ML20212H617: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:s                                                                                                               i
{{#Wiki_filter:s i
  , e,             1.       -                                                                                  l A                                                                                     TS 5.6.5.d v
l e,
        ,PECO NUCLEAR                                                         escocoerove - + "<
1.
965 Chesterbrook Boulevard         1 A Unit of PECO Energy                                             ' Wayne. PA 19 % 7 5691 September 24,1999 Docket No. 50-277 l
A TS 5.6.5.d v
l I
,PECO NUCLEAR escocoerov - + "<
License No. DPR-44 U.S. Nuclear Regulatory Commission                                                                     l Attention: Document Control Desk                                                                       l Washington DC 20555
e 965 Chesterbrook Boulevard 1'
                                                                                                                  ]
A Unit of PECO Energy
' Wayne. PA 19 % 7 5691 September 24,1999 Docket No. 50-277 License No. DPR-44 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington DC 20555
]


==Subject:==
==Subject:==
Peach Bottom Atomic Power Station, Unit 2 lssuance of the Core Operating Limits Report for Reload 12, Cycle 13, Revision 2 l
Peach Bottom Atomic Power Station, Unit 2 lssuance of the Core Operating Limits Report for Reload 12, Cycle 13, Revision 2


==Dear Sir / Madam:==
==Dear Sir / Madam:==
i Enclosed is a copy of the Core Operating Limits Report (COLR) for Peach Bottom Atomic Power Station (PBAPS), Unit 2, Reload 12, Cycle 13 (Revision 2). Revision 2 of this report incorporates a revised Single Loop Operation MAPLHGR flow multiplier.
i Enclosed is a copy of the Core Operating Limits Report (COLR) for Peach Bottom Atomic Power Station (PBAPS), Unit 2, Reload 12, Cycle 13 (Revision 2). Revision 2 of this report incorporates a revised Single Loop Operation MAPLHGR flow multiplier.
This COLR is being submitted to the NRC in accordance with PBAPS, Unit 2 Technical Specifications (TS) Section 5.6.5.d.
This COLR is being submitted to the NRC in accordance with PBAPS, Unit 2 Technical Specifications (TS) Section 5.6.5.d.
If you have any questions, please do not hesitate to contact uc.
If you have any questions, please do not hesitate to contact uc.
Ve             rs,                                                                                     ,
Ve rs, ames A. Hutton Director - Licensing Enclosure cc:
ames A. Hutton Director - Licensing Enclosure cc:     H. J. Miller, Administrator, Region l', USNRC (w/ Enclosure)
H. J. Miller, Administrator, Region l', USNRC (w/ Enclosure)
A. C. McMurtray, USNRC Senior Resident inspector, PBAPS (w/ Enclosure) l l
A. C. McMurtray, USNRC Senior Resident inspector, PBAPS (w/ Enclosure) l l
                                                                                                          - 0 0I 9910010267 990924 PDR' ADOCA 05000277
0I 0
        'P                       PDR L
9910010267 990924 PDR' ADOCA 05000277
i
'P PDR L
--                                                                                                              J}}
i J}}

Latest revision as of 06:00, 4 December 2024

Forwards Rev 2 to COLR for Pbaps,Unit 2,Reload 12,Cycle 13, IAW TS Section 5.6.5.d.Rept Incorporates Revised Single Loop Operation MAPLHGR Flow Multiplier
ML20212H617
Person / Time
Site: Peach Bottom 
Issue date: 09/24/1999
From: Hutton J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20212H620 List:
References
NUDOCS 9910010267
Download: ML20212H617 (1)


Text

s i

l e,

1.

A TS 5.6.5.d v

,PECO NUCLEAR escocoerov - + "<

e 965 Chesterbrook Boulevard 1'

A Unit of PECO Energy

' Wayne. PA 19 % 7 5691 September 24,1999 Docket No. 50-277 License No. DPR-44 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington DC 20555

]

Subject:

Peach Bottom Atomic Power Station, Unit 2 lssuance of the Core Operating Limits Report for Reload 12, Cycle 13, Revision 2

Dear Sir / Madam:

i Enclosed is a copy of the Core Operating Limits Report (COLR) for Peach Bottom Atomic Power Station (PBAPS), Unit 2, Reload 12, Cycle 13 (Revision 2). Revision 2 of this report incorporates a revised Single Loop Operation MAPLHGR flow multiplier.

This COLR is being submitted to the NRC in accordance with PBAPS, Unit 2 Technical Specifications (TS) Section 5.6.5.d.

If you have any questions, please do not hesitate to contact uc.

Ve rs, ames A. Hutton Director - Licensing Enclosure cc:

H. J. Miller, Administrator, Region l', USNRC (w/ Enclosure)

A. C. McMurtray, USNRC Senior Resident inspector, PBAPS (w/ Enclosure) l l

0I 0

9910010267 990924 PDR' ADOCA 05000277

'P PDR L

i J