ML20215M711

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-298/86-26 on 860901-30 & Notice of Violation
ML20215M711
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/24/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20215M712 List:
References
NUDOCS 8611030188
Download: ML20215M711 (2)


See also: IR 05000298/1986026

Text

_ _ _ _ _ _ _ _ _ _ _ _ _

. .

In Reply Refer To:

Docket: 50-298/86-26

Nebraska Public Power District

ATTN: J. M. Pilant, Manager, Technical

Staff-Nuclear Power Group

P. O. Box 499

Columbus, NE 68601

Gentlemen:

This refers to the inspection conducted by Messrs. D. DuBois, E. Plettner, and

i P. Harrell of this office during the period September 1-30, 1986, of activities

l authorized by NRC Operating License DPR-46 for Cooper Nuclear Station and to

the discussion of our findings with Mr. G. Horn and other members of your staff

l~ at the conclusion of the inspection.

,

i Areas examined during the inspection included Notification of an Unusual Event,

j Licensee Event Reports, spent fuel shipment, operational safety verification,

'

monthly. surveillance and maintenance activities, systematic assessment of

l licensee performance, and annual emergency preparedness exercise. Within

j these areas, the inspection consisted of selective examination of procedures

l and representative records, interviews with personnel, and observations by the

i NRC inspectors. The inspection findings are documented in the enclosed

j inspection report.

1 During this inspection, it was found that certain of your activities were in

! violation of NRC requirements. Consequently, you are required to respond to

i this violation, in writing, in accordance with the provisions of Section 2.201

i of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

! Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

I

! The response directed by this letter and the accompanying Notice is not subject

{ to the clearance procedures of the Office of Management and Budget as required

l

by the Paperwork Reduction Act of 1980, PL 96-511.

1 Should you have any questions concerning this inspection, we will be pleased to

l discuss them with you.

l Sincerely, . I

j

j OMne! Send Gy ,

j E R v;nnen >

l J. E. Gagliardo Chief

j Reactor Projects Branch

Enclosures: (see next page) 8 /, -

!

i RIV: RI;

>

'

'

'

RIV:SR

') h

I SRI R B/A

L

RPB/ RPB @

i

/

D

l v fAPlettner/sn PHHarre LD'uBois J Jaudon DRHu er l ardo /

p///86 g/p(/86

'

p /;M/86 IM 86 JEGag/86

p/tt

\0/)IY/86

I

i

8611030188 861024

i

' hDR ADOCK 05000298

PDR

t

< - , - , - - - . . . -m.,n,,_,.,__,,.n____,_ _ . _ , - _ _ _ . . . , , , . _ n,_

-

'

t

i

Nebraska Public Power District -2-

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-298/86-26

cc w/ enclosures:

Guy R. Horn, Division Manager

of Nuclear Operations

Cooper Nuclear Station

P. O. Box 98

Brownville, Nebraska 68321

Kansas Radiation Control Program Director

' Nebraska Radiation Control Program Director

bcc-to DMB (IE01)

, bec distrib. by RIV:

  • RPB DRSP
  • Resident Inspector R. D. Martin, RA
  • Section Chief (RPB/A) *D. Weiss, LFMB (AR-2015)
  • E&SPB *RSB
  • MIS System *RIV File
  • RSTS Operator *P. H. Harrell, RPB/B

l

  • w/766

,

I

i

!

I