Forwards Insp Rept 50-298/86-26 on 860901-30 & Notice of Violation
ML20215M711
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/24/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20215M712 List:
References
NUDOCS 8611030188
Download: ML20215M711 (2)


See also: IR 05000298/1986026

Text

_ _ _ _ _ _ _ _ _ _ _ _ _

.

.

In Reply Refer To:

Docket:

50-298/86-26

Nebraska Public Power District

ATTN:

J. M. Pilant, Manager, Technical

Staff-Nuclear Power Group

P. O. Box 499

Columbus, NE

68601

Gentlemen:

This refers to the inspection conducted by Messrs. D. DuBois, E. Plettner, and

i

P. Harrell of this office during the period September 1-30, 1986, of activities

l

authorized by NRC Operating License DPR-46 for Cooper Nuclear Station and to

the discussion of our findings with Mr. G. Horn and other members of your staff

l ~

at the conclusion of the inspection.

,

i

Areas examined during the inspection included Notification of an Unusual Event,

j

Licensee Event Reports, spent fuel shipment, operational safety verification,

'

monthly. surveillance and maintenance activities, systematic assessment of

l

licensee performance, and annual emergency preparedness exercise.

Within

j

these areas, the inspection consisted of selective examination of procedures

l

and representative records, interviews with personnel, and observations by the

i

NRC inspectors.

The inspection findings are documented in the enclosed

j

inspection report.

1

During this inspection, it was found that certain of your activities were in

!

violation of NRC requirements.

Consequently, you are required to respond to

i

this violation, in writing, in accordance with the provisions of Section 2.201

i

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

!

Regulations.

Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

I

!

The response directed by this letter and the accompanying Notice is not subject

{

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

l

1

Should you have any questions concerning this inspection, we will be pleased to

l

discuss them with you.

l

Sincerely,

I

.

j

j

OMne! Send Gy ,

j

E R v;nnen

>

l

J. E. Gagliardo Chief

j

Reactor Projects Branch

Enclosures:

(see next page)

8

/,

-

!

>

')

h

L

i

D

'

'

i

RIV: RI;

RIV:SR

I SRI

R B/A

RPB/

RPB @

/

'

l ardo

/

l

v fAPlettner/sn

PHHarre

LD'uBois

J Jaudon

DRHu er

JEGag/86

p///86

g/p(/86

\\0/)IY/86

p /;M/86

IM 86

'

p/tt

I

8611030188 861024

i

i

hDR

ADOCK 05000298

'

PDR

t

< - , - , -

- - . . .

-m.,n,,_,.,__,,.n____,_

_ . _ ,

-

_ _ _ .

. . , , , . _

n,_

-

'

t

i

Nebraska Public Power District

-2-

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-298/86-26

cc w/ enclosures:

Guy R. Horn, Division Manager

of Nuclear Operations

Cooper Nuclear Station

P. O. Box 98

Brownville, Nebraska

68321

Kansas Radiation Control Program Director

' Nebraska Radiation Control Program Director

bcc-to DMB (IE01)

bec distrib. by RIV:

,

  • RPB

DRSP

  • Resident Inspector

R. D. Martin, RA

  • Section Chief (RPB/A)
  • D. Weiss, LFMB (AR-2015)
  • E&SPB
  • RSB
  • MIS System
  • RIV File
  • RSTS Operator
  • P. H. Harrell, RPB/B

l

  • w/766

,

I

i

!

I