ML20211J403: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:..
{{#Wiki_filter:..
  ~*
~*
DC Sourc;s - Oper: ting 3.8.4 i                       G SURVEILLANCE REQUIREMENTS SURVEILLANCE                                   FREQUENCY SR 3.8.4.6     Verify each battery charger supplies 2 300 amps at           18 months 2130 V for 2 8 hours.
DC Sourc;s - Oper: ting 3.8.4 i
SR 3.8.4.7     -
G SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.6 Verify each battery charger supplies 2 300 amps at 18 months 2130 V for 2 8 hours.
NOTES
SR 3.8.4.7 NOTES
: 1. The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7*
: 1. The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7*
: 2. Verify requirement during MODES 3,4,5,6 or with core off-loaded.
: 2. Verify requirement during MODES 3,4,5,6 or with core off-loaded.
Verify battery capacity is adequate to supply, and           18 months maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjectad to a battery service test.
Verify battery capacity is adequate to supply, and 18 months maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjectad to a battery service test.
I (continued)   I 1
I (continued)
1 l
I 1
* On a one time basis, for battery BT1ED2, a performance discharge test may be performed in lieu of the battery service test required by Specification 3.8.4.7, twice within a 60 month intental. This one time exception expires prior to entry into MODE 4 following the next Unit 1 outage of sufficient duration to perform a service test.
* On a one time basis, for battery BT1ED2, a performance discharge test may be performed in lieu of the battery service test required by Specification 3.8.4.7, twice within a 60 month intental. This one time exception expires prior to entry into MODE 4 following the next Unit 1 outage of sufficient duration to perform a service test.
9909030136 990827 PDR ADOCK 05000445 P                 PDR COMANCHE PEAK - UNITS 1 AND 2                 3.8-26             Amndment No. #, H, 66}}
9909030136 990827 PDR ADOCK 05000445 P
PDR COMANCHE PEAK - UNITS 1 AND 2 3.8-26 Amndment No. #, H, 66}}

Latest revision as of 23:59, 5 December 2024

Errata to Amends 66 & 66 to Licenses NPF-87 & NPF-89, Respectively.Footnote on TS Page 3.8-26 Was Incorrectly Deleted
ML20211J403
Person / Time
Site: Comanche Peak  
(NPF-87-A-066, NPF-89-A-066)
Issue date: 08/27/1999
From:
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20211J385 List:
References
NUDOCS 9909030136
Download: ML20211J403 (1)


Text

..

~*

DC Sourc;s - Oper: ting 3.8.4 i

G SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.6 Verify each battery charger supplies 2 300 amps at 18 months 2130 V for 2 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

SR 3.8.4.7 NOTES

1. The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7*
2. Verify requirement during MODES 3,4,5,6 or with core off-loaded.

Verify battery capacity is adequate to supply, and 18 months maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjectad to a battery service test.

I (continued)

I 1

  • On a one time basis, for battery BT1ED2, a performance discharge test may be performed in lieu of the battery service test required by Specification 3.8.4.7, twice within a 60 month intental. This one time exception expires prior to entry into MODE 4 following the next Unit 1 outage of sufficient duration to perform a service test.

9909030136 990827 PDR ADOCK 05000445 P

PDR COMANCHE PEAK - UNITS 1 AND 2 3.8-26 Amndment No. #, H, 66