ML20065A856: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:i Docket No. 50-44-7 | {{#Wiki_filter:i Docket No. 50-44-7 O | ||
M #, M i, D I 50.55(e)_ Report gy &'EO s | |||
gy &'EO | 4 f | ||
W& | SSN W& | ||
August 31, 1982 l.NPP -21746-GHD' | $hNSS Hl l7~ 'f Q STA. | ||
"1001 P.o. Box 21666 PHOEN'X, ARI2oNA 85036 | |||
^ | |||
August 31, 1982 l.NPP -21746-GHD' B'SK | |||
/ | |||
U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria' Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: | |||
Mr. D. M. Sternberg, Chief Reactor Projects Branch | |||
==Subject:== | ==Subject:== | ||
| Line 26: | Line 32: | ||
==Reference:== | ==Reference:== | ||
(A) | (A) | ||
Telephone Conversation between J. Eckhardt and B. S. Kaplan on May 29, 1981 (B) ANPP-18271, dated June 24, 1981 (Interim Report) | |||
(C) ANPP-19693, dated December 14, 1981 (Extension) | (C) ANPP-19693, dated December 14, 1981 (Extension) | ||
(D) Telephone Conversation between Bob Dodds and George Duckworth on January 5, 1982 (Extension) | (D) Telephone Conversation between Bob Dodds and George Duckworth on January 5, 1982 (Extension) | ||
| Line 33: | Line 40: | ||
==Dear Sir:== | ==Dear Sir:== | ||
The NRC was notified of a potentially reportable deficiency in References (A) and (B), and revised Interim Reports were transmitted by References (E) and (F). At that time, it was estimated that a Final Report would be available by August 31, 1982. | The NRC was notified of a potentially reportable deficiency in References (A) and (B), and revised Interim Reports were transmitted by References (E) and (F). At that time, it was estimated that a Final Report would be available by August 31, 1982. | ||
Due to the extensive investigation and evaluation required, it is now expected that a Final Report, including reports fram Teledyne Engineering Services and Battelle Pacific Northwest Laboratories, will be submitted by October 22, 1982. | Due to the extensive investigation and evaluation required, it is now expected that a Final Report, including reports fram Teledyne Engineering Services and Battelle Pacific Northwest Laboratories, will be submitted by October 22, 1982. | ||
Very truly yours, l | Very truly yours, l | ||
N ALL ctQ E. E. | |||
APS Vice President Nuclear Projects Management ANPP Project Director EEVBJr/GHD:db | Van Brunt, Jr. | ||
cc: | APS Vice President Nuclear Projects Management ANPP Project Director EEVBJr/GHD:db cc: | ||
See Attached Page 2 | |||
,e 8209140144 820831 PDR ADOCK 05000528 S | |||
PDR | |||
U. S. Nuclear Regulatory Commission | U. S. Nuclear Regulatory Commission August 31, 1982 Attention: | ||
Mr. D. M. Sternberg, Chief ANPP-21746-GHD/BSK Page 2 cc: Richard DeYoung, Director Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. C. Woods, Jr. | |||
J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorces J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli Lynne Bernabei, Esq. | J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorces J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli Lynne Bernabei, Esq. | ||
Harmon & Weiss 1725 "1" Street, NW Suite 506 Washington, D. C. 20006 | Harmon & Weiss 1725 "1" Street, NW Suite 506 Washington, D. C. 20006 | ||
: k. L. Greenfield As sistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 | : k. L. Greenfield As sistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 | ||
_ _ - _ - _ _ - -}} | _ _ - _ - _ _ - -}} | ||
Latest revision as of 20:07, 16 December 2024
| ML20065A856 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/31/1982 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Sternberg D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, ANPP-21746-GHD, NUDOCS 8209140144 | |
| Download: ML20065A856 (2) | |
Text
i Docket No. 50-44-7 O
M #, M i, D I 50.55(e)_ Report gy &'EO s
4 f
SSN W&
$hNSS Hl l7~ 'f Q STA.
"1001 P.o. Box 21666 PHOEN'X, ARI2oNA 85036
^
August 31, 1982 l.NPP -21746-GHD' B'SK
/
U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria' Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:
Mr. D. M. Sternberg, Chief Reactor Projects Branch
Subject:
Time Extension For Report - DER 81-14 A 50.55(e) Potentially Reportable Deficiency Relating to A-354 Anchor Bolt Failures File: 82-019-026 D.4.33.2
Reference:
(A)
Telephone Conversation between J. Eckhardt and B. S. Kaplan on May 29, 1981 (B) ANPP-18271, dated June 24, 1981 (Interim Report)
(C) ANPP-19693, dated December 14, 1981 (Extension)
(D) Telephone Conversation between Bob Dodds and George Duckworth on January 5, 1982 (Extension)
(E) ANPP-19871, dated January 11, 1982 (Interim Rev. 1)
(F) ANPP-21181, dated June 15, 1982 (Interim Rev. 2)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in References (A) and (B), and revised Interim Reports were transmitted by References (E) and (F). At that time, it was estimated that a Final Report would be available by August 31, 1982.
Due to the extensive investigation and evaluation required, it is now expected that a Final Report, including reports fram Teledyne Engineering Services and Battelle Pacific Northwest Laboratories, will be submitted by October 22, 1982.
Very truly yours, l
N ALL ctQ E. E.
Van Brunt, Jr.
APS Vice President Nuclear Projects Management ANPP Project Director EEVBJr/GHD:db cc:
See Attached Page 2
,e 8209140144 820831 PDR ADOCK 05000528 S
U. S. Nuclear Regulatory Commission August 31, 1982 Attention:
Mr. D. M. Sternberg, Chief ANPP-21746-GHD/BSK Page 2 cc: Richard DeYoung, Director Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. C. Woods, Jr.
J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorces J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli Lynne Bernabei, Esq.
Harmon & Weiss 1725 "1" Street, NW Suite 506 Washington, D. C. 20006
- k. L. Greenfield As sistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503
_ _ - _ - _ _ - -