ML20238E917: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_ _ _ _ , _ _ _
{{#Wiki_filter:_ _ _ _, _ _ _
T.
T.
ep 2.0 ' SAFETY LIMITS AND'0PERATING RESTRICTIONS 2.1 Safety Limits Criticality: The' reactor shall be subcritical when the three control blades are at their fully 1:ithdrawn positions and the regulating blade is in its. fully inserted position.
ep 2.0 ' SAFETY LIMITS AND'0PERATING RESTRICTIONS 2.1 Safety Limits Criticality: The' reactor shall be subcritical when the three control blades are at their fully 1:ithdrawn positions and the regulating blade is in its. fully inserted position.
Shutdown Mergin:     The minimum shutdown margin under any condition with the
Shutdown Mergin:
        ,                              highest worth control blade fully withdrawn shall be no less than 1% Ak/k.
The minimum shutdown margin under any condition with the highest worth control blade fully withdrawn shall be no less than 1% Ak/k.
9 6                                     Magnet Release and Blade Drop Times: The interval between the occurrence of cutoff voltage (scram) and the separation of each control blade from its
9 6
: .F,                              - magnet shall not exceed 100 msec. Total time of insertion of the first 24 in, of the control _ blades following initiation of a scram signal shall be
Magnet Release and Blade Drop Times: The interval between the occurrence
[ce         t less than 600 msec, including the magnet release time.
.F, of cutoff voltage (scram) and the separation of each control blade from its
F1 Maximum Excess Reactivity: The maximum excess reactivity above cold, clean, critical shall be 0.5% Ak/k.
- magnet shall not exceed 100 msec. Total time of insertion of the first 24 in, of the control _ blades following initiation of a scram signal shall be
[ce less than 600 msec, including the magnet release time.
F 1 t
Maximum Excess Reactivity: The maximum excess reactivity above cold, clean, critical shall be 0.5% Ak/k.
Radiation Alarms: Upon indication of radiation levels in excess of 50 mrems/hr (20 mrems/hr for fuel storage) area rianitors shall actuate audible
Radiation Alarms: Upon indication of radiation levels in excess of 50 mrems/hr (20 mrems/hr for fuel storage) area rianitors shall actuate audible
                                    - evacuation alarms < in the reactor room and in the second and third floor areas above the. reactor pool.
- evacuation alarms < in the reactor room and in the second and third floor areas above the. reactor pool.
Radiation Levels: The maximum rediation levels 1 m above the pool surface and at the surface of the concrete shield, when the beam port and' thermal     '
Radiation Levels:
column ~ are closed, shall be'less than 50 mrems/hr.
The maximum rediation levels 1 m above the pool surface and at the surface of the concrete shield, when the beam port and' thermal column ~ are closed, shall be'less than 50 mrems/hr.
Control Blade Withdrawr,1: the maximum withdrawal rate for.a control blade     i 1
Control Blade Withdrawr,1: the maximum withdrawal rate for.a control blade i
shall be 7.5 in./ min. ?The maximum reactivity addition ratt through move-ment of. the regulating blade shall be 0.006% Ak/k sec. Interlocks shall         !
shall be 7.5 in./ min. ?The maximum reactivity addition ratt through move-1 ment of. the regulating blade shall be 0.006% Ak/k sec.
p
Interlocks shall p
prevent simultaneous withdrawal of more than one control blade and shall d
~
~
prevent simultaneous withdrawal of more than one control blade and shall        d Y prevent withdrawal. of any control blade unless the regulating blade is T(                             fully inserted.                                                               q o
Y prevent withdrawal. of any control blade unless the regulating blade is T(
Regulating Blade Worth: The regulating blade shall have a reactivity worth of less .than the effective delayed neutron fraction.
fully inserted.
Startup Source Requirement: Ouring reactor startup, a neutron source producing at least 10 neutrons /sec shall be located adjacent to the fuel         ,
q o
region.- When readings on the log count rate meter are below 50 counts /sec,     1 an interlock shall prevent withdrawal of any control blade.
Regulating Blade Worth: The regulating blade shall have a reactivity worth of less.than the effective delayed neutron fraction.
Temperature and Void Coefficients: Thetemperatureandgoidcoefficients of reac6v~Eishall- be more neggtive than -2 x 10~5 k/k F and -2 x 10~8 A k/k %. void,nmspectively, at 80 F.
Startup Source Requirement: Ouring reactor startup, a neutron source producing at least 10 neutrons /sec shall be located adjacent to the fuel region.- When readings on the log count rate meter are below 50 counts /sec, 1
Water Level: The minimum depth of water above the top of the end box of           I the core Fiel elements.in the reactor pool shall be 10 f t.                       i Water Puritv: Corrective action shall be taken promptly if the following           ,
an interlock shall prevent withdrawal of any control blade.
Timits TEF'the pool water are not met:
Temperature and Void Coefficients: Thetemperatureandgoidcoefficients of reac6v~Eishall-be more neggtive than -2 x 10~5 k/k F and -2 x 10~8 A k/k %. void,nmspectively, at 80 F.
l N[           iga c5000334       1 870910Y P
Water Level: The minimum depth of water above the top of the end box of the core Fiel elements.in the reactor pool shall be 10 f t.
c   pp Worcester Tech Specs                             3
i Water Puritv: Corrective action shall be taken promptly if the following Timits TEF'the pool water are not met:
: x.                                                                                                                         .,
N[ iga c5000334 1 870910Y P
            \                                                                                   'I (1) startup channel, background to'10-2% , full power, i .e. ,Taackground to 1 W.
pp c
                              -(2) log-N period channel: 2 x 10 % to 150% full power; i .e.., 0.2 W .to 13 kW (3) Linear safety channels 1 aad 2; 2 x 10~3% to 150% full power; Ne.,
Worcester Tech Specs 3
0.2 W to 15 kW 4.5.2 Control Blades                           '
 
