{{#Wiki_filter:I
{{#Wiki_filter:I a
- a Docket Nos.:     50-424 and 50-425               %.                    Distribution i ocket D      File,     FWitt g y 51987         NRC PDR         ANotafracesco       1 Local PDR       JKudrick           l Mr. James P. O'Reilly                                   PRC System     JWermiel             !
Distribution Docket Nos.:
Senior Vice President - Nuclear Operations             PD#23 Reading JCraig               j Georgia Power Company                                   MDuncan         CMcCracken           l P. O. Box 4545                                         MMiller         SVarga               i Atlanta, Georgia 30302                                 SKirslis       Glainas OGC-Bethesda
50-424 and 50-425 i ocket File, FWitt D
g y 51987 NRC PDR ANotafracesco 1
Local PDR JKudrick l
Mr. James P. O'Reilly PRC System JWermiel Senior Vice President - Nuclear Operations PD#23 Reading JCraig j
Georgia Power Company MDuncan CMcCracken P. O. Box 4545 MMiller SVarga i
Atlanta, Georgia 30302 SKirslis Glainas OGC-Bethesda


==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==
ACRS (10)                           {
ACRS (10)
{


==Subject:==
==Subject:==
Staff Acceptance of Technical Justification Regarding the Adequacy of Vogtle Diesel Fuel Oil Storage Tank Zinc Coating (TAC 65784)
Staff Acceptance of Technical Justification Regarding the Adequacy of Vogtle Diesel Fuel Oil Storage Tank Zinc Coating (TAC 65784)
License Condition 2.C(8) of the Vogtle Unit 1 full-power license (NPF-68) dated March 16, 1987, states:                                                               <
License Condition 2.C(8) of the Vogtle Unit 1 full-power license (NPF-68) dated March 16, 1987, states:
Prior to restart following the first refueling, GPC shall (1) replace the zinc coating in the diesel generator fuel oil                           '
Prior to restart following the first refueling, GPC shall (1) replace the zinc coating in the diesel generator fuel oil storage tanks with a coating which does not contain zine or (2) by March 1,1988, provide an acceptable justification to the staff that the present fuel oil storage tank zinc-based coating will not affect the operability and reliability of the diesel generators over the life of the plant as specified in IE Circular 77-15.
storage tanks with a coating which does not contain zine or (2) by March 1,1988, provide an acceptable justification to the staff that the present fuel oil storage tank zinc-based coating will not affect the operability and reliability of                           .
By letters dated July 13 September 30, and October 15, 1987, Georgia Power Company (GPC) provided technical information in support of item (2) of the license condition. The staff has completed its review of these submittals and concludes that the zinc coating in the diesel generator fuel oil storage j
the diesel generators over the life of the plant as specified                       !
tanks will not affect the operability and reliability of the diesel generators.
in IE Circular 77-15.                                                                 l By letters dated July 13 September 30, and October 15, 1987, Georgia Power Company (GPC) provided technical information in support of item (2) of the license condition. The staff has completed its review of these submittals                   j and concludes that the zinc coating in the diesel generator fuel oil storage tanks will not affect the operability and reliability of the diesel generators.               l Therefore, GPC has satisfactorily resolved the above license condition. The                 I staff's detailed evaluation is enclosed. This evaluation also applies to Unit 2. The Technical Specifications on the fuel oil regarding neutrali-zation number and mercaptan content shall remain in effect on Unit 1 and should be included in the Technical Specifications proposed for Unit 2 Sincerely,
Therefore, GPC has satisfactorily resolved the above license condition.
                                                          \9 8710230171 871015                                 lanie A. Miller, hoject Manager PDR     ADOCK 05000424                         Project Directorate 11-3 P                     PDR                       Division of Reactor Projects, I/II
The staff's detailed evaluation is enclosed.
This evaluation also applies to Unit 2.
The Technical Specifications on the fuel oil regarding neutrali-zation number and mercaptan content shall remain in effect on Unit 1 and should be included in the Technical Specifications proposed for Unit 2 Sincerely,
\\9 8710230171 871015 lanie A. Miller, hoject Manager PDR ADOCK 05000424 Project Directorate 11-3 P
PDR Division of Reactor Projects, I/II


==Enclosure:==
==Enclosure:==
As stated cc:     See next page
As stated cc:
* SEE PREVIOUS CONCURRENCES Of   R/DRP-I/II       PD#II-3/DRP-I/II     PD#II-3/DRP-I/II     PD#II-3/DRP-I/II
See next page SEE PREVIOUS CONCURRENCES Of R/DRP-I/II PD#II-3/DRP-I/II PD#II-3/DRP-I/II PD#II-3/DRP-I/II
          'sr7mac           *SKirslis           *MDuncan             *DHood, Acting PD 10/       87           10/15/87             10/15/87             10/15/87 NRR/ECEB           NRR/ECEB       NRR/SPLB       NRR/SPLB         NRR/SPLB
'sr7mac
    *FWitt             *CMcCracken   *JCraig         *JKudrick       *ANotafrancesco 10/09/87           10/09/87       10/15/87       10/15/87         10/15/87
*SKirslis
*MDuncan
*DHood, Acting PD 10/
87 10/15/87 10/15/87 10/15/87 NRR/ECEB NRR/ECEB NRR/SPLB NRR/SPLB NRR/SPLB
*FWitt
*CMcCracken
*JCraig
*JKudrick
*ANotafrancesco 10/09/87 10/09/87 10/15/87 10/15/87 10/15/87


