ML20249B235: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:3 syny m, woe
3
.v' s
                                                  -      .v'               s       ~. syny m, woe PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE -PNO-76-10 Thin pr211minery notific: tion constituta EARLY notien of events of POSSIBLE safety or public interest significance. The information                       '
~.
presented is as initially received without verification or evaluation and is basically all that is known by OIE staff as of 2:00 P. M. on date of this notification. IT SHOULD BE SPECIFICALLY NOTED THAT THIS NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY BE DETERMINED TO BE INACCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT NOTIFICATION OF AN INCIDENT OR OCCURRENCE (BLUE SHEET) SUBSEQUENTLY WILL BE ISSUED IF WARRANTED.
PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE -PNO-76-10 Thin pr211minery notific: tion constituta EARLY notien of events of POSSIBLE safety or public interest significance.
Facility:   J. A. FitzPatrick (DN 50-333)
The information presented is as initially received without verification or evaluation and is basically all that is known by OIE staff as of 2:00 P. M. on date of this notification.
IT SHOULD BE SPECIFICALLY NOTED THAT THIS NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY BE DETERMINED TO BE INACCURATE OR INCONSISTENT.
AN OFFICE OF INSPECTION AND ENFORCEMENT NOTIFICATION OF AN INCIDENT OR OCCURRENCE (BLUE SHEET) SUBSEQUENTLY WILL BE ISSUED IF WARRANTED.
Facility:
J. A. FitzPatrick (DN 50-333)
Power Authority of the State of New York (PASNY)
Power Authority of the State of New York (PASNY)
Niagara Mohawk Power Corporation (NMPC)
Niagara Mohawk Power Corporation (NMPC)
Line 26: Line 30:
==Subject:==
==Subject:==
REANALYSIS OF SPENT FUEL STORAGE RACK SEISMIC DESIGN The licensee was informed on January 19 by the Architect Engineer, Stone &
REANALYSIS OF SPENT FUEL STORAGE RACK SEISMIC DESIGN The licensee was informed on January 19 by the Architect Engineer, Stone &
                                                                                                          ~
~
Webster, Boston, Mass. that a major portion of the plant's spent fuel storage racks do not meet their seismic design criteria, when loaded with fuel. At present, there is no fuel in the storage racks. However, the plant is shut-down for the incore instrument vibration modification which requires partial ustloading of the core. Previous plans had scheduled fuel movement to start on January 25. These plans are being reviewed based on the information obtained
Webster, Boston, Mass. that a major portion of the plant's spent fuel storage racks do not meet their seismic design criteria, when loaded with fuel. At present, there is no fuel in the storage racks.
    ~ ~ ' '
However, the plant is shut-down for the incore instrument vibration modification which requires partial ustloading of the core.
from Stone and Wahsrar. Tha avrane of deley or the effect en the plerned outage is' unknown at this time. I&E is a'ctively" developing further infor-mation to determine the extent of the problem which could have generic implications.
Previous plans had scheduled fuel movement to start on January 25. These plans are being reviewed based on the information obtained from Stone and Wahsrar. Tha avrane of deley or the effect en the plerned
Media interest is expected because of specific public interest in spent fuel storage at Nine Mile Point Unit 1, and of general interest in the fuel                     OI!
~ ~ ' '
storage problem at nuclear power plants.         The State of New York has been           y!
outage is' unknown at this time.
                                                                                                              /
I&E is a'ctively" developing further infor-mation to determine the extent of the problem which could have generic implications.
i               informed. A press release is not planned at this time.                                       !
Media interest is expected because of specific public interest in spent fuel O I storage at Nine Mile Point Unit 1, and of general interest in the fuel storage problem at nuclear power plants.
\
The State of New York has been y!
6l Region I, NRC, Philadelphia, Pa. received notification of this occurrence by               (!
/
telephone from the licensee at 1045 January 20.         This report includes infor-nation which.is accurate as of 1300 January 20.                                           f 8
i informed. A press release is not planned at this time.
\\
6l Region I, NRC, Philadelphia, Pa. received notification of this occurrence by
(!
telephone from the licensee at 1045 January 20.
This report includes infor-f nation which.is accurate as of 1300 January 20.
8