m
x.
                        ..There shall be three control blades, tvch consisting of vertical                         y aluminum-clad boral blades 10.5 in. wid2 x 40.5 in. long x 0.375 in thick.         ,
\\
4.5.3         Regulating Blade                                                     t       $
'I (1) startup channel, background to'10-2%, full power, i.e.,Taackground to 1 W.
m There shall be one regulating blade consisting of 'a vertical stainir.ss-                 ,
-(2) log-N period channel: 2 x 10 % to 150% full power; i.e.., 0.2 W.to 13 kW (3) Linear safety channels 1 aad 2; 2 x 10~3% to 150% full power; Ne.,
steel blade 10.65 in wide x 40.51r,. long x 0.125 in. thick.
0.2 W to 15 kW 4.5.2 Control Blades m
1,l y .
..There shall be three control blades, tvch consisting of vertical y
4.5.4         Blade Position I'ndicators The blade position indicator on tne consolec shall provide an indication of the blade position to within + .02 dn. ' Signal lights shall be proviced for each control blade drive and for the regulating; blade to indicate the upper and lower limits of travel and, in the case of control blades, an armatcre engaged by a magnet.
aluminum-clad boral blades 10.5 in. wid2 x 40.5 in. long x 0.375 in thick.
4.5.3 Regulating Blade t
m There shall be one regulating blade consisting of 'a vertical stainir.ss-steel blade 10.65 in wide x 40.51r,. long x 0.125 in. thick.
1,l y.
4.5.4 Blade Position I'ndicators The blade position indicator on tne consolec shall provide an indication of the blade position to within +.02 dn. ' Signal lights shall be proviced for each control blade drive and for the regulating; blade to indicate the upper and lower limits of travel and, in the case of control blades, an armatcre engaged by a magnet.
l l
l l
1 l
1 l
,                                                                                              s f C l
s f
C l
1
1
                                                                                                                                      )
)
9 Worcester Tech Specs                                                                             '!
9 Worcester Tech Specs


n---~,;-.                                               ,
n---~,;-.
                                                                '  .(
.(
i                                                      /.
/.
s
i s
            \   h                                                           p   Q s
\\
h p
Q s
a r
a r
                                            <r '
<r '
m en C3 s
m enC3.4 s
                                                  .4      e M                       -
e M
u>                       tb, 4
tb, u>
              ,          ::a                     y Y
4
E.
::a y
I k                                                                         .
YE.
I k
1 4
1 4
1
1
                                                                                    -l l
-l l
* 1
1 1
* 1 i
i f
f 1
1 I
I e
e l
l l
l i
i
I
    ""                   _ _ _ _ . . . . . _ _ .                                      I}}
""}}

Latest revision as of 06:21, 2 December 2024

Proposed Tech Specs,Changing Control Blade Withdrawal & Adding Shutdown Margin & Regulating Blade Worth to Safety Limits
ML20238E917
Person / Time
Site: 05000134
Issue date: 09/10/1987
From:
WORCESTER POLYTECHNIC INSTITUTE, WORCESTER, MA
To:
Shared Package
ML20238E910 List:
References
NUDOCS 8709150291
Download: ML20238E917 (2)


Text

_ _ _ _, _ _ _

T.

ep 2.0 ' SAFETY LIMITS AND'0PERATING RESTRICTIONS 2.1 Safety Limits Criticality: The' reactor shall be subcritical when the three control blades are at their fully 1:ithdrawn positions and the regulating blade is in its. fully inserted position.

