ML20247C851: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:_ . . - _ _ -   -_-__
{{#Wiki_filter:.
                                                    .
_ . . - _ _ -
!   l
-_-__
                            V                                      ,
!
"                                    "                                  '
      .      ..        .
                                          -F'
  .
        -
                                                            MAY l 71989
                  In. Reply Refer To:-
  u              Docket: 50-298/89-17
                  Nebraska Public Power District
                  ATTN      George A. Trevors
                              Division Manager - Nuclear Support
                  P.O. Box 499            .
                  Columbus, NE 68602-0499
                                    -
                  Gentlemen:
                                                                                                              ,
                  This refers,to the inspection conducted by Messrs. L. E. Ellershaw and
                  W. M. McNeill'of this office during the period May 1-5, 1989, of. activities
                          .
                  authorized by NRC Operating License DPR-46 for the . Cooper Nuclear Station, and
                  to the discussion of our findings with Mr. G. R. Horn and other members of your L
                  staff at the conclusion of the inspection.
                                      ~
                  Areas. examined during the inspection included action on previously identified
                  inspection. findings, inservice inspection, and welding. Within these areas,
                  the inspection consisted of selective examination of procedures and
                  representative records, interviews with personnel, and observations by.the NRC
                  ' inspectors. The. inspection findings are documented'in the enclosed inspection
                  report.
                  During this' inspection, it was found that certain of your activities were in
                  violation of NRC requirements.- Consequently, you are required to respond-to
                  these. violations, in writing, in accordance with the provisions of
                .Section 2.201 of the NRC's " Rules of Practice," Part 2,-Title 10, Code of
                  Federal Regulations. Your response should be based on the specifics contained
                  in the Notice of Violation enclosed with this letter.
                  We have also examined actions you have taken with regard to previously
                  identified inspection findings. The status of these items is identified in
                  paragraph 2 of the enclosed. report.
                                        ,
                  The response directed by this letter and the accompanying Notice is not subject
                  to the clearance procedures of the Office of Management and Budget as required
                  by the Paperwork Reduction Act of 1980. PL 96-511.
          #
                      (
              e BINN:MQPS                        4
                                                    s
                                                      '
                                                        S
                                                                [
                                                                .NQ S-      IDRS      D:DRPt M
                                                                                                  .V
                W.EEllershaw/tw            t^W.McNeill      fMarnes      /k LMiJhoan    LJCallan
                  .6/d/89'                    1
                                                6/g/89    U 5/6 /89    0 g/h/89      f//g/89
                              8905250065 890517
l
l
                              DR     ADOCK 0500         8
V
            c .
,
"
"
'
.
..
.
-F'
.
MAY l 71989
-
In. Reply Refer To:-
Docket:
50-298/89-17
u
Nebraska Public Power District
ATTN
George A. Trevors
Division Manager - Nuclear Support
P.O. Box 499
.
Columbus, NE 68602-0499
-
Gentlemen:
,
This refers,to the inspection conducted by Messrs. L. E. Ellershaw and
W. M. McNeill'of this office during the period May 1-5, 1989, of. activities
.
authorized by NRC Operating License DPR-46 for the . Cooper Nuclear Station, and
to the discussion of our findings with Mr. G. R. Horn and other members of your L
~
staff at the conclusion of the inspection.
Areas. examined during the inspection included action on previously identified
inspection. findings, inservice inspection, and welding. Within these areas,
the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by.the NRC
' inspectors. The. inspection findings are documented'in the enclosed inspection
report.
During this' inspection, it was found that certain of your activities were in
violation of NRC requirements.- Consequently, you are required to respond-to
these. violations, in writing, in accordance with the provisions of
.Section 2.201 of the NRC's " Rules of Practice," Part 2,-Title 10, Code of
Federal Regulations. Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 2 of the enclosed. report.
,
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980. PL 96-511.
[
.V
#
(
s
.NQ S-
IDRS
D:DRPt M
e BINN:MQPS
4
S
'
W.EEllershaw/tw
t^W.McNeill
fMarnes
/k LMiJhoan
LJCallan
.6/d/89'
6/g/89
U 5/6 /89
0 g/h/89
f//g/89
1
8905250065 890517
l
DR
ADOCK 0500
8
c .


