ML20215M711: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _ _
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _ _
            .           .
.
                      In Reply Refer To:
.
                      Docket:                   50-298/86-26
In Reply Refer To:
                    Nebraska Public Power District
Docket:
                    ATTN:             J. M. Pilant, Manager, Technical
50-298/86-26
                                                Staff-Nuclear Power Group
Nebraska Public Power District
                      P. O. Box 499
ATTN:
                    Columbus, NE                     68601
J. M. Pilant, Manager, Technical
                    Gentlemen:
Staff-Nuclear Power Group
                    This refers to the inspection conducted by Messrs. D. DuBois, E. Plettner, and
P. O. Box 499
i                     P. Harrell of this office during the period September 1-30, 1986, of activities
Columbus, NE
l                   authorized by NRC Operating License DPR-46 for Cooper Nuclear Station and to
68601
                      the discussion of our findings with Mr. G. Horn and other members of your staff
Gentlemen:
l~                   at the conclusion of the inspection.
This refers to the inspection conducted by Messrs. D. DuBois, E. Plettner, and
i
P. Harrell of this office during the period September 1-30, 1986, of activities
l
authorized by NRC Operating License DPR-46 for Cooper Nuclear Station and to
the discussion of our findings with Mr. G. Horn and other members of your staff
l ~
at the conclusion of the inspection.
,
,
i                   Areas examined during the inspection included Notification of an Unusual Event,
i
j                     Licensee Event Reports, spent fuel shipment, operational safety verification,
Areas examined during the inspection included Notification of an Unusual Event,
j
Licensee Event Reports, spent fuel shipment, operational safety verification,
'
'
                    monthly. surveillance and maintenance activities, systematic assessment of
monthly. surveillance and maintenance activities, systematic assessment of
l                     licensee performance, and annual emergency preparedness exercise.                                                               Within
l
j                   these areas, the inspection consisted of selective examination of procedures
licensee performance, and annual emergency preparedness exercise.
l                   and representative records, interviews with personnel, and observations by the
Within
i                   NRC inspectors. The inspection findings are documented in the enclosed
j
j                     inspection report.
these areas, the inspection consisted of selective examination of procedures
l
and representative records, interviews with personnel, and observations by the
i
NRC inspectors.
The inspection findings are documented in the enclosed
j
inspection report.
;
;
1                   During this inspection, it was found that certain of your activities were in
1
!                   violation of NRC requirements.                                           Consequently, you are required to respond to
During this inspection, it was found that certain of your activities were in
i                   this violation, in writing, in accordance with the provisions of Section 2.201
!
i                   of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
violation of NRC requirements.
!                   Regulations.                     Your response should be based on the specifics contained in the
Consequently, you are required to respond to
                    Notice of Violation enclosed with this letter.
i
this violation, in writing, in accordance with the provisions of Section 2.201
i
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
!
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
I
I
!                   The response directed by this letter and the accompanying Notice is not subject
!
{                   to the clearance procedures of the Office of Management and Budget as required
The response directed by this letter and the accompanying Notice is not subject
{
to the clearance procedures of the Office of Management and Budget as required
;
;
by the Paperwork Reduction Act of 1980, PL 96-511.
l
1
Should you have any questions concerning this inspection, we will be pleased to
l
discuss them with you.
l
Sincerely,
I
.
j
j
OMne! Send Gy ,
j
E R v;nnen
>
l
l
                    by the Paperwork Reduction Act of 1980, PL 96-511.
J. E. Gagliardo Chief
1                    Should you have any questions concerning this inspection, we will be pleased to
l                    discuss them with you.
l                                                                                                    Sincerely,                                  .                        I
j
j
j                                                                                                      OMne! Send Gy ,
Reactor Projects Branch
j                                                                                                            E R v;nnen        >
Enclosures:
l                                                                                                    J. E. Gagliardo Chief
(see next page)
j                                                                                                    Reactor Projects Branch
8
                    Enclosures:                     (see next page)                             8             /,                                                       -
/,
-
!
!
i                   RIV: RI;
>
                                  >
')
                                        '
h
                                          '
L
                                            '
i
                                                        RIV:SR
D
                                                                                      ')          h
'
                                                                                              I SRI     R B/A
'
                                                                                                                L
i
                                                                                                                              RPB/                   RPB @
RIV: RI;
                                                                                                                                                              i
RIV:SR
                                                                                                                                                                      /
I SRI
                                                                                                                                                                        D
R B/A
l              v fAPlettner/sn                           PHHarre                             LD'uBois   J Jaudon             DRHu er                     l ardo      /
RPB/
                      p///86                             g/p(/86
RPB @
                                                                                        '
/
                                                                                                        p /;M/86                 IM 86               JEGag/86
'
                                                                                                                                                      p/tt
l ardo
;                                                                                          \0/)IY/86
/
l
v fAPlettner/sn
PHHarre
LD'uBois
J Jaudon
DRHu er
JEGag/86
;
p///86
g/p(/86
\\0/)IY/86
p /;M/86
IM 86
'
p/tt
I
I
8611030188 861024
i
i
                            8611030188 861024
i
i
'                          hDR ADOCK 05000298
hDR
                                                              PDR
ADOCK 05000298
'
PDR
t
t
< - , - , -   - - . . .   -m.,n,,_,.,__,,.n____,_                                                     _ . _ ,   -   _ _ _ .     . . , , , . _               n,_
< - , - , -
- - . . .
-m.,n,,_,.,__,,.n____,_
_ . _ ,
-
_ _ _ .
. . , , , . _
n,_