Shutdown Mergin:

The minimum shutdown margin under any condition with the highest worth control blade fully withdrawn shall be no less than 1% Ak/k.

9 6

Magnet Release and Blade Drop Times: The interval between the occurrence

.F, of cutoff voltage (scram) and the separation of each control blade from its

- magnet shall not exceed 100 msec. Total time of insertion of the first 24 in, of the control _ blades following initiation of a scram signal shall be

[ce less than 600 msec, including the magnet release time.

F 1 t

Maximum Excess Reactivity: The maximum excess reactivity above cold, clean, critical shall be 0.5% Ak/k.

Radiation Alarms: Upon indication of radiation levels in excess of 50 mrems/hr (20 mrems/hr for fuel storage) area rianitors shall actuate audible

- evacuation alarms < in the reactor room and in the second and third floor areas above the. reactor pool.

Radiation Levels:

The maximum rediation levels 1 m above the pool surface and at the surface of the concrete shield, when the beam port and' thermal column ~ are closed, shall be'less than 50 mrems/hr.

Control Blade Withdrawr,1: the maximum withdrawal rate for.a control blade i

shall be 7.5 in./ min. ?The maximum reactivity addition ratt through move-1 ment of. the regulating blade shall be 0.006% Ak/k sec.

Interlocks shall p

prevent simultaneous withdrawal of more than one control blade and shall d

~

Y prevent withdrawal. of any control blade unless the regulating blade is T(

fully inserted.

q o

Regulating Blade Worth: The regulating blade shall have a reactivity worth of less.than the effective delayed neutron fraction.

Startup Source Requirement: Ouring reactor startup, a neutron source producing at least 10 neutrons /sec shall be located adjacent to the fuel region.- When readings on the log count rate meter are below 50 counts /sec, 1

an interlock shall prevent withdrawal of any control blade.

Temperature and Void Coefficients: Thetemperatureandgoidcoefficients of reac6v~Eishall-be more neggtive than -2 x 10~5 k/k F and -2 x 10~8 A k/k %. void,nmspectively, at 80 F.

Water Level: The minimum depth of water above the top of the end box of the core Fiel elements.in the reactor pool shall be 10 f t.

i Water Puritv: Corrective action shall be taken promptly if the following Timits TEF'the pool water are not met:

N[ iga c5000334 1 870910Y P

pp c

Worcester Tech Specs 3

x.

\\

'I (1) startup channel, background to'10-2%, full power, i.e.,Taackground to 1 W.

-(2) log-N period channel: 2 x 10 % to 150% full power; i.e.., 0.2 W.to 13 kW (3) Linear safety channels 1 aad 2; 2 x 10~3% to 150% full power; Ne.,

0.2 W to 15 kW 4.5.2 Control Blades m

..There shall be three control blades, tvch consisting of vertical y

aluminum-clad boral blades 10.5 in. wid2 x 40.5 in. long x 0.375 in thick.

4.5.3 Regulating Blade t

m There shall be one regulating blade consisting of 'a vertical stainir.ss-steel blade 10.65 in wide x 40.51r,. long x 0.125 in. thick.

1,l y.

4.5.4 Blade Position I'ndicators The blade position indicator on tne consolec shall provide an indication of the blade position to within +.02 dn. ' Signal lights shall be proviced for each control blade drive and for the regulating; blade to indicate the upper and lower limits of travel and, in the case of control blades, an armatcre engaged by a magnet.

l l

1 l

s f

C l

1

)

9 Worcester Tech Specs

n---~,;-.

.(

/.

i s

\\

h p

Q s

a r

<r '

m enC3.4 s

e M

tb, u>

4

a y

YE.

I k

1 4

1

-l l

1 1

i f

1 I

e l

l i

I

""