April 30,,1986 Docket No. 50-333                                  DISTRIBUTION 6 Docket File 1; OELD Mr. John C. Brons                                  NRC PDR        ACRS(10)
Senior Vice President -                            Local PDR      EJordan Nuclear Generation                              Gray File      BGrimes Power Authority of tf.e State                      RBernero      JPartlow of New York                                      SNorris        HSmith 123 Main Street                                    HAbelson      SScott White Plains, New York      10601
 
==Dear Mr. Brons:==
 
The Comptroller General in a Report to the Congress dated September 19, 1984, stated "NRC needs better management controls to ensure implementation of generic issue solutions." To correct this situation, the Nuclear Regulatory Commission is working on a long-term program which will improve its documentation on the status of power reactor licensees' implementation of approved regulatory  !
improvements.
To assist me in developing this information for James A. FitzPatrick Nuclear Power Plant, please review the enclosed plant-specific list, add omitted significant actions to the list, and provide the date that all aspects of each identified requirement were completed / implemented or are expected to be      _
complated. For each requirement that has been completed, enter " completed" under the Status column and the date the item was completed. For requirements that have not been completed / implemented, provide the projected date and enter
      " projected" under the Status column. I do not expect or want a major effort made to obtain precise dates. Rather, I will accept readily-known or best-estimate-dates for actions that have been completely implemented. For example, the year only would be acceptable for completions prior to 1984; the month as well as year is needed for requirements completed after that time. For projected completions / implementations in 1986, use month and year. Use year only for projections thereafter. Please provide a response in the form of a marked up listing by May 31, 1986.
In the future, NRR will need estimated dates prior to issuance cf the safety evaluation so that the estimated schedule may be included in the evaluation.      i This request is covered by OMB Clearance Number 3150-0011, which expires September 30, 1986.
Sincerely, I
(orig s4gned by)                    )
8605090334 860430 PDR    ADOCK 05000333 P                  PDR                        Harvey Abelson, Project Manager BWR Project Directorate #2 Division of BWR Licensing
 
==Enclosure:==
 
As stated DBL:PD#2          DB -  '2            g                                          l S!hfFFTs Ms      HA              DBL:f(e#2 DM)T  r 4/S8/86          4/38/86          4/y0/86 cc w/ enclosure: See next page                                                  ,
l
 
Mr. John C. Brons                        James A. FitzPatrick Nuclear Fcwer Authority of the State of New York  Power Plant cc:
Mr. Charles M. Pratt                    Mr. Jay Dunkleberger Assistant GAneral Counsel                Division of Policy Analysis Power Authority of the State              and Planning of New York                          New York State Energy Office 10 Columbus Circle                      Agency Building 2 New York, New York 10019                Empire State Plaza Albany, New York 12223 Resident Inspector's Office U. S. Nuclear Regulatory Commission ~    Regional Administrator, Region I Post Office Box 136                      U.S. Nuclear Regulatory Commission Lycoming, New York 13093                631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. A. Klausman fir. Radford J. Converse                Vice President - Quality Assurance Resident Manager                        Power Authority of the State James A. FitzPatrick Nuclear              of New York Power Plant                          10 Columbus Circle Post Office Box 41                      New York, New York 10019 Lycoming, New York 13093 Mr. J. A. Gray, Jr.                      Mr. George Wilverding, Chairman Director - Nuclear Licensing - BWR      Safety Review Committee Power Authority of the State            Power Authority of the State        :
of New York                            of New York                      ,
123 Main Street                          123 Main Street White Plains, New York 10601            White Plains, Nev. York 10601  ,
Mr. Robert P. Jones, Supervisor Town of Scriba R. D. #4 Oswego, New York 13126 Mr. Leroy W. Sinclair Power Authority of the State of New York                  '
10 Columbus Circle New York, New York 10019 Mr. M. C. Cosgrove Quality Assurance Superintendent James A. FitzPatrick Nuclear Power Plant                                                              '
Post Office Box 41                                                          ~
Lycoming, New York 13093'
 
1 R-1208731-001                      REGULAT0RY          INF0RMATION                TRACKING      SYSTEH                    PAGE NO. 167
  ~
FACILITY          IMPLEMENTATION                                                03/31/86 FACILITY: FITZPATRICK PLANT LOCATION: 8 MI NE OF OSWEGO, NY                  LICENSED P0HER: 2436 MHT              PROJECT MANAGER: H. ABELSON
,        DOCKET NUMBER: 050-00333                                DESIGN PDHER:    0821 MWE              BRANCH CHIEF:    D. MULLER
    . ARCH / ENGINEER: S8H                                    NSSS VENDOR:    GE                    LIC. ASSISTANT:  S. NORRIS IE INSPECTOR:        L. DOERFLEIN LIC ACT                      LICENSEE TAC NO    MPA 0                      TITLE                                  COMPLETE                STATUS      RAlf M08315    A-01      10 CFR 50.55 A(G) - ISI                                01/31/84C M08045    A-02      APPENDIX I - ALARA                                      05/29/85C
* M06970    A-03      SECURITY REVIENS-MODIFIED AMENDMENT PLANS              01/01/79C
,        M11146    A-04      APPENDIX J - CONTAINMENT LEAK TESTING                  09/15/77C
;        M07917    A-05      GE MARK I CONTAINMENT TECN SPECS-SHORT TERM            06/13/78C M11355    A-09      PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE          04/17/81C                                                      ,
M10416    A-10      CONTINGENCY PLANNING                                    02/28/81C
  . M10419    A-11      GUARD TRAINING PLANS                                    02/28/81C M10414    A-12      VITAL AREA ANALYSIS                                    02/23/79C 4    MI'0780    A-14      10CFR 50.55 A(G) - INSERVICE TESTING                    12/05/83C M13138    A-15      QUALITY ASSURANCE REQUEST REGARDING DIESEL GENARAT      08/07/80C M47526    A-16      QUALIFICATIDMS OF EXAMINATION, INSPECTION, TESTING      08/31/82C M51090    A-17      INSTRUMENTATION 10 FCL*DW THE COURSE OF AN ACCIDEN. 05/15/87 M55709    A-18      TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43)      05/15/86 M52017    A-19      RECOMBINER CAPABILITY BWR MARK I                        06/17/85C H59095    A-20      10 CFR 50.62 OPERATING REACTOR REVIENS                  N//S /
      ""M06508      B-02      FIRE PROTECTION                                        08/01/79C M08218    B-05      STRESS CORROSION CRACKING - BWR RCSPB                  05/01/81C M46661    B-05      STRESS CORROSION CRACKING - BHR RCSPF,                  06/20/84C M08193    B-06      BHR RELIEF VALVE                                        07/01/79C a
a-                                                                                                                                                    i i
 