    . 4 l
l 4
a                                                                                                         t J
a t
8(pa Mouq     jo,,
8(pa Mouq.
                          .n
J jo,,
                                .                    . UNITED STATES NUCLEAR REGULATORY COMMISSION g               <t                       WASHINGTON, D C. 20555 -                                               h g . . . . . ,o OCT j$ ,gg,                                         !
. UNITED STATES NUCLEAR REGULATORY COMMISSION
                    ~
.n g
Docket Nos.: 50-424 and 50-425                                                                                     l l
<t WASHINGTON, D C. 20555 -
Mr.. James P. O'Reilly Senior Vice President - Nuclear Operations Georgia Power Company P. O. Box 4545             .
h g.....,o
1 Atlanta, Georgia 30302 l            
~
OCT j$,gg, Docket Nos.: 50-424 and 50-425 l
l Mr.. James P. O'Reilly Senior Vice President - Nuclear Operations Georgia Power Company P. O. Box 4545 1
Atlanta, Georgia 30302 l


==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==
==Subject:==
==Subject:==
Staff Acceptance of Technical Justification Regarding the Adequacy.of Vogtle Diesel Fuel Oil Storage Tank Zinc Coating                               j (TAC 65784)
Staff Acceptance of Technical Justification Regarding the Adequacy.of Vogtle Diesel Fuel Oil Storage Tank Zinc Coating j
                                                                                                                            \
(TAC 65784)
License Condition 2.C(8) of the Vogtle Unit 1 full-power license (NPF-68)                                 1 dated March 16, 1987, states:
\\
l                       Prior to restart following the first refueling, GPC shall (1)-
License Condition 2.C(8) of the Vogtle Unit 1 full-power license (NPF-68) 1 dated March 16, 1987, states:
i                       replace the zinc coating in the diesel generator fuel oil                                         I l                       storage tanks with a coating which does not contain zine or
l Prior to restart following the first refueling, GPC shall (1)-
!                        (2) by March 1, 1988, provide an acceptable justification to l                       the staff that the present fuel oil storage tank zinc-based coating will not affect the operability and reliability of l
i replace the zinc coating in the diesel generator fuel oil I
the diesel generators over the life of the plant as specified                                     i in IE Circular 77-15,                                                                             i l
l storage tanks with a coating which does not contain zine or (2) by March 1, 1988, provide an acceptable justification to l
By letters dated July 13, September 30, and October 15, 1987, Georgia Power                                 1 Company (GPC) provided technical information in support of item (2) of the license condition. The staff has completed its review of these submittals and concludes that the zinc coating in the diesel generator fuel oil storage tanks will not affect the operability and reliability of the diesel generators.
the staff that the present fuel oil storage tank zinc-based coating will not affect the operability and reliability of l
Therefore, GPC has satisfactorily resolved the above license condition. The staff's detailed evaluation is enclosed. This evaluation also applies to l
the diesel generators over the life of the plant as specified i
Unit 2. The Technical Specifications on the fuel oil regarding neutrali-zation number and mercaptan content shall remain in effect on Unit 1 and J
in IE Circular 77-15, i
l By letters dated July 13, September 30, and October 15, 1987, Georgia Power 1
Company (GPC) provided technical information in support of item (2) of the license condition. The staff has completed its review of these submittals and concludes that the zinc coating in the diesel generator fuel oil storage tanks will not affect the operability and reliability of the diesel generators.
Therefore, GPC has satisfactorily resolved the above license condition.
The l
staff's detailed evaluation is enclosed.
This evaluation also applies to Unit 2.
The Technical Specifications on the fuel oil regarding neutrali-zation number and mercaptan content shall remain in effect on Unit 1 and J
should be included in the Technical Specifications proposed for Unit 2.
should be included in the Technical Specifications proposed for Unit 2.
1-                                                             Sincerely, 0.
1-Sincerely, 0.
Melanie A. Miller, Project Manager l                                                              Project Directorate II                                                                 Division of Reactor Projects, I/II l
l Melanie A. Miller, Project Manager Project Directorate II,
l Division of Reactor Projects, I/II


==Enclosure:==
==Enclosure:==
As stated cc:     See next page
As stated cc:
                                                                                  ~_       ---_  - - _ _ _ - _ _ _ _ _}}
See next page
~_
- - _ _ _ - _ _ _ _ _}}

