4 Arizona Nuclear Power Project P.o. box 52034 e PHOENIX, ARIZONA 85072-2034 | 4 Arizona Nuclear Power Project | ||
[3 g? | |||
ph P.o. box 52034 e PHOENIX, ARIZONA 85072-2034 9 | |||
t C | |||
April 17, 1986 Q | |||
ANPP-36527-EEVB/LAS/DRIls92.11Q. | ANPP-36527-EEVB/LAS/DRIls92.11Q. | ||
U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 9h596-5368 Attention: | U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 9h596-5368 Attention: | ||
Mr. D. F. Kirsch, Actind Director Division of Reactor Parety and Projects Palo Verde Nuclear Generating Station (PVNGS) | |||
Unit 1, 2, 3 Docket No. 50/528, 529, 530 | Unit 1, 2, 3 Docket No. 50/528, 529, 530 | ||
| Line 34: | Line 37: | ||
==Dear Sir:== | ==Dear Sir:== | ||
The NRC was notified of a potentially reportable deficiency by reference (A) and additional information was furnished to NRR, with a copy to the Region V Resident Inspector by references (B) and (C). | The NRC was notified of a potentially reportable deficiency by reference (A) and additional information was furnished to NRR, with a copy to the Region V Resident Inspector by references (B) and (C). | ||
Due to the extensive investigation and evalustion required, it is now expected that this information will be finalized by May 28, 1986, at which time the com-plete report will be submitted. | Due to the extensive investigation and evalustion required, it is now expected that this information will be finalized by May 28, 1986, at which time the com-plete report will be submitted. | ||
Very truly yours, gwn @%r | Very truly yours, gwn @%r EE{&e5" Nit & | ||
j g | |||
E. E. Van Brunt, Jr. | E. E. Van Brunt, Jr. | ||
Executive Vice President Project Director EEVB/DRL/pgk cc: See Page 2 Ile IEx | |||
IEx | |||
.3 1 | |||
~+ | |||
+ | |||
DER 86 Interim Report-Hr. D. F. Kirsch Acting Director | g DER 86 Interim Report-Hr. D. F. Kirsch Acting Director | ||
~g ANPP-36257-EEVB/LAS/DRL-92.11 April 17, 1986 Page 2 l | |||
ANPP-36257-EEVB/LAS/DRL-92.11 April 17, 1986 Page 2 | cc: | ||
J. M. Taylor,- Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 A. C. Gehr (4141) | |||
R. P. Eissnerman '(6295) | R. P. Eissnerman '(6295) | ||
Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 4 | Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 4 | ||
Idf/001/cc86-14 | Idf/001/cc86-14 | ||
,u..-,,~,:-,..,, | |||
...., -}} | |||
Latest revision as of 00:18, 8 December 2024
| ML20203L098 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde, 05000539 |
| Issue date: | 04/17/1986 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-36527-EEVB, DER-86-14, NUDOCS 8605010134 | |
| Download: ML20203L098 (2) | |
Text
-
=
4 Arizona Nuclear Power Project
[3 g?
ph P.o. box 52034 e PHOENIX, ARIZONA 85072-2034 9
t C
April 17, 1986 Q
ANPP-36527-EEVB/LAS/DRIls92.11Q.
U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 9h596-5368 Attention:
Mr. D. F. Kirsch, Actind Director Division of Reactor Parety and Projects Palo Verde Nuclear Generating Station (PVNGS)
Unit 1, 2, 3 Docket No. 50/528, 529, 530
Subject:
Interim Report - DER 86-14 A 50.55(e) Pctentially Reportable Deficiency Relating to Weld Failure on Pipe Support Structure File: 86-006-216; 86-026-056; D.h.33.2
Reference:
(A) Telephone Conversation between A. Toth and D. R. Larkin on March 20, 1986 (Initial Reportability - DER 86-1h)
(B) ANPP-36021, dated April 9, 1986 (Report on Pipe Support Failure, Revision 1)
(C) ANPP-36154, dated April 16, 1986 (Report on Pipe Support Failure, Revision 2)
Dear Sir:
The NRC was notified of a potentially reportable deficiency by reference (A) and additional information was furnished to NRR, with a copy to the Region V Resident Inspector by references (B) and (C).
Due to the extensive investigation and evalustion required, it is now expected that this information will be finalized by May 28, 1986, at which time the com-plete report will be submitted.
Very truly yours, gwn @%r EE{&e5" Nit &
j g
E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/DRL/pgk cc: See Page 2 Ile IEx
.3 1
~+
+
g DER 86 Interim Report-Hr. D. F. Kirsch Acting Director
~g ANPP-36257-EEVB/LAS/DRL-92.11 April 17, 1986 Page 2 l
cc:
J. M. Taylor,- Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 A. C. Gehr (4141)
R. P. Eissnerman '(6295)
Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 4
Idf/001/cc86-14