l 1
R-1208731-001                        REGULAT0RY      INF0RMATION              TRACKING                                                            SYSTEM            PAGE NO.      168 FACILITY            IMPLEMENTATION                                                                                              03/31/86 FITZPATRICK                  (CONTINUATION)
LIC ACT                                                                          LICENSEE TAC NO. MP4_0  ___                  TITLE                            COMPLETE                                                                    STATUS      RAIE
        ~
M12166      B-16  EMERGENCY PLANNING AND REVISIONS                      04/01/81C M08598      B-17  TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS          05/29/85C
        ~
M10299      B-20  CONTAINMENT LEAKAGE DUE To SEAL DETERIORATION          08/25/80C
              'M10361      B-21  LOSS OF 125-V DC BUS VOLTAGE HITH LOSS OF ANNUNCIA    02/28/82C M10756      B-22  TECH SPEC SURVEILLANCE REQUIREMENTS FOR MECHANICAL    05/29/85C M10811      B-22  TECH SPEC SURVEILLANCE REQUIREMENTS FOR MECHANICAL    01/01/70C
!              M11821      B-23  DEGRADED GRID VOLTAGE                                  12/30/79C M42576      B-24  VENTING AND PURGING CONTAINMENTS HHILE AT FULL P0H    07/01/85C                                                                                                        '
        ~
i-              M10179      B-24  VENTING AND PURGING CONTAINMENTS HHILE AT FULL PDH    08/25/80C N08494      B-25  BHR FEEDWATER N0ZZLE CRACKING                          09/30/81C
                                                          ~
e        i      M10885      B-27  REVIEW RESPONSES TO IE BULLETIN 78-03 (OFFGAS EXPL    08/22/79C
          ~
M11075      B-41  FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S    02/28/81C M11738      B-42  TMI FOLLON UP - ALL PLANTS                            04/01/81C M30345      B-44  LESSONS LEARNED IMPLEMENTATION                        03/25/80C M3di46-    B-44  LESSONS LEARNED IMPLEMENTATION                        03/25/80C M30347      B-44  LESSONS LEARNED IMPLEMENTATION                        03/25/80C M30348      B-44  LESSONS LEARNED IMPLEMENTATION                        03/25/80C 4              M30349      B-44  LESSONS LEARNED IMPLEMENTATION                        03/25/30C M30350      B-44  LESSONS LEARNED IMPLEMENTATION                        03/25/80C
            "~M30351        B-44  LESSONS LEARNED IMPLEMENTATION                        03/25/80C M30352      B-44  LESSONS LEARNED IMPLEMENTATION                        03/25/80C M30353      B-44  LESSONS LEARNED IMPLEMENTATION                        03/25/80C M30354      B-44  LESSONS LEARNED IMPLEMENTATION                        03/25/80C
;          I 4
 
I R-1208731-001                  REGULAT0RY          INF9RMATION            TRACKING SYSTEM            PAGE NO. 169 FACILITY        IMPLEMENTATION                                03/31/86 FITZPATRICK              (CONTINUATION)
LIC ACT              LICENSEE IAC NO. MPA 9                TITLE                                COMPLETE        STATUS      Ralg
            ~
M30355    B-44  LESSONS LEARNED IMPLEMENTATION                      03/25/80C M30356    B-44 LESSONS LEARNED IMPLEMENTATION                      03/25/80C
            ~
M12899    B-45 HASH 1400 EVENT V, " PRIMARY COOLANT SYSTEM PRESSUR  08/08/80C M42078    B-46 ANALYSIS OF TURBINE DISC CRACKS                      05/15/80C
              ~
M12710    B-47 ECCS; CLAD SHELLING AND RUPTURE                      04/18/80C M13257    B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE    01/01/70C
            ~
M41093    B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE    07/20/82C M13259    B-55 B80 REPORT DN BHRS                                  01/01/70C
-                      M51025    B-58 SDV CAPABILITY                                      06/24/83C M42881    B-59 MASONRY HALL DESIGN                                  09/17/84C M42489    B-60 ENVIRONMENTAL QUALIFICATION                          03/12/85C M42671    B-61 LOSS OF NON CLASS IE ISC POWER                      07/28/82C M42741    B-62 ESF RESET CONTROL DESIGN DEFICIENCY                  02/22/82C M43934    B-63 INTERIM PROCEDURES FOR SHGRT TERM BLACKOUT          11/30/81C M43T34    B-65 SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN BHR  12/31/85C M51678    B-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82-16)        05/15/86 M52757    B-76 ITEM 1.1 - POST TRIP REVIENs PROGRAM DESCRIPTION &  08/09/85C
* M52838    B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATICN & VENDOR INTER  09/30/86 M52919    B-78 ITEMS 3.1.1 & 3.1.2 -PCST MAINTENANCE TEST FRUCEDU  05/15/86
                  ""M530C0        B-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CHab3ES TO  07/30/85C M54533    B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETT:RS 83-  05/15/86 M55599    B-84 INSPECTIONS OF BHR STAINLESS STEEL PIPINO t.CORDIN  06/06/85C M53589    B-85 SALEM ATHS 1.2 DATA CAPABILITY                      04/15/86 7
e
 
I R-1208731-001                                      REGULAT0RY          INF0RMATION          TRACKING SYSTEM            PAGE NO. 170 FACILITY        IMPLENENTATION                                03/31/86 FITZPATRICK                                  (CONTINUATION)
LIC ACT              LICENSEE TAC No.                      MPA 8                  TITLE                            C_0MP.(11f.      STATUS      RATI
          ~
M53672                        B-86 SALEM ATHS 2.2 S-R COMPONENTS                      01/31/87 M53755                        B-87 SALEM ATHS 3.2.1 & 3.2.2 S-R COMPONENTS            09/30/86
        ~
M53838                        B-88 SALEM ATHS 3.2.3 T.S. 5-R COMPONENTS                07/30/85C M54065                        B-92 SALEM ATHS 4.5.) DIVERSE TRIP FEATURES              05/15/86
        ~
M53982                        B-93 SALEM ATHS 4.5.2 & 4.5.3 TEST ALTERNATIVES          10/30/86 M08268                        C-02 BHR-RECIRC. PUMP TRIP (ATHS)                        08/20/79C M07990                        C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE  02/11/85C M08932                          C-11 RPS P0HER SUPPLY                                    11/07/83C
        - M52228                                      C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPA  06/28/85C N07938                          D-Of GE MARK I CONTAINMENT EVALUATION - LONG TERM        12/12/84C M10083                          D-11 FISSION GAS RELEASE                                05/01/81C M12303                          D-15 HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAIL  01/31/84C M1:255                          D-16 REVIEH OF CORPORATE MANAGEMENT CAPABILITY          01/01/70C Mf3255                          D-17 DEFINITION OF OPERABLE                              01/01/70C M43019                          D-17 DEFINITION OF OPERABLE                              08/28/84C M55859                          D-19 DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15)  10/29/85C M57155                          D-20 MARK I DRYNELL VACUUM BREAKERS - LICENSEE RESPONSE  08/31/86 M07789                          E-01 SPENT FUEL POOL EXPANSIONS                          06/18/81C M07834                          E-03 CORE RELOADS REQUIRING PRIOR NRC APPROVAL          11/27/78C
                ~
M49371                          E-04 BHR SINGLE LOOP OPERATION                          04/15/86 M44020                          F-01 I.A.1.1    SHIFT TECHNICAL ADVISOR                  06/17/82C M44090                          F-02 I.A.1.3    SHIFT MANNING                            06/30/83C M44161                          F-03 I.A.2.1    UPGRADING OF R0 AND SRO TRAINING t      01/25/83C T
k i -                                                                                          $
 
