1986 ~
<                                                                                                    o (a     c   o     M                                       W
REPORT MONTH August 1986 COMPLETED BY C.
                                                                                                  -  r4 44     o       tb o                             li e     c an                                                   ,
W.
,                                    No.                                                   Date N5       E   ENU                 Licensee Event   0$       SS               Cause & Corrective Action jj 3     $    $d@                   Report No.     $8       @O               To Prevent Recurrence m       U Q            g] a:
Krause TELEPHONE 414/277-2001 o
m                                                                                                 .
4J ca a
e 7                                               860823     S 49.0       B     N/A             N/A                 ZZ   ZZZZZZ     Reduced power for cleaning biological' fouling from condenser tubes.
**4 Q o c
                                                                                                                                              ~
o (a c
                                                                                                                                                                                              '                  i e
o M
1F:                                             Forced         2 Reason:                                           aMethod:                   4 Exhibit G-Instructions S:                                   Scheduled       A - Equipment Failure (explain)                     1 -   Manual                 for preparation of B - Maintenance or Test                             2 -   Manual Scram           data entry sheets C - Refueling                                       3 -   Automatic Scram         LER file (NUREG-0161)
W r4 44 o
D - Regulatory Restriction                         4 -   Continuation of E - Operator Training &                                   Previous Shutdown Licensing Exam                             5 - Reduced Load           5 Exhibit I-Same Source F - Administrative                                 6 - Other (explain)
tb o li e c an No.
Date N5 E
ENU Licensee Event 0$
SS Cause & Corrective Action jj 3
$d@
Report No.
$8
@O To Prevent Recurrence m
U g] a:
Q m
e 7
860823 S
49.0 B
N/A N/A ZZ ZZZZZZ Reduced power for cleaning biological' fouling from condenser tubes.
~
i e
1F:
Forced 2 Reason:
aMethod:
4 Exhibit G-Instructions S:
Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced Load 5 Exhibit I-Same Source F - Administrative 6 - Other (explain)
G - Operational Error (explain)
G - Operational Error (explain)
H - Other (explain)                                           ,
H - Other (explain)
EQR-28B (06-86)
EQR-28B (06-86)


Line 118: Line 191:


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Docket No.     50-301 Unit Name       Point Beach Unit 2 Date           September 4, 1986 Completed By   C. W. Krause                                       l Telephone       414/277-2001 l
OF OPERATING EXPERIENCE Docket No.
Unit 2 operated at 492 MWe net throughout the period with one scheduled load reduction. On August 23, 1986, load was reduced for approximately 49 hours to allow cleaning biological fouling from inside the condenser tubes.
50-301 Unit Name Point Beach Unit 2 Date September 4, 1986 Completed By C. W. Krause Telephone 414/277-2001 Unit 2 operated at 492 MWe net throughout the period with one scheduled load reduction.
On August 23, 1986, load was reduced for approximately 49 hours to allow cleaning biological fouling from inside the condenser tubes.
Safety-related maintenance performed during the period includes repair of minor oil leaks on two snubbers on the high pressure safety injection piping.
Safety-related maintenance performed during the period includes repair of minor oil leaks on two snubbers on the high pressure safety injection piping.
i I
i I
Line 126: Line 200:


n
n
        % Sin Electnc eom couem 231 W. MICHIG AN. P.O. BOX 2046. MILWAUKEE.Wl 53201             (414)277-2345
% Sin Electnc eom couem 231 W. MICHIG AN. P.O. BOX 2046. MILWAUKEE.Wl 53201 (414)277-2345
                .h VPNPD-86-407 NRC-86-90 September 9, 1986 Director of Nuclear Regulatory Operations U. S'. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Gentlemen:
.h VPNPD-86-407 NRC-86-90 September 9, 1986 Director of Nuclear Regulatory Operations U.
S'.
NUCLEAR REGULATORY COMMISSION Washington, D. C.
20555 Gentlemen:
P MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT DOCKETS 50-266 AND 50-301 Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of August 1986.
P MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT DOCKETS 50-266 AND 50-301 Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of August 1986.
Very truly yours,
Very truly yours,
                    .  .h
.h
((d y C. W.     Fay Vice President Nuclear Power Attachments Copies to R. S. Cullen, PSCW J. G. Keppler, NRC Region III NRC Resident Inspector rE2-4
((d y C. W.
_ _ _ _ _ . _ _ J/ /.}}
Fay Vice President Nuclear Power Attachments Copies to R.
S. Cullen, PSCW J.
G.
Keppler, NRC Region III NRC Resident Inspector rE2-4
. J/ /.}}

