Q bSMUD SACAAMeNTO MUN4CIPAL UTIUTY 068TmCT C P. O. Box 15830. Sectarrento CA 95852 1830.1916) 452 3211 AN ELECTrlC SYSTEM SERVING THE HEART 05 CALIFORNIA AGM/NPP 88-542 i
Q bSMUD SACAAMeNTO MUN4CIPAL UTIUTY 068TmCT C P. O. Box 15830. Sectarrento CA 95852 1830.1916) 452 3211 AN ELECTrlC SYSTEM SERVING THE HEART 05 CALIFORNIA AGM/NPP 88-542 i
October 12, 1988 U. O. Nuclear Regulatory Commission Attn:   J. B. Martin, Regional Administrator Region V 1450 Maria Lane, Suite 210                                                                               :
October 12, 1988 U. O. Nuclear Regulatory Commission Attn:
Walnut Creek, CA 94596 l
J. B. Martin, Regional Administrator Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596 l
i Docket No. 50-312                                                                                       i Rancho Jaco Nuclear Generating Station                                                                   !
i Docket No. 50-312 i
License No. OPR-54                                                                                       i SPECIAL REPORT NUMBER 88-16:     POST ACCIDENT SAMPLING SYSTEM INOPERABLE MORE                           :
Rancho Jaco Nuclear Generating Station License No. OPR-54 i
THAN 72 HOURS                                                                                           !
SPECIAL REPORT NUMBER 88-16:
i
POST ACCIDENT SAMPLING SYSTEM INOPERABLE MORE THAN 72 HOURS i


==Dear Mr. Martin:==
==Dear Mr. Martin:==
l
l
                                              \                                                                         i
\\
)             The Post Accident Sampling System was not restored to operable status within t            the 72 hours specified in administrative controls in support of Rancho Seco                             !
)
7             Technical Specification 6.18. The Sacramento Municipal Utility Olstrict J             hereby submits Special Report No. 88-16 in accordance with Rancho Seco                                   i administrative controls.                                                                                 ,
The Post Accident Sampling System was not restored to operable status within i
Members of your staff with questions requiring additional information or                                 f
the 72 hours specified in administrative controls in support of Rancho Seco t
,              clarification may contact Mr. Robert Fraser at (209) 333-2935, extension 4364.
7 Technical Specification 6.18.
l Sincerely, n          _.OO                                                                                     ,
The Sacramento Municipal Utility Olstrict J
Dan R. Keuter Assistant General Manager Nuglear Power Production                                                           -
hereby submits Special Report No. 88-16 in accordance with Rancho Seco i
Attachment                                                                 ,
administrative controls.
cc w/atch: Document Control Desk, Washington OC                                             -
Members of your staff with questions requiring additional information or f
A. D'Angelo NRC, Rancho Seco
clarification may contact Mr. Robert Fraser at (209) 333-2935, extension 4364.
l Sincerely,
_.OO n
Dan R. Keuter Assistant General Manager Nuglear Power Production Attachment cc w/atch: Document Control Desk, Washington OC A. D'Angelo NRC, Rancho Seco
^
^
                                          ;Q seiot90259 831012         i                                                                     '
;Q seiot90259 831012 i
J,             gDR ADOCK0500gg2             ,
J, gDR ADOCK0500gg2 g
g
RANCHO SECo NUCLEAR GENERATING STATION O 1444o Two Cities Soad. Hertid. CA 95638 9799:1209) 333 2935
      . RANCHO SECo NUCLEAR GENERATING STATION O 1444o Two Cities Soad. Hertid. CA 95638 9799:1209) 333 2935