Q
* I R-1208731-001                                              REGULAT0RY                                                        INF0RHATION                    TRACKING          SYSTEM                              PAGE No.:        171 FACILITY        INPLEMENTATION                                                                    03/31/86 FITZPATRICK                                  (CDNTINUATION)
LIC ACT                                      LICENSEE TAC NO.          MPA 9                                        TITLE                                                                          COMPLETE                                STATUS      DAIE
        ~
M44232                  F-04 I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC                                                                06/07/84C M44302                  F-05 I.C.1.2/3.8 PROCEDURES GENERATION PACKAGES (NUREG                                                                06/15/86
* ~
M47215                  F-06 I.C.5              FEEDBACK OF OPERATING EXPERIENCE                                                              08/31/82C M47287                  F-07 I.C.6            CORRECT PERFORMANCE OF OPERATING ACTIVITI                                                      08/31/82C M51160                  F-08 I.D.1.1 DETAILED CONTROL R00M DESIGN REVIEH PROGRA                                                                10/10/84C M51240                  F-09 I.D.2              SAFETY PARANEFER DISPLAY SYSTEM                                                                05/15/87 M44373                  F-10 II.B.1            RCS HIGH POINT VEllTS                                                                          04/18/83C                                                                                    ,
M47938                  F-11 II.B.2            PLANT SHIELDING                                                                                05/25/83C M44441                  F-12 II.B.3            POST ACCIDENT SAMPLING                                                                          08/14/84C M44511                  F-13 II.B.4          . TRAINING FOR MITIGATING CORE DAMAGE                                                            01/25/83C M44581                  F-14 II.D.1            RV AND SV TRAINING                                                                              09/22/83C M44779.                F-18 II.E.4.1                  DEDICATED HYDROGEN PENETRATION                                                        07/26/84C M44850                  F-19 II.E.4.2                  CONTAINMENT ISOLATION DEPENDABILITY                                                    01/13/83C M44921                  F-20 II.F.1.1                  NOBLE GAS MONITOR                                                                      12/29/81C M44992                  F-21 II.F.1.2                  IODINE / PARTICULATE SAMPLING                                                          12/29/81C M45063                  F-22 II.F.1.3                  CONTAINMENT HIGH RANGE MONITOR                                                          02/08/82C F-23 M47599                        II.F.1.4                  CONTAINMENT PRESSURE INSTRUMENT                                                        07/25/84C M47670                  F-24 II.F.1.5                  CONTAINMENT HATER LEVEL INSTRUMENT                                                      07/25/84C M47741                  F-25 II.F.1.6                  CONTAINMENT HYDROGEN MONITOR                                                        ,
07/25/84C                                                                                  -
'.            ""M45134                    F-26 II.F.2                    INSTRUMENTS FOR DETECTION ON INADEQUATE M45343                  F-38 II.K.3.3                  REPORTING SV AND RV FAILURES AND CHALLE                                                08/17/82C M45542                  F-43 II.K.3.13                HPCI AND RCIC INITIATION LEVELS                                                        06/17/83C 03/04/82C M45570                  F-45 II.K.3.15                ISOLATION OF HCPI AND RCIC MODIFICATION T
_ . . _ . _ _ _ _ _ _ _ _ __ .                      .....m.          . _ . . _ . . . . . . _ - , , . _ . . _ _ - . . _ . _ , , . . - - _ .                      . - -,_ ,,_. _ , , , _ _ _ . _ . _ . _          . m. . ., - __          - - _ .
 
O      =
1 1
R-1208731-001                          REGULAT0RY                INF0RHATION                    TRACKING      SYSTEH                  PAGE N0.8  172
                                                                                                                                                                    ~
FACILITY                IMPLEMENTATION                                              03/31/86 FITZPATRICK                        (CONTINUATION)
LIC ACT                    LICENSEE TAC HO. MPA 0                        TITLE                                              COMPLETE              STATUS      Ralf
  ~
M45594      F-46  II.K.3.16            CHALLENGES AND FAILURES OF RELIEF VALVE              11/13/84C M45629      F-47  II.K.3.17            ECCS OUTAGES                                          08/24/83C
  ~
M45690      F-48  II.K.3.18            ADS ACTUATION                                        06/03/83C M45714      F-49  II.K.3.19            INTERLOCK RECIRCULATION PUMP MODIFICATI              07/23/81C
  ~
M45738      F-50  II.K.3.21            RESTART OF CSS AND LPCI                              07/20/82C M47856      F-51  II.K.3.22            RCIC SUCTION                                          05/05/83C M46723      F-52  II.K.3.24            SPACE COOLING FOR HPCI/RCIC MODIFICATI0              07/09/82C M45762      F-53  II.K.3.25            PONER ON FUMP SEALS                                  12/01/82C M45786      F-54  II.K.3.27            COMMON REFERENCE LEVEL                                01/29/82C M48269      F-55  II.K.3.28            QUALIFICATION OF ADS ACCUMULATORS                    07/24/85C M43826      F-57  II.K.3.30            SB LOCA METHODS                                      12/29/83C M48165      F-58  II.K.3.31            COMPLIANCE HITH 10 CFR 50.46                          12/29/83C M45886      F-59  II.K.3.44 ANTICIPATED TRANSIENTS HITH SINGLE FAIL                          12/17/81C l
M45910      F-60  II.K.3.45            MANUAL DEPRESSURIZATION                              05/18/33C F-63
    ~
M459'45          III.A.1.2 TECHNICAL SUPPORT CENTER                                        05/15/8)
M46016      F-64  III.A.1.2            OPERATIONAL SUPPORT CENTER                            05/15/87 M46088    -F-65  III.A.1.2            EMERGENCY OPERATIONS FACILITY                        05/15/87 M46160      F-66  III.A.1.2            NUCLEAR DATA LINK                                    07/30/82C M46232      F-67  III.A.2.1            EMERGENCY PLAN UPGRADE TO MEET RULE                  05/18/83C
        ""M46304      F-68  III.A.2.2            METEOROLOGICAL DATA UPGRADE                          05/15/87 M46575      F-69  III.D.3.3            IMPLANT RADIATION MONITORING                          07/09/82C M46046      F-70  III.D.3.4            CONTROL ROOM HABITABILITY                            02/24/82C M56123      F-71  I.D.1.2 DETAILED CONTROL ROOM REVIEN (FDLLONUP TO                          06/1'5/86 t
O
; --                                                                                                                                                    t
 
