ML20207C944: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
NRC MONTHLY OPERATING REPORT DOCKET NO. 50-362 UNIT NAME SONGS - 3 DATE As Revised May COMPLETED BY   E. R. Siacor ~ 14. 1986 TELEPHONE [714)368-6223 OPERATING STATUS
NRC MONTHLY OPERATING REPORT DOCKET NO. 50-362 UNIT NAME SONGS - 3 DATE As Revised May COMPLETED BY E. R. Siacor ~ 14. 1986 TELEPHONE [714)368-6223 OPERATING STATUS 1.
: 1. Unit Name:   San Onofre Nuclear Generating Station, Unit 3
Unit Name:
: 2. Reporting Period:     March 1986
San Onofre Nuclear Generating Station, Unit 3 2.
: 3. Licensed Thermal Power (MWt):                     3390
Reporting Period:
: 4. Nameplate Rating (Gross MWe):                     1127
March 1986 3.
: 5. Design Electrical Rating (Net MWe):               1080
Licensed Thermal Power (MWt):
: 6. Maximum Dependable Capacity (Gross MWe):         1127
3390 4.
: 7. Maximum Dependable Capacity (Net MWe):           1080
Nameplate Rating (Gross MWe):
: 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
1127 5.
Design Electrical Rating (Net MWe):
1080 6.
Maximum Dependable Capacity (Gross MWe):
1127 7.
Maximum Dependable Capacity (Net MWe):
1080 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
Since Last Report, Give Reasons:
NA
NA 9.
: 9. Power Level To Which Restricted, If Any (Net MWe):               NA
Power Level To Which Restricted, If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:                               NA This Month     Yr.-to-Date       Cumulative
NA 10.
: 11. Hours In Reporting Period                 _
Reasons For Restrictions, If Any:
744.00         2,160.00     17,520.00
NA This Month Yr.-to-Date Cumulative 11.
: 12. Number Of Hours Reactor Was Critical             370.85        1,401.91      10,612.00
Hours In Reporting Period 370.85 1,401.91 10,612.00 744.00 2,160.00 17,520.00 12.
: 13. Reactor Reserve Shutdown Hours                     0                 0               0
Number Of Hours Reactor Was Critical 13.
: 14. Hours Generator On-Line                           324.87         1,099.81       9,915.26
Reactor Reserve Shutdown Hours 0
: 15. Unit Reserve Shutdown Hours                         0                 0               0
0 0
: 16. Gross Thermal Energy Generated (MWH)       1,060,286.72 3,149,256.00 28,294,443.34         ,
14.
: 17. Gross Electrical Energy Generated (MWH)     358,700.50 1,037,361.00       9,408,766.00
Hours Generator On-Line 324.87 1,099.81 9,915.26 15.
: 18. Net Electrical Energy Generated (MWH)       332,137.00     947,521.00     8,754,866.42
Unit Reserve Shutdown Hours 0
: 19. Unit Service Factor                               43.67%           50.92%         56.59%
0 0
: 20. Unit Availability Factor                         43.67%           50.92%         56.59%
16.
: 21. Unit Capacity Factor (Using MDC Net)             41.34%           40.62%         46.27%
Gross Thermal Energy Generated (MWH) 1,060,286.72 3,149,256.00 28,294,443.34 17.
: 22. Unit Capacity Factor (Using DER Net)             41.34%           40.62%         46.27%
Gross Electrical Energy Generated (MWH) 358,700.50 1,037,361.00 9,408,766.00 18.
: 23. Unit Forced Outage Rate                           56.33%*           40.04%*         18.05%*
Net Electrical Energy Generated (MWH) 332,137.00 947,521.00 8,754,866.42 19.
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Unit Service Factor 43.67%
NA
50.92%
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:             NA
56.59%
: 26. Units In Test Status (Prior To Commercial Operation):           Forecast   Achieved INITIAL CRITICALITY                                 NA         NA INITIAL ELECTRICITY                                 NA         NA COMMERCIAL OPERATION                                 NA         NA
20.
* Corrected figures for March 1986 report           )
Unit Availability Factor 43.67%
7435u 8607210458 860514 PDR R    ADOCK 05000361 PDR                 -
50.92%
l}}
56.59%
21.
Unit Capacity Factor (Using MDC Net) 41.34%
40.62%
46.27%
22.
Unit Capacity Factor (Using DER Net) 41.34%
40.62%
46.27%
23.
Unit Forced Outage Rate 56.33%*
40.04%*
18.05%*
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
NA 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
NA 26.
Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA
* Corrected figures for March 1986 report 8607210458 860514 7435u PDR ADOCK 05000361 R
PDR l}}

Latest revision as of 22:14, 6 December 2024

Revised Monthly Operating Rept for Mar 1986,changing unit-forced Outage Rate
ML20207C944
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/31/1986
From: Siacor E
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20207C934 List:
References
7435U, NUDOCS 8607210458
Download: ML20207C944 (1)


Text

.

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-362 UNIT NAME SONGS - 3 DATE As Revised May COMPLETED BY E. R. Siacor ~ 14. 1986 TELEPHONE [714)368-6223 OPERATING STATUS 1.

Unit Name:

San Onofre Nuclear Generating Station, Unit 3 2.

Reporting Period:

March 1986 3.

Licensed Thermal Power (MWt):

3390 4.

Nameplate Rating (Gross MWe):

1127 5.

Design Electrical Rating (Net MWe):

1080 6.

Maximum Dependable Capacity (Gross MWe):

1127 7.

Maximum Dependable Capacity (Net MWe):

1080 8.

If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

NA 9.

Power Level To Which Restricted, If Any (Net MWe):

NA 10.

Reasons For Restrictions, If Any:

NA This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 370.85 1,401.91 10,612.00 744.00 2,160.00 17,520.00 12.

Number Of Hours Reactor Was Critical 13.

Reactor Reserve Shutdown Hours 0

0 0

14.

Hours Generator On-Line 324.87 1,099.81 9,915.26 15.

Unit Reserve Shutdown Hours 0

0 0

16.

Gross Thermal Energy Generated (MWH) 1,060,286.72 3,149,256.00 28,294,443.34 17.

Gross Electrical Energy Generated (MWH) 358,700.50 1,037,361.00 9,408,766.00 18.

Net Electrical Energy Generated (MWH) 332,137.00 947,521.00 8,754,866.42 19.

Unit Service Factor 43.67%

50.92%

56.59%

20.

Unit Availability Factor 43.67%

50.92%

56.59%

21.

Unit Capacity Factor (Using MDC Net) 41.34%

40.62%

46.27%

22.

Unit Capacity Factor (Using DER Net) 41.34%

40.62%

46.27%

23.

Unit Forced Outage Rate 56.33%*

40.04%*

18.05%*

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

NA 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

NA 26.

Units In Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA

  • Corrected figures for March 1986 report 8607210458 860514 7435u PDR ADOCK 05000361 R

PDR l