ML21152A302: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:From: Bassett, Craig | ||
To: Glenn Eric Sjoden | |||
Cc: Tate, Travis | |||
Subject: Date a response is due for Inspection Report 05000407/2020201 | |||
Date: Tuesday, May 25, 2021 1:22:00 PM | |||
Dr. Sjoden, | |||
You asked about the inspection report (IR) you received concerning an inspection that was | |||
conducted in October 2020 and when you were required to respond to the report. The | |||
NRC has experienced a few issues with our document system (ADAMS) recently which | |||
prevented some documents from being declared as an Official Document in the system. | |||
That was the case with IR 05000407/2020201, Accession Number ML20304A216, you | |||
received today, May 25, 2021. Because of these issues with ADAMS, you received the IR | |||
considerably later than usual. Therefore please note that you will have 30 days from the | |||
date you received the inspection report to respond. Your response will be due on June 24, | |||
2021. | |||
Thanks for your question. | |||
Regards, | |||
Craig Bassett | |||
Research & Test Reactor Inspector | |||
Office of Nuclear Reactor Regulation | |||
}} | }} |
Revision as of 06:00, 9 September 2021
ML21152A302 | |
Person / Time | |
---|---|
Site: | University of Utah |
Issue date: | 05/25/2021 |
From: | Bassett C NRC/NRR/DANU/UNPO |
To: | Sjoden G NRC/NRR/DANU/UNPO |
Bassett C | |
References | |
IR 2020201 | |
Download: ML21152A302 (1) | |
See also: IR 05000407/2020201
Text
From: Bassett, Craig
To: Glenn Eric Sjoden
Cc: Tate, Travis
Subject: Date a response is due for Inspection Report 05000407/2020201
Date: Tuesday, May 25, 2021 1:22:00 PM
Dr. Sjoden,
You asked about the inspection report (IR) you received concerning an inspection that was
conducted in October 2020 and when you were required to respond to the report. The
NRC has experienced a few issues with our document system (ADAMS) recently which
prevented some documents from being declared as an Official Document in the system.
That was the case with IR 05000407/2020201, Accession Number ML20304A216, you
received today, May 25, 2021. Because of these issues with ADAMS, you received the IR
considerably later than usual. Therefore please note that you will have 30 days from the
date you received the inspection report to respond. Your response will be due on June 24,
2021.
Thanks for your question.
Regards,
Craig Bassett
Research & Test Reactor Inspector
Office of Nuclear Reactor Regulation