O      e l
R-1208731 -001                    REGULAT0RY            INF0RHATION                TRACKING          SYSTEM                  PAGE N0.8  167 FACILITY            IMPLEMENTAT1&N                                                    04/14/86
              .      FACILITY: FITZPATRICK                                                                                                            '
PLANT LOCATION: 8 MI NE OF OSHEGO, NY                  LICENSED P0HER: 2436 MHT                    PROJECT MANAGER: H. ABELSON DOCKET NUMBER: 050-00333                                DESIGN POWER:      0821 MHE                BRANCH CHIEF:    D. MULLER t .                    ARCH /LNGINEER: S8H                                    NSSS VENDOR:        OE                      LIC. ASSISTANT:  S. NORRIS IE INSPECTOR:      L. DOERFLEIN TAC NO. MPA 1                  TITLE M07739        E-01  FITZPATRICK - SPENT FUEL POOL INCREASE STORAGE FROM 763            TO ?244 FUEL ASSEMBLIES M07938        D-01  FITZPATRICK - MARK I CONTAINMENT LONG TERM PROGRAM IMPLEMENTATION M08315        A-01  FITZPATRICK - 10 CFR 50.55A(G) - INSERVICE INSFECTION - GENERIC M44020        F-01  FITZPATRICK - NUREG-0737 I.A.1.1 STA LONG TERM;                    REQUIREMENTS
                                                                                            \
M08045        A-02  FITZPATRICK - APPENDIX I TECH SPECS (EVALUATE RESPONSE TO NRC LETTER OF 7/11/78.)
                                                                                              \
M44090        F-02  FITZPATRICK - NUREG-0737 I.A.1.3.1, SHIFT MANNING                  OVERTIME LIMITS t108268      C-02  FITZPATRICK ATHS RECIRCULATION PUMP TRIP
                                                                                                \
M36508        B-02  FITZPATRICK - FIRE PROTECTION (EVALUATE 1/11/78 SUBMITTAL M06970        A-03  FITZPATRICK - PYHSICAL SECURITY PROGRAM M07834        E-03  FITZPATRICK - FUEL RELOAD CYCLE 3 (EVALUATE TRANSIENT ANALYSIS ( AMEND. 43)
M44161        F-03  FITZPATRICK - NUREG-0737 I.A.2.1.4, UPGRADING OF RO              AND SRO TRAINING
  ,                    M442S2        F-04  FITZPATRICK - NUREG-0737 I.C.1.2.A, INADEQUATE CORE              COOLING GUIDELINES M11146        A-04  FITZPATRICK - APPENDIX J CONTAINMENT LEAK TESTING M49371        E-04  FITZPATRICK - SINGLE LOOP OPERATION 4                    M07917        A-05  FITZPATRICK - MARK I CONTAINMENT SHORT TERM PROGRAM IMPLEMENTATION
              ~
M08218        B-05  FITZPATRICK - STRESS CORROSION CRACKING-BWR RCSPB-GENERIC                                                          ,
                  "~
M42661        5-05  FITZPATRICK'- IMPLEMENTATION OF NUREG-0313, REV. 1 M44302        F-05  FITZPATRICK - PROCEDURES GENERATION PACKAGE REVIEH                (NUREG 0737 SUPF/1)
M08193        8-06  FITZPATRICK - BHR SAFETY / RELIEF VALVE SURVEILLANCE-GENERIC M477:15        F-06  FITZPATRICK - FEEDBACK OF OPERATING EXPERIENCE                    (AP I.C.5) 7
                                                                        ,e w
 
      . 141 R-1208731-001                          REGULAT0RY                      INF0RMATION        TRACKING              SYSTEM            PAGE NO. 168 FACILITY          IMPLEMENTATION                                            04/14/86 FITZPATRICK                    (CONTINUATION)
TAC NO. MPA 8                            TITLE j          M47287      F-07    FITZPATRICK - CORRECT PERFORMANCE OF OPERATING                              ACTIVITIES (API.C.6)
M51160      F-08    FITZPATRICK - I.D.1.1 - DETAILED CONTROL ROOM DESIGN                        REVIEH PROGRAM PLAN F-08
!~          M51240      F-09    FITZPATRICK - I.D.2. SAFETY PARAMETER DISPLAY SYSTEM l
M11355      A-09    FITZPATRICK - REACTOR VESSEL BELTLINE MATERIAL                              SURVEILLANCE M07990      C-10    FITZPATRICK -CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL                    (NUREG 0612)
M10416      A-10    FITZPATRICK - CONTINGENCY PLAN REVIEW
                                                                                                                                                                    ^
j          M44373      F-10    FITZPATRICK - NUREG-0737 II.B.1, RCS HIGH POINT                            VENTS M10419      A-11    FITZPATRICK - GUARD TRAINING PLAN REVIEN i          M10083      D-11    FITZPATRICK - ENHANCED FISSION PRODJCT RELEASE FOR HIGH BURNUP LHR FUEL M47938      F-11    FITZPATRICK - PLANT SHIELDING MODIFICATIONS (II.B.2.2) i M08932      C-11    FITZPATRICK - RPS POWER SUPPLY M10014      A-12    FITZPATRICK - VITAL AREA ANALYSIS (AMEND 45)
M44441      F-12    FITZPATRICK - NUREG-0737 II.B.3.2, POST ACCIDENT                            SAMPLING MODIFICATIONS M44511      F-13    FITZPATRICK - NUREG-0737 II.B.4.1, TRAINING FOR                            MITIGATING CORE M44581      F-14    FITZPATRICK - RV AND SV TESTING
,          M10780      A-14    FITZPATRICK IST (A-14) REVIFH M12303      D-15    FITZPATRICK - HELB AND CONSEQUENTIAL SYSTEM FAILURE                        FITZPATRICK
          . M13138      A-15    FITZPATRICK-GUALITY ASSURANCE REQUIREMENTS                                  REGARDING DIESEL GENERATOR FUEL OIL 4        .M52228      C-15    FITZPATRICK - CONTROL OF HEAVY LOADS - PHASE II                            (FDLLOHUP OF MPASC-101                                  "
i        ""M13258      D-16    FITZPATRICK - REVIEN OF CORPORATE CAPABILITIES j          M12166      B  FITZPATRICK - EMERGENCY PLAN REVIEN
-          M47526      A-16    FITZPATRICK - QUALIFICATIONS INSP., EXAM, TEST,                            AUDIT PERSONNEL i          M13255      D-17    FITZPATRICK - TECHNICAL SPECIFICATION OPERABILITY                          DEFINITION a      e a
o
                          .,                  ,                  .- .                  -m              .                          ,            _  _ ___      ___ _
 
III 4
R-1208731-001                                            REGULAT0RY                    INF0RMATION                      TRACKING              SYSTEM          PAGE NO. 169 FACILITY                              IMPLEMENTATION                                          04/14/86 FITZPATRICK                            (CONTINUATION)
TAC NO.          MPA 0                                  TITLE
        ~
M43019              D-17    FITZPATRICK - TECHNICAL SPECIFICATIONS DEFINING                                              OPERABILITY FOR SAFETY SYSTEMS    ,
M08598              B-17    FITZPATRICK - HYDRAULIC SNUBBERS
        ~
M51090              A-17    FITZPATRICK - INSTRUMENTATION TO FOLLON THE COURSE                                            OF All ACCIDENT (RG 1.97)
M55709              A-18    FITZPATRICK - TECH. SPECS. AFFECTED BY 50.72 AND 50.73                                        (GL 83-43)
                                                                                                                                                                                                      ~
;                      M44779              F-18    FITZPATRICK - NUREG-0737 II.E.4.1.2, DEDICATED                                                HYDROGEN PENETRATIONS l
M44850              F-19    FITZPATRICK - NUREG-0737 II.E.4.2, CONTAINMENT                                                ISOLATION DEPENDABILITY M55859              D-19    FITZPATRICK - DIESEL GENERATOR RELIABILITY TECH. SPECS.                                      (GL 84-15)
M52017              A-19    FITZPATRICK - PROPOSED EXEMPTION TO THE HYDROGEN RULE
        ~
M59095              A-20    FITZPATRICK - 10CFR50.62 OPERATING REACTOR REVIEWS M57155              D-20    FITZPATRICK - MARK I DRYMELL VACUUM BREAKERS LICENSEE                                        RESPONSE TO GENERIC LETTER 83-08 i "" M10299                                  B-20    FITZPATRICK - CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION M44921              F-20    FITZPATRICK - NUREG-0737 II.F.1.1, NOBLE GAS                                                  MONITOR
        ~
M44992              F-21    FITZPATRICK - NUREG-0737 II.F.1.2, IODINE /                                                  PARTICULATE SAMPLING M103/.1              5-21    FITZPATRICK - LOSS OF 125-V DC BUS VOLTAGE HITH LOSS OF ANNUNCIATOR SYSTEM M4 % J63            F-22    FITZPATRICK - NUREG-0737 II.F.1.3, CONTAINMENT HIGH                                          RANGE MONITOR-
,                    M10/56              B-22    FITZPATRICK - MECHANICAL SNUBBERS M10811              8-22    FITZPATRICK - MECHANICAL SNUBBERS M11821              B-23    FITZPATRICK-DEGRADED GRID VOLTAGE M47599              F-23    FITZPATRICK - NUREG 0737 ITEM II F1.4 - CONTAINMENT                                          PRESSURE INSTRUMENT
                  ""M47670                  F-24    FITZPATRICK - NUREG 0737 ITEM II F1.5 CONTAINMENT                                            HATER LEVEL MONITOR M10179              B-24    FITZPATRICK - CONTAINMENT PURGE M42576              B-24    FITZPATRICK - LONG TERM REVIEW CONTAINMENT PURGE AND VENT                                    (B-24)
        - M08498                          B-25    FITZPATRICK BNR FEEDWATER & CONTROL ROD DRIVE N0ZZLE CRACKI NG i                    :
        ~
i l
[
                          . _ _ . . - -  _ . - - . _  . - , - . . . . .- -        ..m- _ - , _ , , - - -    _-                  _  ,,  .      _,          _    . - _ . . _      _  --
 