Latest revision as of 17:30, 6 December 2024

Monthly Operating Repts for Aug 1986
ML20209J049
Person / Time
Site: Point Beach  
Issue date: 08/31/1986
From: Fay C, Krause C
WISCONSIN ELECTRIC POWER CO.
To:
NRC
References
CON-NRC-86-90 VPNPD-86-407, NUDOCS 8609160133
Download: ML20209J049 (9)


Text

.

p OPERATING DATA REPORT BOCKET NO. 50-266 DATE september 4, 1986 COMPLETED BY C. W. KRAUSE TELEPHONE 414 277 2001 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1

. NOTES

2. REPORTING PERIOD:

AUGUST 1986

3. LICENSED THERMAL POWER (MWT): 1518.
4. NAMEPLATE RATING (GROSS MWE):

523.8

5. DESIGN ELECTRICAL RATING (NET MUE): 497.
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.
7. MAXIMUM DEPENDABLE CAPACITY (NET MUE): 485.
8. IF CHANGES OCCUR IN CAPACITY RATlNGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE jg
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE

-nlo THIS MONTH YR TO EATE CUMULATIVE SS ano

11. HOURS IN REPORTING PERIOD 744 5,831 138,671
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744,0 4,980.3 112,453.3 p3 g PlO
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 11.0 645.4 oO
14. HOURS GENERATOR ON LINE 744.0 4,865.5 109,772.3 f,4
15. UNIT RESERVE SHUTDOWN HOURS 0.0 28.0 832.0 gg
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,074,052 7,136,70?

150,304,653 ac o

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 359,560 2,434,630 50,586,310 03 '"
18. NET ELECTRICAL ENERGY GENERATED (MWH) 343,253 2,326,209 48,145,141
19. UNIT SERVICE FACTOR 100.0 83.4 79.2
20. UNIT AVAILABILITY FACTOR 100.0 83.9 79.8
21. UNIT CAPACITY FACTOR (USING MDC NET) 95.1 82.3 71.1
22. UNIT CAPACITY FACTOR (USING DER NET) 92.8 80.3 69.9
23. UNIT FORCE 3 OUTAGE RATE 0.0 0.5 2.2
24. SHUTDOWNS SCHEDULED GVED NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ' NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

t DOCKET NO.

50-266 UNIT NAME Point Beach, Unit 1 DATE September 4, 1986 COMPLETED BY C. W. Krause TELEPHONE 414/277-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH August 1986 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

497 11 '

493 21 488 2

495 12 489 22 479 3

492 13 493 23 470 4

492 14 497 24 441 5

495 15 500 25 436 6

496 16 499 26 437 7

498 17 499 27 389 8

496 18 496 28 378 9

497 19 496 29 367 10 479 20 491 30 250 31 277 EQR-28a (04-86)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-266 UNIT NAME Point Berch Unit 1 DATE September 4, 1986 -

REPORT MONTH August, 1986 COMPLETED BY C. W. Krause TELEPHONE 414/277-2001 c

5 a

82 "c

a "a

5 1

Y$

0 t $O 0'e

$*e eo e

oao Licensee Event ut o.c Cause & Corrective Action No.

Date g

{}d$

Report No.

$,0

@0 To Prevent Recurrence g

m U

yyM a

m 7

860829 S

49.0 B

N/A N/A ZZ ZZZZZZ Reduced power for cleaning biological fouling from condenser tubes 4 Exhibit G-Instructions 3 Method:

1 F:

Forced 2 Reason:

S:

Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training &

Previous Shutdown SExhibit I-Same Source Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain)

G - Operational Error (explain)

H - Other (explain)

EQR-28B (06-86)

e NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No.

50-266 Unit Name Point Beach Unit 1 Date September 4' 1986 Completed By C. W. Krause Telephone 414/277-2001 Unit 1 operated at 496 MWe net throughout the period with one scheduled load reduction.

On August 29, 1986, load was reduced for approximately 49 hours5.671296e-4 days <br />0.0136 hours <br />8.101852e-5 weeks <br />1.86445e-5 months <br /> to allow cleaning biological fouling from the inside of the condenser tubes.