Latest revision as of 03:08, 3 December 2024

Forwards Safety Evaluation of Util 870713,0930 & 1015 Submittals Supporting Item 2 of License Condition 2.C(8), Concluding That Zinc Coating in Diesel Generator Fuel Oil Storage Tanks Will Not Affect Reliability of Generators
ML20236A836
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/15/1987
From: Mark Miller
Office of Nuclear Reactor Regulation
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20236A838 List:
References
IEC-77-15, TAC-65784, NUDOCS 8710230171
Download: ML20236A836 (2)


Text

I a

Distribution Docket Nos.:

50-424 and 50-425 i ocket File, FWitt D

g y 51987 NRC PDR ANotafracesco 1

Local PDR JKudrick l

Mr. James P. O'Reilly PRC System JWermiel Senior Vice President - Nuclear Operations PD#23 Reading JCraig j

Georgia Power Company MDuncan CMcCracken P. O. Box 4545 MMiller SVarga i

Atlanta, Georgia 30302 SKirslis Glainas OGC-Bethesda

Dear Mr. O'Reilly:

ACRS (10)

{

Subject:

Staff Acceptance of Technical Justification Regarding the Adequacy of Vogtle Diesel Fuel Oil Storage Tank Zinc Coating (TAC 65784)

License Condition 2.C(8) of the Vogtle Unit 1 full-power license (NPF-68) dated March 16, 1987, states:

Prior to restart following the first refueling, GPC shall (1) replace the zinc coating in the diesel generator fuel oil storage tanks with a coating which does not contain zine or (2) by March 1,1988, provide an acceptable justification to the staff that the present fuel oil storage tank zinc-based coating will not affect the operability and reliability of the diesel generators over the life of the plant as specified in IE Circular 77-15.

By letters dated July 13 September 30, and October 15, 1987, Georgia Power Company (GPC) provided technical information in support of item (2) of the license condition. The staff has completed its review of these submittals and concludes that the zinc coating in the diesel generator fuel oil storage j

tanks will not affect the operability and reliability of the diesel generators.

Therefore, GPC has satisfactorily resolved the above license condition.

The staff's detailed evaluation is enclosed.

This evaluation also applies to Unit 2.

The Technical Specifications on the fuel oil regarding neutrali-zation number and mercaptan content shall remain in effect on Unit 1 and should be included in the Technical Specifications proposed for Unit 2 Sincerely,

\\9 8710230171 871015 lanie A. Miller, hoject Manager PDR ADOCK 05000424 Project Directorate 11-3 P

PDR Division of Reactor Projects, I/II

Enclosure:

As stated cc:

See next page SEE PREVIOUS CONCURRENCES Of R/DRP-I/II PD#II-3/DRP-I/II PD#II-3/DRP-I/II PD#II-3/DRP-I/II

'sr7mac

  • SKirslis
  • MDuncan
  • DHood, Acting PD 10/

87 10/15/87 10/15/87 10/15/87 NRR/ECEB NRR/ECEB NRR/SPLB NRR/SPLB NRR/SPLB

  • FWitt
  • CMcCracken
  • JCraig
  • JKudrick
  • ANotafrancesco 10/09/87 10/09/87 10/15/87 10/15/87 10/15/87

l 4

a t

8(pa Mouq.

J jo,,

. UNITED STATES NUCLEAR REGULATORY COMMISSION

.n g

<t WASHINGTON, D C. 20555 -

h g.....,o

~

OCT j$,gg, Docket Nos.: 50-424 and 50-425 l

l Mr.. James P. O'Reilly Senior Vice President - Nuclear Operations Georgia Power Company P. O. Box 4545 1

Atlanta, Georgia 30302 l

Dear Mr. O'Reilly:

Subject:

Staff Acceptance of Technical Justification Regarding the Adequacy.of Vogtle Diesel Fuel Oil Storage Tank Zinc Coating j

(TAC 65784)

\\

License Condition 2.C(8) of the Vogtle Unit 1 full-power license (NPF-68) 1 dated March 16, 1987, states:

l Prior to restart following the first refueling, GPC shall (1)-

i replace the zinc coating in the diesel generator fuel oil I

l storage tanks with a coating which does not contain zine or (2) by March 1, 1988, provide an acceptable justification to l

the staff that the present fuel oil storage tank zinc-based coating will not affect the operability and reliability of l

the diesel generators over the life of the plant as specified i

in IE Circular 77-15, i

l By letters dated July 13, September 30, and October 15, 1987, Georgia Power 1

Company (GPC) provided technical information in support of item (2) of the license condition. The staff has completed its review of these submittals and concludes that the zinc coating in the diesel generator fuel oil storage tanks will not affect the operability and reliability of the diesel generators.

Therefore, GPC has satisfactorily resolved the above license condition.

The l

staff's detailed evaluation is enclosed.

This evaluation also applies to Unit 2.

The Technical Specifications on the fuel oil regarding neutrali-zation number and mercaptan content shall remain in effect on Unit 1 and J

should be included in the Technical Specifications proposed for Unit 2.

1-Sincerely, 0.

l Melanie A. Miller, Project Manager Project Directorate II,

l Division of Reactor Projects, I/II

Enclosure:

As stated cc:

See next page

~_

- - _ _ _ - _ _ _ _ _