ML20207T190: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:_
{{#Wiki_filter:-
_
kC)(d
*D
.
B
4 1997
,,
.
Docket Nos. 50-369, 50-370
License Nos. NPF-9, NPF-17
Du e Power Company
TN: Mr. H. B. Tucker, Vice President
'
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRCINSPECTIONREPORTNOS. 50-369/87-01 AND 50-370/87-01)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
G. B. Kuzo on January 5-9, 1987.
The inspection included a review of activities
authorized for your McGuire Nuclear Station facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspector also conducted independent measurements, in the
Region II Mobile Laboratory at your site, to verify your capability for analyzing
radioactive effluents and to establish and maintain standardized methodology
among regulated facilities and the NRC.
The inspection findings indicate that certain activities appeared to violate NRC
requirements.
The violation, references to pertinent requirements, and elements
to be included in your response are described in the enclosed Notice of
Violation.
;
In accordance with Section 2.790 of the URC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
:
9
7
?
8703230295 870224
ADOCK0500g9
PDR
l$
M d/
__._ .._ -._.
_
.-
-
-
                                                                              kC)(d
-
  .    *D
._ .
                                                  B      4 1997
.,
                    ,,
__
              .
.
      Docket Nos. 50-369, 50-370
      License Nos. NPF-9, NPF-17
      Du e Power Company
        TN: Mr. H. B. Tucker, Vice President
              Nuclear Production Department
          '
      422 South Church Street
      Charlotte, NC 28242
      Gentlemen:
      SUBJECT: NOTICE OF VIOLATION
                  (NRCINSPECTIONREPORTNOS. 50-369/87-01 AND 50-370/87-01)
      This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
      G. B. Kuzo on January 5-9, 1987. The inspection included a review of activities
      authorized for your McGuire Nuclear Station facility. At the conclusion of the
      inspection, the findings were discussed with those members of your staff
      identified in the enclosed inspection report.
      Areas examined during the inspection are identified in the report. Within these
      areas, the inspection consisted of selective examinations of procedures and
      representative records, interviews with personnel, and observation of activities
      in progress. The inspector also conducted independent measurements, in the
      Region II Mobile Laboratory at your site, to verify your capability for analyzing
      radioactive effluents and to establish and maintain standardized methodology
      among regulated facilities and the NRC.
      The inspection findings indicate that certain activities appeared to violate NRC
      requirements. The violation, references to pertinent requirements, and elements
      to be included in your response are described in the enclosed Notice of
      Violation.                                      ;
      In accordance with Section 2.790 of the URC's " Rules of Practice," Part 2,
      Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
      will be placed in the NRC Public Document Room.
      The responses directed by this letter and its enclosures are not subject to the
      clearance procedures of the Office of Management and Budget as required by the
      Paperwork Reduction Act of 1980, PL 96-511.
                                        :
    9
    7
    ?
                      8703230295 870224
                      PDR            ADOCK0500g9
                                                                                      l$
                        __._ .._ -._.    .  _
                                                    .-          -    -
                                                                        ._ .    .,
                                                                                    M d/  __


                                                                                  -
-
t, . ..   -e
t, .
.                     .
-e
        Duke Power Company                   2
..
        Should you have any questions concerning this letter, please contact us.
.
                                              Sincerely,
.
                                              Original Signed by
Duke Power Company
                                              Luis A. Reyes
2
                                              Luis A. Reyes, Acting Director
Should you have any questions concerning this letter, please contact us.
                                              Division of Reactor Projects
Sincerely,
        Enclosures:
Original Signed by
        1.   Notice of Violation
Luis A. Reyes
        2.   Inspection Report
Luis A. Reyes, Acting Director
        cc w/encls:
Division of Reactor Projects
        y L. McConnell, Station Manager
Enclosures:
        .b   w/encls:
1.
          3C Resident Inspector
Notice of Violation
        (E. Hood, NRR
2.
        Document Control Desk
Inspection Report
        State of North Carolina
cc w/encls:
        RII               RII                     RII         RI       RII
y L. McConnell, Station Manager
    RY{Kuzo                 Kah e   DCollins       JP tohr     TPeebles VBrownlee
.b
        1/3/87             1/Jf/87 1ry/87       O/23/87     1/3 /87 1/2.5/87
w/encls:
          -     -       ._            -
3C Resident Inspector
(E. Hood, NRR
Document Control Desk
State of North Carolina
RII
RII
RII
RI
RII
RY{Kuzo
Kah e
DCollins
JP tohr
TPeebles VBrownlee
1/3/87
1/Jf/87
1ry/87
O/23/87
1/3 /87
1/2.5/87
-
-
.
-
}}
}}

Latest revision as of 19:06, 6 December 2024

Forwards Insp Repts 50-369/87-01 & 50-370/87-01 on 870105-09 & Notice of Violation
ML20207T190
Person / Time
Site: McGuire, Mcguire  
Issue date: 02/24/1987
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20207T191 List:
References
NUDOCS 8703230295
Download: ML20207T190 (2)


See also: IR 05000369/1987001

Text

-

_

kC)(d

  • D

.

B

4 1997

,,

.

Docket Nos. 50-369, 50-370

License Nos. NPF-9, NPF-17

Du e Power Company

TN: Mr. H. B. Tucker, Vice President

'

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRCINSPECTIONREPORTNOS. 50-369/87-01 AND 50-370/87-01)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

G. B. Kuzo on January 5-9, 1987.

The inspection included a review of activities

authorized for your McGuire Nuclear Station facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspector also conducted independent measurements, in the

Region II Mobile Laboratory at your site, to verify your capability for analyzing

radioactive effluents and to establish and maintain standardized methodology

among regulated facilities and the NRC.

The inspection findings indicate that certain activities appeared to violate NRC

requirements.

The violation, references to pertinent requirements, and elements

to be included in your response are described in the enclosed Notice of

Violation.

In accordance with Section 2.790 of the URC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

9

7

?

8703230295 870224

ADOCK0500g9

PDR

l$

M d/

__._ .._ -._.

_

.-

-

-

._ .

.,

__

.

-

t, .

-e

..

.

.

Duke Power Company

2

Should you have any questions concerning this letter, please contact us.

Sincerely,

Original Signed by

Luis A. Reyes

Luis A. Reyes, Acting Director

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

Inspection Report

cc w/encls:

y L. McConnell, Station Manager

.b

w/encls:

3C Resident Inspector

(E. Hood, NRR

Document Control Desk

State of North Carolina

RII

RII

RII

RI

RII

RY{Kuzo

Kah e

DCollins

JP tohr

TPeebles VBrownlee

1/3/87

1/Jf/87

1ry/87

O/23/87

1/3 /87

1/2.5/87

-

-

.

-