No safety-related maintenance was performed on the unit during the period.

9 e

e

e OPERATING DATA REPORT DOCKET NO. 50-301 DATE September 4, 1986 COMPLETED BY C. W. KRAUSE TELEPHONE 414 277 2001 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2

. NOTES

2. REPORTING PERIOD AUGUST 1986
3. LICENSED THERMAL POWER (MUT): 1518.
4. NAMEPLATE RATING (GROSS MWE):

523.8

5. DESIGN ELECTRICAL RATING (NET MWE): 497.
6. MAXIhUM DEPENDABLE CAPACITY (GROSS MWE): 509.
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

l NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 744 5,831 123,456
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,827.2 109,375.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 207.4
14. HOURS GENERATOR ON LINE 744.0 5,781.6 107,582.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 9.9 244.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,083,054 8,543,168 151,423,038
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 362,170 2,885,840 51,301,690
18. NET ELECTRICAL ENERGY GENERATED (MWH) 345,189 2,755,755 48,870,241
19. UNIT SERVICE FACTOR 100.0 99.2 87.1
20. UNIT AVAILABILITY FACTOR 100.0 99.3 87,3
21. UNIT CAPACITY FACTOR (USING MDC NET) 95.7 97.4 80.7
22. UNIT CAPACITY FACTOR (USING DER NET) 93.4 95.1 79.6
23. UNIT FORCED OUTAGE RATE 0.0 0.4 1.2
24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Annual refueling / maintenance outage, 09/26/86 - 11/16/86

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

DOCKET NO.

50-301 UNIT NAME Point Beach, Unit 2 DATE September 4, 1986 COMPLETED BY C. W. Krause TELEPHONE 414/277-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH August 1986 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

493 11 '

488 21 480 2

491 12 483 22 456 3

465 13 487 23 411 4

487 14 491 24 271 5

490 15 492 25 192 6

492 16 493 26 396 7

492 17 493 27 482 8

492 18 489 28 468 9

493 19 487 29 481 10 492 20 482 30 485 31 487 EQR-28a (04-86)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-301 UNIT NAME Point Berch Unit 2 DATE September 4, 1986 ~

REPORT MONTH August 1986 COMPLETED BY C.

W.

Krause TELEPHONE 414/277-2001 o

4J ca a

    • 4 Q o c

o (a c

o M

W r4 44 o

tb o li e c an No.

Date N5 E

ENU Licensee Event 0$

SS Cause & Corrective Action jj 3

$d@

Report No.

$8

@O To Prevent Recurrence m

U g] a:

Q m

e 7

860823 S

49.0 B

N/A N/A ZZ ZZZZZZ Reduced power for cleaning biological' fouling from condenser tubes.

~

i e

1F:

Forced 2 Reason:

aMethod:

4 Exhibit G-Instructions S:

Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training &

Previous Shutdown Licensing Exam 5 - Reduced Load 5 Exhibit I-Same Source F - Administrative 6 - Other (explain)

G - Operational Error (explain)

H - Other (explain)

EQR-28B (06-86)

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No.

50-301 Unit Name Point Beach Unit 2 Date September 4, 1986 Completed By C. W. Krause Telephone 414/277-2001 Unit 2 operated at 492 MWe net throughout the period with one scheduled load reduction.

On August 23, 1986, load was reduced for approximately 49 hours5.671296e-4 days <br />0.0136 hours <br />8.101852e-5 weeks <br />1.86445e-5 months <br /> to allow cleaning biological fouling from inside the condenser tubes.

Safety-related maintenance performed during the period includes repair of minor oil leaks on two snubbers on the high pressure safety injection piping.

i I

o I

O

n

% Sin Electnc eom couem 231 W. MICHIG AN. P.O. BOX 2046. MILWAUKEE.Wl 53201 (414)277-2345

.h VPNPD-86-407 NRC-86-90 September 9, 1986 Director of Nuclear Regulatory Operations U.

S'.

NUCLEAR REGULATORY COMMISSION Washington, D. C.

20555 Gentlemen:

P MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT DOCKETS 50-266 AND 50-301 Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of August 1986.

Very truly yours,

.h

((d y C. W.

Fay Vice President Nuclear Power Attachments Copies to R.

S. Cullen, PSCW J.

G.

Keppler, NRC Region III NRC Resident Inspector rE2-4

. J/ /.