        ,                                    SPECIAL REPORT NUMBER (4 16 Post Accident Sampling System Inoperable More Than 72 Hours Date of Occurrence September 18, 1988 Plant Conditions at Time of Occurrence The plant was operating at approximately 92% power on September 18, 1988.
SPECIAL REPORT NUMBER (4 16 Post Accident Sampling System Inoperable More Than 72 Hours Date of Occurrence September 18, 1988 Plant Conditions at Time of Occurrence The plant was operating at approximately 92% power on September 18, 1988.
l           Jdentif tatiga of Occurttatt The Post Accident Sampling System was not returned to operable status within 72 hours as required by Rancho Seco Administrative Procedure RSAP-0219.
l Jdentif tatiga of Occurttatt The Post Accident Sampling System was not returned to operable status within 72 hours as required by Rancho Seco Administrative Procedure RSAP-0219.
Descriotion of Occurrence On September 15, 1988, a work clearance was issued to allow removal of Pressure Control Valve PCV-70022 for maintenance. PCV-70022 provides pressure control for the Post Accident Sampling System dilution / flush water from the Miscellaneous Water Holdup Tank T-993. To isolate PCV-70022 clearance tags were placed on additional vgives which disabled the flow path for the backup dilution / flush water from Chilled Hater Tank T-496. Without a source of       -
Descriotion of Occurrence On September 15, 1988, a work clearance was issued to allow removal of Pressure Control Valve PCV-70022 for maintenance.
dilution / flush water the system became inoperable.
PCV-70022 provides pressure control for the Post Accident Sampling System dilution / flush water from the Miscellaneous Water Holdup Tank T-993.
Corrective Action Taken On September 30. 1988, backup dilution / flush water capability from T-496 was restored to return the system to operable status. Restoration of the normal dilution / flush water capability from T-993 will be accomplished on receipt of parts for rework of PCV-70022.
To isolate PCV-70022 clearance tags were placed on additional vgives which disabled the flow path for the backup dilution / flush water from Chilled Hater Tank T-496. Without a source of dilution / flush water the system became inoperable.
Corrective Action Taken On September 30. 1988, backup dilution / flush water capability from T-496 was restored to return the system to operable status.
Restoration of the normal dilution / flush water capability from T-993 will be accomplished on receipt of parts for rework of PCV-70022.
O
O
                                +
+
e e
e e
4 e
4 e
9                     9
9 9
                                                      ~                         '
(
(                                          .                                  .    .}}
~
.}}

Latest revision as of 20:10, 6 December 2024

Special Rept 88-16:on 880918,PASS Inoperable More than 72 H. Caused by Clearance Tags Placed on Addl Valves to Disable Flow Path for Backup Dilution/Flush Water from Chilled Water Tank.Sys Returned to Operable Svc
ML20207N604
Person / Time
Site: Rancho Seco
Issue date: 10/12/1988
From: Keuter D
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
88-16, AGM-NPP-88-542, NUDOCS 8810190249
Download: ML20207N604 (2)


Text

-

Q bSMUD SACAAMeNTO MUN4CIPAL UTIUTY 068TmCT C P. O. Box 15830. Sectarrento CA 95852 1830.1916) 452 3211 AN ELECTrlC SYSTEM SERVING THE HEART 05 CALIFORNIA AGM/NPP 88-542 i

October 12, 1988 U. O. Nuclear Regulatory Commission Attn:

J. B. Martin, Regional Administrator Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596 l

i Docket No. 50-312 i

Rancho Jaco Nuclear Generating Station License No. OPR-54 i

SPECIAL REPORT NUMBER 88-16:

POST ACCIDENT SAMPLING SYSTEM INOPERABLE MORE THAN 72 HOURS i

Dear Mr. Martin:

l

\\

)

The Post Accident Sampling System was not restored to operable status within i

the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> specified in administrative controls in support of Rancho Seco t

7 Technical Specification 6.18.

The Sacramento Municipal Utility Olstrict J

hereby submits Special Report No. 88-16 in accordance with Rancho Seco i

administrative controls.

Members of your staff with questions requiring additional information or f

clarification may contact Mr. Robert Fraser at (209) 333-2935, extension 4364.

l Sincerely,

_.OO n

Dan R. Keuter Assistant General Manager Nuglear Power Production Attachment cc w/atch: Document Control Desk, Washington OC A. D'Angelo NRC, Rancho Seco

^

Q seiot90259 831012 i

J, gDR ADOCK0500gg2 g

RANCHO SECo NUCLEAR GENERATING STATION O 1444o Two Cities Soad. Hertid. CA 95638 9799:1209) 333 2935

SPECIAL REPORT NUMBER (4 16 Post Accident Sampling System Inoperable More Than 72 Hours Date of Occurrence September 18, 1988 Plant Conditions at Time of Occurrence The plant was operating at approximately 92% power on September 18, 1988.

l Jdentif tatiga of Occurttatt The Post Accident Sampling System was not returned to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> as required by Rancho Seco Administrative Procedure RSAP-0219.

Descriotion of Occurrence On September 15, 1988, a work clearance was issued to allow removal of Pressure Control Valve PCV-70022 for maintenance.

PCV-70022 provides pressure control for the Post Accident Sampling System dilution / flush water from the Miscellaneous Water Holdup Tank T-993.

To isolate PCV-70022 clearance tags were placed on additional vgives which disabled the flow path for the backup dilution / flush water from Chilled Hater Tank T-496. Without a source of dilution / flush water the system became inoperable.

Corrective Action Taken On September 30. 1988, backup dilution / flush water capability from T-496 was restored to return the system to operable status.

Restoration of the normal dilution / flush water capability from T-993 will be accomplished on receipt of parts for rework of PCV-70022.