ML20249C283
| ML20249C283 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/19/1998 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Patulski S WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20249C284 | List: |
| References | |
| 50-266-98-09, 50-266-98-9, 50-301-98-09, 50-301-98-9, NUDOCS 9806290002 | |
| Download: ML20249C283 (2) | |
See also: IR 05000266/1998009
Text
__- _ _ ___ - _ _- _ _ _ _ ___ __-____ __ - _-____ ________ __
_
,
Jun3 19, 1998
.
Mr. S. A. Patuiski
Site Vice President
Poht Beach Nuclear Plant
6610 Nuclear Road
Two Rivers, WI 54241
l
SUBJECT:
POINT BEACH INSPECTION REPORT 50-266/98009(DRP);
50-301/98009(DRP) AND NOTICE OF VIOLATION
Dear Mr. Patuiski:
On May 23,1998, the NRC completed an inspection at your Point Beach 1 and 2 reactor
facilities. The enclosed inspection report presents the results of that inspection.
During this 6-week inspection period, the Point Beach facility was operated safely. Several self-
assessments performed by plant staff and industry peers were effective in identifying areas
where improvement was needed t.1d proposed corrective actions were appropriate. In one case
,
involving inadequate surveillance testing of refueling equipment interlocks, engineering and
regulatory services staff did not implement comprehensive corrective actions for an assessment
finding. A violation of NRC requirements was identified regarding the failure to test all required
refueling system interlocks.
The identified violation is cited in the enclosed Notice of Violation, and the circumstances
surrounding the violation are described in detailin the enclosed report. Please note that you are
required to respond to this letter and should follow the instructions specified in the enclosed
Notice when preparing your response. The NRC will use your response, in part, to determine
whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room.
Sincerely,
Original signed by M. Dapas
Geoffrey E. Grant, Director
Division of Reactor Projects
9ocket Nos.: 50-266;50-301
<
Enclosures:
1.
k
2.
Inspection Report 50-266/98009(DRP);
ll
50-301/98009(DRP)
f
DOCUMENT NAME: R:\\lnsprpts\\ powers \\poin\\ poi 98009.drp
To receive a copy of thle docuenent. Indcate in the box 'C' = Copy without ettech nent/ enclosure "E" = Copy with attachment / enclosure
'N' = No espy
OFFICE
Rlli
Rlli
c Rill , , ,
[
Rill
JMcBpAKp
ee
G
NAME
Kunowsk
DATE
06//198
06 #/98
06h98
06d98
f-
OFFICIAL RECORD COPY'
l'
"
i
9906290002 990619
!
ADOCK 05000266
@
L
_ _ _ _ _ _ _ _ _ _
- _ _ _ -
___
_ _ _ _ - _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _
_ . .
_ _ _ _ _ _ _
~
l
.
l
l
l
S. Patuiski
-3-
l
Distribution:
CAC (E-Mail)
Project Mgr., NRR w/ encl
C. Paperiello, Rlll w/enct
J. Caldwell, Rill w/enci
B. Clayton, Rlll w/enci
SRI Point Beach w/ enc!
DRP w/ encl
TSS w/enct
DRS (2) w/enct
Rill PRR w/enci
PUBLIC IE-01 w/enci
Docket File w/enci
GREENS
- LEO (E-Mail)
DOCDESK (E-Mail)
1
s
j\\
4
CCC005
.
_ . - . _ _ _ _ _ _ . _ . _ .
_