ass R-1208731-001                  REGULAT0RY              INF0RMATION          TRACKING          SYSTEM            PAGE NO. 170 .
FACILITY        IMPLEMENTATION                                          04/14/86 FITZPATRICK                (CONTINUATION)
;              TAC NO. MPA 9                TITLE M47741      F-25 FITZPATRICK - NUREG 0737 ITEM II F1.6 CONTAINMENT              HYDROGEN MONITOR M45134      F-26 FITZPATRICK - NUREG-0737 II.F.2.3, INADEQUATE CORE            COOLING INSTRUMENTATION
      ~
M10885      B-27 FITZPATRICK 1 - 0FFGAS EXPLOSION PREVENTION REVIEW (IE BUL. 78-03)
M45343      F-38 FITZPATRICK - NUREG-0737 II.K.3.3, REPORT ON                  RV/SV FAILURES
' ~
M11075      B-41 FITZPATRICK - FIRE PROTECTION SER SUPPLEMENT M11738      B-42 FITZPATRICK - TMI FDLLOH UP HORK a
M45542      F-43 FITZPATRICK - NUREG-0737 II.K.3.13, HPCI AND RCIC              INITIATION LEVELS M30345      B-44 FITZPATRICK-2.1.5 A,C DEDICATED H2 CONTROL                    PENETRATIONS & RECOMBINER PROCEDURE M30346      5-44 FITZPATRICK-2.2.2 A,B,C CONTROL ROOM ACCESS,                  TSC, OPERATIONAL SUPPORT CENTER M30347      B-44 FITZPATRICK-2.2.1 A,B,C SHIFT SUPER. RESP.,                    STA, TURNOVER PROCEDURES M30348      B-44 FITZPATRICK-2.1.8.C IMPROVED IODINE INST.
M30349      B-44 FITZPATRICK-2.1.8.B HIGH RANGE RADIATION                      MONITORS
' ~
M30350      B-44 FITZPATRICK-2.1.8.A POST ACCIDENT SAMPLING l              M30351      B-44 FITZPATRICK-2,1.6.B SHIELDING REVIEN
      ~
j              M30352      B-44 FITZPATRICK-2.1.6.A SYSTEMS INTEGRITY FOR HIGH                RADI0 ACTIVITY t
M30353      5-44 FITZPATRICK-2,1.4 DIVERSE CONTAINMENT                          ISOLATION M30354      B-44 FITZPATRICK-2.1.3.B INST. FOR CORE COOLING M30355      B-44 FITZPATRICK-2.1.3. A DIRECT INDICATION OF VALVE                POSITION l              M30356      B-44 FITZPATRICK-2.1.2 RELIEF 8 SAFETY VALVE                        TESTING I          ""M12899        B-45 FITZPATRICK - PRIMARY COGLANT SYSTEM PRESSURE                  ISOLATION VALVES
                                                                                                                                                    -1
;-            M45570      F-45 FITZPATRICK - NUREG-0737 II.K.3.15, ISOLATION OF              HPCI AND RCIC MODIFICATION M45594      F-46 FITZPATRICK - NUREG-0737 II.K.3.16, CHALLENGES AND            FAILURES OF RELIEF VALVES M42078      B-46 FITZPATRICK - ANALYSIS OF TURBINE DISCS      S IN G.E. TURBINES
!            W 5
I 1
            =e
 
m R-1208731-001                                      REGULAT0RY          INF0RMATION            TRACKING          SYSTEM                      PAGE NO. 171 FACILITY          IMPLEMENTATION                                                  04/14/86 FITZPATRICK                                    (CONTINUATION)
TAC NO.            MPA 9                            TITLE M12710              B-47      FITZPATRICK-ECCS CLAD SHELLING & RUPTURE M45629              F-47      FITZPATRICK - NUREG-0737 II.K.3.17, ECC SYSTEM                  OUTAGES
    ~
M45690              F-48      FITZPATRICK - NUREG-0737 II.K.3.18, ADS ACTUA1 ION              STUDY M13257              B-48      FITZPATRICK - STATION ELECTRIC DISTRIBUTION SYSTEM              VOLTAGES M41093              B-48      FITZPATRICK - STATION ELECTRIC DISTRIBUTION SYSTEM              VOLTAGES M45714              F-49      FITZPATRICK - NUREG-0737 II.K.3.19, INTERLOCK RECIRC            PUMP MODIFICATION M45738              F-50      FITZPATRICK - NUREG-0737 II.K.3.21, RESTART OF CSS              AND LPCI M47856              F-51      FITZPATRICK - NUREG - 0737 II. 3.225, RCIC                      SUCTION MODIFICATIONS M46723              F-57      FITZPATRICK - NUREG G737 ADEQUACY OF SPACE                      COOLING FOR HPCI AND RCIC (AP II.K.3.24)
M45762              F-33      FITZPATRICK - NUREG-0737 II.K.3.25, POWER ON PUMP              SEALS M45786              ' -54      FITZPATRICK - NUREG-0737 II.K.3.27, COMMON REFERENCE            LEVEL                                                        ,
M48269              F      FITZPATRICK - NUREG 0737 II.K.3.28, VERIFY QUALIFICATION        OF ACCUMULATORS ON ADS VALVES      ,
M13259              B-55      FITZPATRICK - NRC STAFF GENERIC REPORT ON BWRS                                                    j M45826              F-57      FITZPATRICK - NUREG-0737 II.K.3.30, SB LOCA                    OUTLINE M48145              F-58      FITZPATRICK -NUREG 0737 JI.K.3.31 COMPLIANCE HITH                10 CFR 50.46 M51025              5-58      FITZPATRICK - ORDER ON LO4G-TERM SDV MODIFICATIONS
  ~
M45886              F-59      FITZPATRICK - NUREG-0737 II.K.3.44, TRANSIENTS HITH            SINGLE FAILURES                              ,
M42881              B-59      FITZPATRICK - MASONRY NALL DESIGN. RESPONSE TO IE BULLETIN 80-11                                          -
  ~
M42489              B-60      FITZPATRICK - ENVIRONMENTAL' QUALIFICATION OF SAFETY            RELATED ELECTRICAL EQUIPMENT (80-CLI ,~.f)
          ""M45910              F-60      FITZPATRICK - NUREG-0737 II.K.3.45, MANUAL                      DEPRESSURIZATION M42671              B-61      FITZPATRICK - IE BULLETIN 79-27, LOSS OF NON CLASS IE          INST 8 CONTR. POWER. REV. & EVAL RESPONSES
                                                                                                                                                                        ~
M42741              B-62      FITZPATRICK - ESF RESET CONTROL DESIGN DEFICIENCY - 18E        BULLETIN 80-06 M43934              B-63      FITZPATRICK - STATION BLACKOUT PROCEDURES                      & TRAINING 7
N
                    ..-_-...e-          . .  ..--<_-w-----    -=--W-  *  * *--e '  -                '--            --      -'
 
