ENS 55020: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 22: Line 22:
The cause of the 4KV Bus 11 Feeder Breaker opening is unknown at the present time and is under investigation.
The cause of the 4KV Bus 11 Feeder Breaker opening is unknown at the present time and is under investigation.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20201204en.html#en55020
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20201204en.html#en55020
}}{{unit info
| Unit = 1
| type = CE
| Scram code = N
| Reactor critical = Y
| Initial power = 100
| Initial reactor mode = Power Operation
| Current power = 100
| Current reactor mode = Power Operation
}}
}}


{{ENS-Nav}}[[Category:Power Reactor]]
{{ENS-Nav}}[[Category:Power Reactor]]

Revision as of 11:57, 15 January 2021

ENS 55020 +/-
Where
Calvert Cliffs Constellation icon.png
Maryland (NRC Region 1)
Reporting
10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+2.78 h0.116 days <br />0.0165 weeks <br />0.00381 months <br />)
Opened: Britain Foster
17:10 Dec 3, 2020
NRC Officer: Donald Norwood
Last Updated: Dec 3, 2020
55020 - NRC Website
Loading map...