        _ _ _ _ _ - _             _ _ _ _
_ _ _ _ _ - _
                                          .
_ _ _ _
                                                                                                                                                                                                      *
.
    ,y
*
                      '
,y
  ..
'
                            ..             .
..
                                                                                                                                                                                                                                  ,
,
      .
..
                                                                                                                                                                                                                                    ,
.
                                Nebraska Public Power District                                                       -
.
                                                                                                                        2-
,
  o
Nebraska Public Power District
                              -Should you have any questions concerning this inspection, we will be pleased to
2-
                                discuss them with you.
-
  '
o
                                                                                                                      Sincerely,
-Should you have any questions concerning this inspection, we will be pleased to
  8
discuss them with you.
                                                                                        -
Sincerely,
                                                                                                                    /s/ETBnkeg
'
  H                                                                                                                   L. J. Callan, Director.
8
                                                                                                                      Division of Reactor Projects                                                                                     ,
-
                                Enclosures:                                                                                                                                                                                                   '
/s/ETBnkeg
                              .1. Appendix A - Notice of Violation
H
                              "2. Appendix B - NRC Inspection Report-
L. J. Callan, Director.
                                              !50-298/89-17                                                                                                                                                                               9
Division of Reactor Projects
                                cc w/ enclosures:.
,
                                Coo'per. Nuclear Station
Enclosures:
                                ATTN: Guy Horn,' Division Manager
.1.
                                                  of Nuclear Opdations
Appendix A - Notice of Violation
                                                                                                                                                                                                                                            '
'
                                                                                                                                                                                                                                        ,
"2.
                        3       P.O. Box 98'
Appendix B - NRC Inspection Report-
        s                <      Brownville, Nebraska 68321
!50-298/89-17
                                Kansas Radiation Control Program Director
9
                              -Nebraska Radiation Control Program Director
cc w/ enclosures:.
                                bec to DMB-(IE01)
Coo'per. Nuclear Station
                                -bec distrib.~by RIV:
ATTN: Guy Horn,' Division Manager
                                .*RRI                                                               *R. D. Martin, RA-
'
                                *Section Chief-(DRP/C)                                                   Lisa Shea, RM/ALF
of Nuclear Opdations
                                                                                                    * MIS System
,
                                *RPB-DRSS
3
                                                                                                    * Project Engineer                                                                             (DRP/C)
P.O. Box 98'
                                *RIV File
Brownville, Nebraska 68321
                                *RSTS Operator                                                     *DRP.
s
                                        G. F. Sanborn                                               *LEEllershaw
<
                                *WMMcNeill                                                         *IBarnes
Kansas Radiation Control Program Director
                                                2 copies)
-Nebraska Radiation Control Program Director
                                *DRS-
bec to DMB-(IE01)
                                *P. O' (Connor, NRR Project Manager (MS:                                             13-D-18)
-bec distrib.~by RIV:
                                *w/766
.*RRI
l
*R. D. Martin, RA-
;
*Section Chief-(DRP/C)
Lisa Shea, RM/ALF
MIS System
*
*RPB-DRSS
Project Engineer (DRP/C)
*
*RIV File
*DRP.
*RSTS Operator
*LEEllershaw
G. F. Sanborn
*IBarnes
*WMMcNeill
2 copies)
*DRS- (Connor, NRR Project Manager (MS:
13-D-18)
*P.
O'
*w/766
l;
l
l
I
I
                                                              .u___. _ _ _ _ _ --___ ___   ____m.m __A_-_.m_____._m_     . _ _ _ . _ _ - _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ - . _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _
.u___. _ _ _ _ _ --___ ___
____m.m
__A_-_.m_____._m_
. _ _ _ . _ _ - _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ - . _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _
}}
}}

Latest revision as of 21:16, 1 December 2024

Forwards Insp Rept 50-298/89-17 on 890501-05 & Notice of Violation
ML20247C851
Person / Time
Site: Cooper 
Issue date: 05/17/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20247C855 List:
References
NUDOCS 8905250065
Download: ML20247C851 (2)


See also: IR 05000298/1989017

Text

.

_ . . - _ _ -

-_-__

!

l

V

,

"

"

'

.

..

.

-F'

.

MAY l 71989

-

In. Reply Refer To:-

Docket:

50-298/89-17

u

Nebraska Public Power District

ATTN

George A. Trevors

Division Manager - Nuclear Support

P.O. Box 499

.

Columbus, NE 68602-0499

-

Gentlemen:

,

This refers,to the inspection conducted by Messrs. L. E. Ellershaw and

W. M. McNeill'of this office during the period May 1-5, 1989, of. activities

.

authorized by NRC Operating License DPR-46 for the . Cooper Nuclear Station, and

to the discussion of our findings with Mr. G. R. Horn and other members of your L

~

staff at the conclusion of the inspection.

Areas. examined during the inspection included action on previously identified

inspection. findings, inservice inspection, and welding. Within these areas,

the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by.the NRC

' inspectors. The. inspection findings are documented'in the enclosed inspection

report.

During this' inspection, it was found that certain of your activities were in

violation of NRC requirements.- Consequently, you are required to respond-to

these. violations, in writing, in accordance with the provisions of

.Section 2.201 of the NRC's " Rules of Practice," Part 2,-Title 10, Code of

Federal Regulations. Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed. report.

,

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980. PL 96-511.

[

.V

(

s

.NQ S-

IDRS

D:DRPt M

e BINN:MQPS

4

S

'

W.EEllershaw/tw

t^W.McNeill

fMarnes

/k LMiJhoan

LJCallan

.6/d/89'

6/g/89

U 5/6 /89

0 g/h/89

f//g/89

1

8905250065 890517

l

DR

ADOCK 0500

8

c .

_ _ _ _ _ - _

_ _ _ _

.

,y

'

..

,

..

.

.

,

Nebraska Public Power District

2-

-

o

-Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

'

8

-

/s/ETBnkeg

H

L. J. Callan, Director.

Division of Reactor Projects

,

Enclosures:

.1.

Appendix A - Notice of Violation

'

"2.

Appendix B - NRC Inspection Report-

!50-298/89-17

9

cc w/ enclosures:.

Coo'per. Nuclear Station

ATTN: Guy Horn,' Division Manager

'

of Nuclear Opdations

,

3

P.O. Box 98'

Brownville, Nebraska 68321

s

<

Kansas Radiation Control Program Director

-Nebraska Radiation Control Program Director

bec to DMB-(IE01)

-bec distrib.~by RIV:

.*RRI

  • R. D. Martin, RA-
  • Section Chief-(DRP/C)

Lisa Shea, RM/ALF

MIS System

  • RPB-DRSS

Project Engineer (DRP/C)

  • RIV File
  • DRP.
  • RSTS Operator
  • LEEllershaw

G. F. Sanborn

  • IBarnes
  • WMMcNeill

2 copies)

  • DRS- (Connor, NRR Project Manager (MS:

13-D-18)

  • P.

O'

  • w/766

l;

l

I

.u___. _ _ _ _ _ --___ ___

____m.m

__A_-_.m_____._m_

. _ _ _ . _ _ - _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ - . _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _