ML20249C283: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:__- _ _ ___ - _ _- _ _ _ _ ___ __-____ __ - _-____ ________ __                                 _
{{#Wiki_filter:__- _ _ ___ - _ _- _ _ _ _ ___ __-____ __ - _-____ ________ __
    ,
_
                                                                              Jun3 19, 1998
,
  .
Jun3 19, 1998
                      Mr. S. A. Patuiski
.
                      Site Vice President
Mr. S. A. Patuiski
                      Poht Beach Nuclear Plant
Site Vice President
                      6610 Nuclear Road
Poht Beach Nuclear Plant
                      Two Rivers, WI 54241                                                                                                                                                   l
6610 Nuclear Road
                      SUBJECT:               POINT BEACH INSPECTION REPORT 50-266/98009(DRP);
Two Rivers, WI 54241
                                              50-301/98009(DRP) AND NOTICE OF VIOLATION
l
                      Dear Mr. Patuiski:
SUBJECT:
                      On May 23,1998, the NRC completed an inspection at your Point Beach 1 and 2 reactor
POINT BEACH INSPECTION REPORT 50-266/98009(DRP);
                      facilities. The enclosed inspection report presents the results of that inspection.
50-301/98009(DRP) AND NOTICE OF VIOLATION
                        During this 6-week inspection period, the Point Beach facility was operated safely. Several self-
Dear Mr. Patuiski:
                        assessments performed by plant staff and industry peers were effective in identifying areas
On May 23,1998, the NRC completed an inspection at your Point Beach 1 and 2 reactor
                      where improvement was needed t.1d proposed corrective actions were appropriate. In one case                                                                       ,
facilities. The enclosed inspection report presents the results of that inspection.
                      involving inadequate surveillance testing of refueling equipment interlocks, engineering and
During this 6-week inspection period, the Point Beach facility was operated safely. Several self-
                      regulatory services staff did not implement comprehensive corrective actions for an assessment
assessments performed by plant staff and industry peers were effective in identifying areas
                      finding. A violation of NRC requirements was identified regarding the failure to test all required
where improvement was needed t.1d proposed corrective actions were appropriate. In one case
                      refueling system interlocks.
,
                        The identified violation is cited in the enclosed Notice of Violation, and the circumstances
involving inadequate surveillance testing of refueling equipment interlocks, engineering and
                        surrounding the violation are described in detailin the enclosed report. Please note that you are
regulatory services staff did not implement comprehensive corrective actions for an assessment
                        required to respond to this letter and should follow the instructions specified in the enclosed
finding. A violation of NRC requirements was identified regarding the failure to test all required
                        Notice when preparing your response. The NRC will use your response, in part, to determine
refueling system interlocks.
                        whether further enforcement action is necessary to ensure compliance with regulatory
The identified violation is cited in the enclosed Notice of Violation, and the circumstances
                        requirements.
surrounding the violation are described in detailin the enclosed report. Please note that you are
                        in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
required to respond to this letter and should follow the instructions specified in the enclosed
                        enclosures, and your response will be placed in the NRC Public Document Room.
Notice when preparing your response. The NRC will use your response, in part, to determine
                                                                                          Sincerely,
whether further enforcement action is necessary to ensure compliance with regulatory
                                                                                          Original signed by M. Dapas
requirements.
                                                                                          Geoffrey E. Grant, Director
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
                                                                                          Division of Reactor Projects
enclosures, and your response will be placed in the NRC Public Document Room.
                          9ocket Nos.: 50-266;50-301                                                                                                                               <
Sincerely,
                          License Nos.: DPR-24; DPR-27
Original signed by M. Dapas
                          Enclosures:         1.       Notice of Violation                                                                                                     k
Geoffrey E. Grant, Director
                                                2.       Inspection Report 50-266/98009(DRP);
Division of Reactor Projects
                                                            50-301/98009(DRP)
9ocket Nos.: 50-266;50-301
                                                                                                                                                                                      ll
<
f                          DOCUMENT NAME: R:\lnsprpts\ powers \poin\ poi 98009.drp
License Nos.: DPR-24; DPR-27
                          To receive a copy of thle docuenent. Indcate in the box 'C' = Copy without ettech nent/ enclosure "E" = Copy with attachment / enclosure
Enclosures:
                          'N' = No espy
1.
                            OFFICE                     Rlli                       Rlli                                                                   c Rill , , ,   [ Rill
Notice of Violation
                            NAME                      Kunowsk                    JMcBpAKp                                                                           ee   G
k
                            DATE                       06//198                     06 #/98                                                                 06h98           06d98
2.
f-                                                                           OFFICIAL RECORD COPY'
Inspection Report 50-266/98009(DRP);
ll
50-301/98009(DRP)
f
DOCUMENT NAME: R:\\lnsprpts\\ powers \\poin\\ poi 98009.drp
To receive a copy of thle docuenent. Indcate in the box 'C' = Copy without ettech nent/ enclosure "E" = Copy with attachment / enclosure
'N' = No espy
OFFICE
Rlli
Rlli
c Rill , , ,
[
Rill
JMcBpAKp
ee
G
NAME
Kunowsk
DATE
06//198
06 #/98
06h98
06d98
f-
OFFICIAL RECORD COPY'
l'
l'
                                                                            "
"
i                           9906290002 990619
i
!                           PDR       ADOCK 05000266
9906290002 990619
                            @                             PDR
!
L     _ _ _ _ _ _ _ _ _ _
PDR
ADOCK 05000266
@
PDR
L
_ _ _ _ _ _ _ _ _ _


                                                    - _ _ _ - ___ _ _ _ _ - _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ . .     _ _ _ _ _ _ _
- _ _ _ -
    ~
___
l .
_ _ _ _ - _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _
_ . .
_ _ _ _ _ _ _
~
l
.
l
l
l
l
l
l                                  S. Patuiski                                                         -3-
S. Patuiski
-3-
l
l
                                    Distribution:
Distribution:
                                  CAC (E-Mail)
CAC (E-Mail)
                                    Project Mgr., NRR w/ encl
Project Mgr., NRR w/ encl
                                  C. Paperiello, Rlll w/enct
C. Paperiello, Rlll w/enct
                                  J. Caldwell, Rill w/enci
J. Caldwell, Rill w/enci
                                    B. Clayton, Rlll w/enci
B. Clayton, Rlll w/enci
                                  SRI Point Beach w/ enc!
SRI Point Beach w/ enc!
                                    DRP w/ encl
DRP w/ encl
                                  TSS w/enct
TSS w/enct
                                    DRS (2) w/enct
DRS (2) w/enct
                                    Rill PRR w/enci
Rill PRR w/enci
                                    PUBLIC IE-01 w/enci
PUBLIC IE-01 w/enci
                                    Docket File w/enci
Docket File w/enci
                                    GREENS
GREENS
                                  - LEO (E-Mail)
- LEO (E-Mail)
                                    DOCDESK (E-Mail)
DOCDESK (E-Mail)
                                                                                                                                                      1
1
                                                                                                                                  s
s
                                                                                                                                    j\
j\\
                                                                                                                                                      4
4
                                                CCC005
CCC005
                      .
.
    _ . - . _ _ _ _ _ _ . _ . _ .               _
_ . - . _ _ _ _ _ _ . _ . _ .
_
}}
}}

Latest revision as of 13:54, 30 November 2024

Forwards Insp Repts 50-266/98-09 & 50-301/98-09 on 980414- 0523 & NOV
ML20249C283
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/19/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Patulski S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20249C284 List:
References
50-266-98-09, 50-266-98-9, 50-301-98-09, 50-301-98-9, NUDOCS 9806290002
Download: ML20249C283 (2)


See also: IR 05000266/1998009

Text

__- _ _ ___ - _ _- _ _ _ _ ___ __-____ __ - _-____ ________ __

_

,

Jun3 19, 1998

.

Mr. S. A. Patuiski

Site Vice President

Poht Beach Nuclear Plant

6610 Nuclear Road

Two Rivers, WI 54241

l

SUBJECT:

POINT BEACH INSPECTION REPORT 50-266/98009(DRP);

50-301/98009(DRP) AND NOTICE OF VIOLATION

Dear Mr. Patuiski:

On May 23,1998, the NRC completed an inspection at your Point Beach 1 and 2 reactor

facilities. The enclosed inspection report presents the results of that inspection.

During this 6-week inspection period, the Point Beach facility was operated safely. Several self-

assessments performed by plant staff and industry peers were effective in identifying areas

where improvement was needed t.1d proposed corrective actions were appropriate. In one case

,

involving inadequate surveillance testing of refueling equipment interlocks, engineering and

regulatory services staff did not implement comprehensive corrective actions for an assessment

finding. A violation of NRC requirements was identified regarding the failure to test all required

refueling system interlocks.

The identified violation is cited in the enclosed Notice of Violation, and the circumstances

surrounding the violation are described in detailin the enclosed report. Please note that you are

required to respond to this letter and should follow the instructions specified in the enclosed

Notice when preparing your response. The NRC will use your response, in part, to determine

whether further enforcement action is necessary to ensure compliance with regulatory

requirements.

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

Sincerely,

Original signed by M. Dapas

Geoffrey E. Grant, Director

Division of Reactor Projects

9ocket Nos.: 50-266;50-301

<

License Nos.: DPR-24; DPR-27

Enclosures:

1.

Notice of Violation

k

2.

Inspection Report 50-266/98009(DRP);

ll

50-301/98009(DRP)

f

DOCUMENT NAME: R:\\lnsprpts\\ powers \\poin\\ poi 98009.drp

To receive a copy of thle docuenent. Indcate in the box 'C' = Copy without ettech nent/ enclosure "E" = Copy with attachment / enclosure

'N' = No espy

OFFICE

Rlli

Rlli

c Rill , , ,

[

Rill

JMcBpAKp

ee

G

NAME

Kunowsk

DATE

06//198

06 #/98

06h98

06d98

f-

OFFICIAL RECORD COPY'

l'

"

i

9906290002 990619

!

PDR

ADOCK 05000266

@

PDR

L

_ _ _ _ _ _ _ _ _ _

- _ _ _ -

___

_ _ _ _ - _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _

_ . .

_ _ _ _ _ _ _

~

l

.

l

l

l

S. Patuiski

-3-

l

Distribution:

CAC (E-Mail)

Project Mgr., NRR w/ encl

C. Paperiello, Rlll w/enct

J. Caldwell, Rill w/enci

B. Clayton, Rlll w/enci

SRI Point Beach w/ enc!

DRP w/ encl

TSS w/enct

DRS (2) w/enct

Rill PRR w/enci

PUBLIC IE-01 w/enci

Docket File w/enci

GREENS

- LEO (E-Mail)

DOCDESK (E-Mail)

1

s

j\\

4

CCC005

.

_ . - . _ _ _ _ _ _ . _ . _ .

_