==Contact:==
==Contact:==
FADreher, IE x27261       GWRoy, IE x27353           HDThornburg, IE x27541 Distribution:
FADreher, IE x27261 GWRoy, IE x27353 HDThornburg, IE x27541 Distribution:
Chairman Anders                                                                             )
)
Commissioner Mason             S. J. Chilk, SECY Commissioner Gilinsky             Commissioner Rowden             G. F. Murphy, JCAE Commissioner Kennedy             C. C. Kammerer, CA L. V. Gossick,                   J. G. Davis, OIE               J. A. Harris, PA B. C. Rusche, NRR               .J. La Fleur, ISP               T. J. McTiernan, AIA K. R. Chapman, NMSS               H. K. Shapar, ELD
Chairman Anders Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky Commissioner Rowden G. F. Murphy, JCAE Commissioner Kennedy C. C. Kammerer, CA L. V. Gossick, J. G. Davis, OIE J. A. Harris, PA B. C. Rusche, NRR
      '7   *' '                                                                                        '
.J. La Fleur, ISP T. J. McTiernan, AIA K. R. Chapman, NMSS H. K. Shapar, ELD
Transmitted: P Bldg A /) ; H St 1             ; MNBB ).-     J7 ;   Luge #
'7 Transmitted: P Bldg A /) ; H St 1
-                                          U               /               V PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE l _,,               62     14 760120                         -  ----        - - -
; MNBB ).-
PNO-76-010         pop                                               ,}}
J7 ;
Luge #
U
/
V PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE l _,,
62 14 760120 PNO-76-010 pop
,}}

Latest revision as of 14:08, 30 November 2024

PNO-76-010:on 760109,licensee Was Informed by Stone & Webster That Major Portion of Plant Sf Storage Racks Do Not Meet Seismic Design Criteria,When Loaded W/Fuel.Plans for Fuel Movement Being Reviewed.State of New York Informed
ML20249B235
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/20/1976
From: Dreher F, Roy G, Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-76-010, PNO-76-10, NUDOCS 9806220214
Download: ML20249B235 (1)


Text

3 syny m, woe

.v' s

~.

PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE -PNO-76-10 Thin pr211minery notific: tion constituta EARLY notien of events of POSSIBLE safety or public interest significance.

The information presented is as initially received without verification or evaluation and is basically all that is known by OIE staff as of 2:00 P. M. on date of this notification.

IT SHOULD BE SPECIFICALLY NOTED THAT THIS NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY BE DETERMINED TO BE INACCURATE OR INCONSISTENT.

AN OFFICE OF INSPECTION AND ENFORCEMENT NOTIFICATION OF AN INCIDENT OR OCCURRENCE (BLUE SHEET) SUBSEQUENTLY WILL BE ISSUED IF WARRANTED.

Facility:

J. A. FitzPatrick (DN 50-333)

Power Authority of the State of New York (PASNY)

Niagara Mohawk Power Corporation (NMPC)

Subject:

REANALYSIS OF SPENT FUEL STORAGE RACK SEISMIC DESIGN The licensee was informed on January 19 by the Architect Engineer, Stone &

~

Webster, Boston, Mass. that a major portion of the plant's spent fuel storage racks do not meet their seismic design criteria, when loaded with fuel. At present, there is no fuel in the storage racks.

However, the plant is shut-down for the incore instrument vibration modification which requires partial ustloading of the core.

Previous plans had scheduled fuel movement to start on January 25. These plans are being reviewed based on the information obtained from Stone and Wahsrar. Tha avrane of deley or the effect en the plerned

~ ~ ' '

outage is' unknown at this time.

I&E is a'ctively" developing further infor-mation to determine the extent of the problem which could have generic implications.

Media interest is expected because of specific public interest in spent fuel O I storage at Nine Mile Point Unit 1, and of general interest in the fuel storage problem at nuclear power plants.

The State of New York has been y!

/

i informed. A press release is not planned at this time.

\\

6l Region I, NRC, Philadelphia, Pa. received notification of this occurrence by

(!

telephone from the licensee at 1045 January 20.

This report includes infor-f nation which.is accurate as of 1300 January 20.

8

Contact:

FADreher, IE x27261 GWRoy, IE x27353 HDThornburg, IE x27541 Distribution:

)

Chairman Anders Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky Commissioner Rowden G. F. Murphy, JCAE Commissioner Kennedy C. C. Kammerer, CA L. V. Gossick, J. G. Davis, OIE J. A. Harris, PA B. C. Rusche, NRR

.J. La Fleur, ISP T. J. McTiernan, AIA K. R. Chapman, NMSS H. K. Shapar, ELD

'7 Transmitted: P Bldg A /) ; H St 1

MNBB ).-

J7 ;

Luge #

U

/

V PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE l _,,

62 14 760120 PNO-76-010 pop

,