  -
-
          '
'
      t
t
  i
i
          Nebraska Public Power District         -2-
Nebraska Public Power District
          Enclosures:
-2-
        1.   Appendix A - Notice of Violation
Enclosures:
        2.   Appendix B - NRC Inspection Report
1.
                50-298/86-26
Appendix A - Notice of Violation
        cc w/ enclosures:
2.
        Guy R. Horn, Division Manager
Appendix B - NRC Inspection Report
            of Nuclear Operations
50-298/86-26
        Cooper Nuclear Station
cc w/ enclosures:
        P. O. Box 98
Guy R. Horn, Division Manager
        Brownville, Nebraska 68321
of Nuclear Operations
        Kansas Radiation Control Program Director
Cooper Nuclear Station
        ' Nebraska Radiation Control Program Director
P. O. Box 98
        bcc-to DMB (IE01)
Brownville, Nebraska
    ,    bec distrib. by RIV:
68321
        *RPB                                 DRSP
Kansas Radiation Control Program Director
        * Resident Inspector                 R. D. Martin, RA
' Nebraska Radiation Control Program Director
        *Section Chief (RPB/A)             *D. Weiss, LFMB (AR-2015)
bcc-to DMB (IE01)
        *E&SPB                             *RSB
bec distrib. by RIV:
        * MIS System                       *RIV File
,
        *RSTS Operator                     *P. H. Harrell, RPB/B
*RPB
                                                                      l
DRSP
        *w/766
* Resident Inspector
                                                        ,
R. D. Martin, RA
*Section Chief (RPB/A)
*D. Weiss, LFMB (AR-2015)
*E&SPB
*RSB
* MIS System
*RIV File
*RSTS Operator
*P. H. Harrell, RPB/B
l
*w/766
,
I
I
i
i

Latest revision as of 21:27, 3 December 2024

Forwards Insp Rept 50-298/86-26 on 860901-30 & Notice of Violation
ML20215M711
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/24/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20215M712 List:
References
NUDOCS 8611030188
Download: ML20215M711 (2)


See also: IR 05000298/1986026

Text

_ _ _ _ _ _ _ _ _ _ _ _ _

.

.

In Reply Refer To:

Docket:

50-298/86-26

Nebraska Public Power District

ATTN:

J. M. Pilant, Manager, Technical

Staff-Nuclear Power Group

P. O. Box 499

Columbus, NE

68601

Gentlemen:

This refers to the inspection conducted by Messrs. D. DuBois, E. Plettner, and

i

P. Harrell of this office during the period September 1-30, 1986, of activities

l

authorized by NRC Operating License DPR-46 for Cooper Nuclear Station and to

the discussion of our findings with Mr. G. Horn and other members of your staff

l ~

at the conclusion of the inspection.

,

i

Areas examined during the inspection included Notification of an Unusual Event,

j

Licensee Event Reports, spent fuel shipment, operational safety verification,

'

monthly. surveillance and maintenance activities, systematic assessment of

l

licensee performance, and annual emergency preparedness exercise.

Within

j

these areas, the inspection consisted of selective examination of procedures

l

and representative records, interviews with personnel, and observations by the

i

NRC inspectors.

The inspection findings are documented in the enclosed

j

inspection report.

1

During this inspection, it was found that certain of your activities were in

!

violation of NRC requirements.

Consequently, you are required to respond to

i

this violation, in writing, in accordance with the provisions of Section 2.201

i

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

!

Regulations.

Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

I

!

The response directed by this letter and the accompanying Notice is not subject

{

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

l

1

Should you have any questions concerning this inspection, we will be pleased to

l

discuss them with you.

l

Sincerely,

I

.

j

j

OMne! Send Gy ,

j

E R v;nnen

>

l

J. E. Gagliardo Chief

j

Reactor Projects Branch

Enclosures:

(see next page)

8

/,

-

!

>

')

h

L

i

D

'

'

i

RIV: RI;

RIV:SR

I SRI

R B/A

RPB/

RPB @

/

'

l ardo

/

l

v fAPlettner/sn

PHHarre

LD'uBois

J Jaudon

DRHu er

JEGag/86

p///86

g/p(/86

\\0/)IY/86

p /;M/86

IM 86

'

p/tt

I

8611030188 861024

i

i

hDR

ADOCK 05000298

'

PDR

t

< - , - , -

- - . . .

-m.,n,,_,.,__,,.n____,_

_ . _ ,

-

_ _ _ .

. . , , , . _

n,_

-

'

t

i

Nebraska Public Power District

-2-

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-298/86-26

cc w/ enclosures:

Guy R. Horn, Division Manager

of Nuclear Operations

Cooper Nuclear Station

P. O. Box 98

Brownville, Nebraska

68321

Kansas Radiation Control Program Director

' Nebraska Radiation Control Program Director

bcc-to DMB (IE01)

bec distrib. by RIV:

,

  • RPB

DRSP

  • Resident Inspector

R. D. Martin, RA

  • Section Chief (RPB/A)
  • D. Weiss, LFMB (AR-2015)
  • E&SPB
  • RSB
  • MIS System
  • RIV File
  • RSTS Operator
  • P. H. Harrell, RPB/B

l

  • w/766

,

I

i

!

I