e        =
ul R-1208731-001                                    REGULAT0RY                          INF0RMAT10N                                TRACKING                SYSTEM                                PAGE NO. s 172 c
FACILITY                                I5PLEMENTATION                                                                      04/14/86 FI1ZPATRICK                        (CONTINUATION)
If1CJ_L. MPA f                                      TITLE
    ~
M45945        F-63        FITZPATRICK - NUREG-0737 III.A.1.2, TECHNICAL                                                            SUPPORT CENTER M46016        F-64        FITZPATkICK'- NUREG-0737 III.A.1.2, OPERATIONAL                                                          SUPPORT CENTER
    ~
M46088        F-65        FITZPATRICK - NUREG-0737 III.A.1.2, EMERGENCY                                                            OPERATIONS FACILITY M43734        s-65        FITZPATRICK - SAFETY CONCCfMS. ASSOCIATED HITH PIPE                                                      BREAKS IN THE BHR SCRAM S) STEM
    ~
M46160        F-66        FITZPATRICK - III.A.2 SUCLEAR DATA LINK                                                                  DATA j
M45232        .F-67        FITZPATRICK - III.A.2.1 EMERGINCY PLAN UPGRADE                                                            TO MEET RULE M45304        F-68        FITZPATRICK              .TAEG-0737 III.A.2.2, METEOROLOGICAL                                            DATA UPGRADE i                  M45375        F-69        FITZPATRICK - NUREG-0737 III.D.J 3, INPLANT                                                              RADIATION MONITORING 3
M46446        F-70        FITZPATRICK - NUREG-0737.III.D.3.4, CONTROL ROOM                                                          HABITABILITY M56123        F-71        FITZPATRICK - I.D.1.2 DETAILED CONTROL ROOM DESIGN                                                        REVIEW
 
==SUMMARY==
REPORT - F-71 M51678        B-72        riTZPATRICK - NUREG 0737 TECH SPECS M52757        B FITZPATRICK - ITEM 1.1 - POST TRIP REVIEN PROGRAM                                                              DESCRIPTION AND PROCEDURES M52838        B-77        FITZPATRICK - IT'EM 2.1 - EQUIPMENT CLASSIFICATION AND                                                    VENDOR INTERFACE - RTS COMPONENTS M52919        B-78        FITZPATRICK 1 - ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE                                                    TESTING PROCEDURES / VENDOR RECOMMENDATIONS - RTS COMPONE
!                  H53600        B-79        FITZPATRICK-ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH SPECS-RTS COMPONENTS M54533        B-83        FITZPATRICK - TECHNICAL SPECIFICATIONS COVERED BY GENERIC                                                LETTERS 83-36, 83-37 FOR NUREG-0737 M55599        B-84        FITZPATRICK - INSPECTION OF BWR STAINLESS STEEL PIPING                                                    ACCORDING TO GENERIC LETTER 84-11 M53589        B-85      FITZPATRICK - ITEM 1.2 - POST. TRIP REVIEH-DATA AND                                                        INFORMATION CAPABILITY
;                  M53672        B-86      FITZPATRICK - ITEM 2.2 - EQUIPMENT CLASSIFICATION AND                                                      VENDOR INTERFACE - ALL SR COMPONENTS
,            ""M53755            B-87      FITZPATRICK- ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING                                                      PROCEDURES AND VENDOR RECOMMENDATIONS - ALL SR COMPONEN
    - ' M53838                  B-88      .FITZPATRICK - ITEM 3.2.3 - POST-MAINTE.4ANCE TESTING                                                      -CHANGES TO TECH. SPEC. - ALL SR COMPONENTS M54065        B-92      FITZPATRICK - ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL                                                      TESTING - DIVERSE TRIP FEATURES
'-                                                                                                                                                                                                                                    ~
M53982        B-93      FITZPATRICK- ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM                                                    FUNCTIONAL TESTING - ALTERNATIVES & TEST INTERVALS i.
k
    ~
      ,,,..,w            _ - -            -  . m,- .  .v.-n,-,-e-      ,,--v-- , , .- e--n-    ----~~e  . , . , - - . . --,--vv.~-r----      -        - - - - - ~e---- -  e,n-. , - - , -w,- -w - , s m -.---  w , -    -}}

Revision as of 01:12, 31 December 2020

Requests Markup by 860531 of Encl plant-specific List, Including Omitted Significant Actions & Date That All Aspects of Each Identified Requirement Completed/ Implemented,To Aid NRC in long-term Program Development
ML20204A081
Person / Time
Site: FitzPatrick 
Issue date: 04/30/1986
From: Abelson H
Office of Nuclear Reactor Regulation
To: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
References
TASK-***, TASK-TM NUDOCS 8605090334
Download: ML20204A081 (14)


Text

'

April 30,,1986 Docket No. 50-333 DISTRIBUTION 6 Docket File 1; OELD Mr. John C. Brons NRC PDR ACRS(10)

Senior Vice President - Local PDR EJordan Nuclear Generation Gray File BGrimes Power Authority of tf.e State RBernero JPartlow of New York SNorris HSmith 123 Main Street HAbelson SScott White Plains, New York 10601

Dear Mr. Brons:

The Comptroller General in a Report to the Congress dated September 19, 1984, stated "NRC needs better management controls to ensure implementation of generic issue solutions." To correct this situation, the Nuclear Regulatory Commission is working on a long-term program which will improve its documentation on the status of power reactor licensees' implementation of approved regulatory  !

improvements.

To assist me in developing this information for James A. FitzPatrick Nuclear Power Plant, please review the enclosed plant-specific list, add omitted significant actions to the list, and provide the date that all aspects of each identified requirement were completed / implemented or are expected to be _

complated. For each requirement that has been completed, enter " completed" under the Status column and the date the item was completed. For requirements that have not been completed / implemented, provide the projected date and enter

" projected" under the Status column. I do not expect or want a major effort made to obtain precise dates. Rather, I will accept readily-known or best-estimate-dates for actions that have been completely implemented. For example, the year only would be acceptable for completions prior to 1984; the month as well as year is needed for requirements completed after that time. For projected completions / implementations in 1986, use month and year. Use year only for projections thereafter. Please provide a response in the form of a marked up listing by May 31, 1986.

In the future, NRR will need estimated dates prior to issuance cf the safety evaluation so that the estimated schedule may be included in the evaluation. i This request is covered by OMB Clearance Number 3150-0011, which expires September 30, 1986.

