NRC MONTHLY OPERATING REPORT DOCKET NO. 50-362 UNIT NAME SONGS - 3 DATE As Revised May COMPLETED BY E. R. Siacor ~ 14. 1986 TELEPHONE [714)368-6223 OPERATING STATUS

1. Unit Name: San Onofre Nuclear Generating Station, Unit 3
2. Reporting Period: March 1986
3. Licensed Thermal Power (MWt): 3390
4. Nameplate Rating (Gross MWe): 1127
5. Design Electrical Rating (Net MWe): 1080
6. Maximum Dependable Capacity (Gross MWe): 1127
7. Maximum Dependable Capacity (Net MWe): 1080
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

NA

9. Power Level To Which Restricted, If Any (Net MWe): NA
10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period _

744.00 2,160.00 17,520.00

12. Number Of Hours Reactor Was Critical 370.85 1,401.91 10,612.00
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 324.87 1,099.81 9,915.26
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1,060,286.72 3,149,256.00 28,294,443.34 ,
17. Gross Electrical Energy Generated (MWH) 358,700.50 1,037,361.00 9,408,766.00
18. Net Electrical Energy Generated (MWH) 332,137.00 947,521.00 8,754,866.42
19. Unit Service Factor 43.67% 50.92% 56.59%
20. Unit Availability Factor 43.67% 50.92% 56.59%
21. Unit Capacity Factor (Using MDC Net) 41.34% 40.62% 46.27%
22. Unit Capacity Factor (Using DER Net) 41.34% 40.62% 46.27%
23. Unit Forced Outage Rate 56.33%* 40.04%* 18.05%*
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

NA

25. If Shut Down At End Of Report Period, Estimated Date of Startup: NA
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA
  • Corrected figures for March 1986 report )

7435u 8607210458 860514 PDR R ADOCK 05000361 PDR -