Sincerely, I

(orig s4gned by) )

8605090334 860430 PDR ADOCK 05000333 P PDR Harvey Abelson, Project Manager BWR Project Directorate #2 Division of BWR Licensing

Enclosure:

As stated DBL:PD#2 DB - '2 g l S!hfFFTs Ms HA DBL:f(e#2 DM)T r 4/S8/86 4/38/86 4/y0/86 cc w/ enclosure: See next page ,

l

Mr. John C. Brons James A. FitzPatrick Nuclear Fcwer Authority of the State of New York Power Plant cc:

Mr. Charles M. Pratt Mr. Jay Dunkleberger Assistant GAneral Counsel Division of Policy Analysis Power Authority of the State and Planning of New York New York State Energy Office 10 Columbus Circle Agency Building 2 New York, New York 10019 Empire State Plaza Albany, New York 12223 Resident Inspector's Office U. S. Nuclear Regulatory Commission ~ Regional Administrator, Region I Post Office Box 136 U.S. Nuclear Regulatory Commission Lycoming, New York 13093 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. A. Klausman fir. Radford J. Converse Vice President - Quality Assurance Resident Manager Power Authority of the State James A. FitzPatrick Nuclear of New York Power Plant 10 Columbus Circle Post Office Box 41 New York, New York 10019 Lycoming, New York 13093 Mr. J. A. Gray, Jr. Mr. George Wilverding, Chairman Director - Nuclear Licensing - BWR Safety Review Committee Power Authority of the State Power Authority of the State  :

of New York of New York ,

123 Main Street 123 Main Street White Plains, New York 10601 White Plains, Nev. York 10601 ,

Mr. Robert P. Jones, Supervisor Town of Scriba R. D. #4 Oswego, New York 13126 Mr. Leroy W. Sinclair Power Authority of the State of New York '

10 Columbus Circle New York, New York 10019 Mr. M. C. Cosgrove Quality Assurance Superintendent James A. FitzPatrick Nuclear Power Plant '

Post Office Box 41 ~

Lycoming, New York 13093'

1 R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEH PAGE NO. 167

~

FACILITY IMPLEMENTATION 03/31/86 FACILITY: FITZPATRICK PLANT LOCATION: 8 MI NE OF OSWEGO, NY LICENSED P0HER: 2436 MHT PROJECT MANAGER: H. ABELSON

, DOCKET NUMBER: 050-00333 DESIGN PDHER: 0821 MWE BRANCH CHIEF: D. MULLER

. ARCH / ENGINEER: S8H NSSS VENDOR: GE LIC. ASSISTANT: S. NORRIS IE INSPECTOR: L. DOERFLEIN LIC ACT LICENSEE TAC NO MPA 0 TITLE COMPLETE STATUS RAlf M08315 A-01 10 CFR 50.55 A(G) - ISI 01/31/84C M08045 A-02 APPENDIX I - ALARA 05/29/85C

  • M06970 A-03 SECURITY REVIENS-MODIFIED AMENDMENT PLANS 01/01/79C

, M11146 A-04 APPENDIX J - CONTAINMENT LEAK TESTING 09/15/77C

M07917 A-05 GE MARK I CONTAINMENT TECN SPECS-SHORT TERM 06/13/78C M11355 A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE 04/17/81C ,

M10416 A-10 CONTINGENCY PLANNING 02/28/81C

. M10419 A-11 GUARD TRAINING PLANS 02/28/81C M10414 A-12 VITAL AREA ANALYSIS 02/23/79C 4 MI'0780 A-14 10CFR 50.55 A(G) - INSERVICE TESTING 12/05/83C M13138 A-15 QUALITY ASSURANCE REQUEST REGARDING DIESEL GENARAT 08/07/80C M47526 A-16 QUALIFICATIDMS OF EXAMINATION, INSPECTION, TESTING 08/31/82C M51090 A-17 INSTRUMENTATION 10 FCL*DW THE COURSE OF AN ACCIDEN. 05/15/87 M55709 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 05/15/86 M52017 A-19 RECOMBINER CAPABILITY BWR MARK I 06/17/85C H59095 A-20 10 CFR 50.62 OPERATING REACTOR REVIENS N//S /

""M06508 B-02 FIRE PROTECTION 08/01/79C M08218 B-05 STRESS CORROSION CRACKING - BWR RCSPB 05/01/81C M46661 B-05 STRESS CORROSION CRACKING - BHR RCSPF, 06/20/84C M08193 B-06 BHR RELIEF VALVE 07/01/79C a

a- i i

l 1

R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO. 168 FACILITY IMPLEMENTATION 03/31/86 FITZPATRICK (CONTINUATION)

LIC ACT LICENSEE TAC NO. MP4_0 ___ TITLE COMPLETE STATUS RAIE

~

M12166 B-16 EMERGENCY PLANNING AND REVISIONS 04/01/81C M08598 B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS 05/29/85C

~

M10299 B-20 CONTAINMENT LEAKAGE DUE To SEAL DETERIORATION 08/25/80C

'M10361 B-21 LOSS OF 125-V DC BUS VOLTAGE HITH LOSS OF ANNUNCIA 02/28/82C M10756 B-22 TECH SPEC SURVEILLANCE REQUIREMENTS FOR MECHANICAL 05/29/85C M10811 B-22 TECH SPEC SURVEILLANCE REQUIREMENTS FOR MECHANICAL 01/01/70C

! M11821 B-23 DEGRADED GRID VOLTAGE 12/30/79C M42576 B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL P0H 07/01/85C '

~

i- M10179 B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL PDH 08/25/80C N08494 B-25 BHR FEEDWATER N0ZZLE CRACKING 09/30/81C

~

e i M10885 B-27 REVIEW RESPONSES TO IE BULLETIN 78-03 (OFFGAS EXPL 08/22/79C

~

M11075 B-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 02/28/81C M11738 B-42 TMI FOLLON UP - ALL PLANTS 04/01/81C M30345 B-44 LESSONS LEARNED IMPLEMENTATION 03/25/80C M3di46- B-44 LESSONS LEARNED IMPLEMENTATION 03/25/80C M30347 B-44 LESSONS LEARNED IMPLEMENTATION 03/25/80C M30348 B-44 LESSONS LEARNED IMPLEMENTATION 03/25/80C 4 M30349 B-44 LESSONS LEARNED IMPLEMENTATION 03/25/30C M30350 B-44 LESSONS LEARNED IMPLEMENTATION 03/25/80C

"~M30351 B-44 LESSONS LEARNED IMPLEMENTATION 03/25/80C M30352 B-44 LESSONS LEARNED IMPLEMENTATION 03/25/80C M30353 B-44 LESSONS LEARNED IMPLEMENTATION 03/25/80C M30354 B-44 LESSONS LEARNED IMPLEMENTATION 03/25/80C

I 4

I R-1208731-001 REGULAT0RY INF9RMATION TRACKING SYSTEM PAGE NO. 169 FACILITY IMPLEMENTATION 03/31/86 FITZPATRICK (CONTINUATION)

LIC ACT LICENSEE IAC NO. MPA 9 TITLE COMPLETE STATUS Ralg

~

M30355 B-44 LESSONS LEARNED IMPLEMENTATION 03/25/80C M30356 B-44 LESSONS LEARNED IMPLEMENTATION 03/25/80C

~

M12899 B-45 HASH 1400 EVENT V, " PRIMARY COOLANT SYSTEM PRESSUR 08/08/80C M42078 B-46 ANALYSIS OF TURBINE DISC CRACKS 05/15/80C

~

M12710 B-47 ECCS; CLAD SHELLING AND RUPTURE 04/18/80C M13257 B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 01/01/70C

~

M41093 B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 07/20/82C M13259 B-55 B80 REPORT DN BHRS 01/01/70C

- M51025 B-58 SDV CAPABILITY 06/24/83C M42881 B-59 MASONRY HALL DESIGN 09/17/84C M42489 B-60 ENVIRONMENTAL QUALIFICATION 03/12/85C M42671 B-61 LOSS OF NON CLASS IE ISC POWER 07/28/82C M42741 B-62 ESF RESET CONTROL DESIGN DEFICIENCY 02/22/82C M43934 B-63 INTERIM PROCEDURES FOR SHGRT TERM BLACKOUT 11/30/81C M43T34 B-65 SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN BHR 12/31/85C M51678 B-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82-16) 05/15/86 M52757 B-76 ITEM 1.1 - POST TRIP REVIENs PROGRAM DESCRIPTION & 08/09/85C

  • M52838 B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATICN & VENDOR INTER 09/30/86 M52919 B-78 ITEMS 3.1.1 & 3.1.2 -PCST MAINTENANCE TEST FRUCEDU 05/15/86

""M530C0 B-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CHab3ES TO 07/30/85C M54533 B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETT:RS 83- 05/15/86 M55599 B-84 INSPECTIONS OF BHR STAINLESS STEEL PIPINO t.CORDIN 06/06/85C M53589 B-85 SALEM ATHS 1.2 DATA CAPABILITY 04/15/86 7

e

I R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO. 170 FACILITY IMPLENENTATION 03/31/86 FITZPATRICK (CONTINUATION)

LIC ACT LICENSEE TAC No. MPA 8 TITLE C_0MP.(11f. STATUS RATI

~

M53672 B-86 SALEM ATHS 2.2 S-R COMPONENTS 01/31/87 M53755 B-87 SALEM ATHS 3.2.1 & 3.2.2 S-R COMPONENTS 09/30/86

~

M53838 B-88 SALEM ATHS 3.2.3 T.S. 5-R COMPONENTS 07/30/85C M54065 B-92 SALEM ATHS 4.5.) DIVERSE TRIP FEATURES 05/15/86

~

M53982 B-93 SALEM ATHS 4.5.2 & 4.5.3 TEST ALTERNATIVES 10/30/86 M08268 C-02 BHR-RECIRC. PUMP TRIP (ATHS) 08/20/79C M07990 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE 02/11/85C M08932 C-11 RPS P0HER SUPPLY 11/07/83C

- M52228 C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPA 06/28/85C N07938 D-Of GE MARK I CONTAINMENT EVALUATION - LONG TERM 12/12/84C M10083 D-11 FISSION GAS RELEASE 05/01/81C M12303 D-15 HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAIL 01/31/84C M1:255 D-16 REVIEH OF CORPORATE MANAGEMENT CAPABILITY 01/01/70C Mf3255 D-17 DEFINITION OF OPERABLE 01/01/70C M43019 D-17 DEFINITION OF OPERABLE 08/28/84C M55859 D-19 DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15) 10/29/85C M57155 D-20 MARK I DRYNELL VACUUM BREAKERS - LICENSEE RESPONSE 08/31/86 M07789 E-01 SPENT FUEL POOL EXPANSIONS 06/18/81C M07834 E-03 CORE RELOADS REQUIRING PRIOR NRC APPROVAL 11/27/78C

~

M49371 E-04 BHR SINGLE LOOP OPERATION 04/15/86 M44020 F-01 I.A.1.1 SHIFT TECHNICAL ADVISOR 06/17/82C M44090 F-02 I.A.1.3 SHIFT MANNING 06/30/83C M44161 F-03 I.A.2.1 UPGRADING OF R0 AND SRO TRAINING t 01/25/83C T

k i - $

Q

  • I R-1208731-001 REGULAT0RY INF0RHATION TRACKING SYSTEM PAGE No.: 171 FACILITY INPLEMENTATION 03/31/86 FITZPATRICK (CDNTINUATION)

LIC ACT LICENSEE TAC NO. MPA 9 TITLE COMPLETE STATUS DAIE

~

M44232 F-04 I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC 06/07/84C M44302 F-05 I.C.1.2/3.8 PROCEDURES GENERATION PACKAGES (NUREG 06/15/86

  • ~

M47215 F-06 I.C.5 FEEDBACK OF OPERATING EXPERIENCE 08/31/82C M47287 F-07 I.C.6 CORRECT PERFORMANCE OF OPERATING ACTIVITI 08/31/82C M51160 F-08 I.D.1.1 DETAILED CONTROL R00M DESIGN REVIEH PROGRA 10/10/84C M51240 F-09 I.D.2 SAFETY PARANEFER DISPLAY SYSTEM 05/15/87 M44373 F-10 II.B.1 RCS HIGH POINT VEllTS 04/18/83C ,

M47938 F-11 II.B.2 PLANT SHIELDING 05/25/83C M44441 F-12 II.B.3 POST ACCIDENT SAMPLING 08/14/84C M44511 F-13 II.B.4 . TRAINING FOR MITIGATING CORE DAMAGE 01/25/83C M44581 F-14 II.D.1 RV AND SV TRAINING 09/22/83C M44779. F-18 II.E.4.1 DEDICATED HYDROGEN PENETRATION 07/26/84C M44850 F-19 II.E.4.2 CONTAINMENT ISOLATION DEPENDABILITY 01/13/83C M44921 F-20 II.F.1.1 NOBLE GAS MONITOR 12/29/81C M44992 F-21 II.F.1.2 IODINE / PARTICULATE SAMPLING 12/29/81C M45063 F-22 II.F.1.3 CONTAINMENT HIGH RANGE MONITOR 02/08/82C F-23 M47599 II.F.1.4 CONTAINMENT PRESSURE INSTRUMENT 07/25/84C M47670 F-24 II.F.1.5 CONTAINMENT HATER LEVEL INSTRUMENT 07/25/84C M47741 F-25 II.F.1.6 CONTAINMENT HYDROGEN MONITOR ,

07/25/84C -

'. ""M45134 F-26 II.F.2 INSTRUMENTS FOR DETECTION ON INADEQUATE M45343 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 08/17/82C M45542 F-43 II.K.3.13 HPCI AND RCIC INITIATION LEVELS 06/17/83C 03/04/82C M45570 F-45 II.K.3.15 ISOLATION OF HCPI AND RCIC MODIFICATION T

_ . . _ . _ _ _ _ _ _ _ _ __ . .....m. . _ . . _ . . . . . . _ - , , . _ . . _ _ - . . _ . _ , , . . - - _ . . - -,_ ,,_. _ , , , _ _ _ . _ . _ . _ . m. . ., - __ - - _ .

O =

1 1

R-1208731-001 REGULAT0RY INF0RHATION TRACKING SYSTEH PAGE N0.8 172

~

FACILITY IMPLEMENTATION 03/31/86 FITZPATRICK (CONTINUATION)

LIC ACT LICENSEE TAC HO. MPA 0 TITLE COMPLETE STATUS Ralf

~

M45594 F-46 II.K.3.16 CHALLENGES AND FAILURES OF RELIEF VALVE 11/13/84C M45629 F-47 II.K.3.17 ECCS OUTAGES 08/24/83C

~

M45690 F-48 II.K.3.18 ADS ACTUATION 06/03/83C M45714 F-49 II.K.3.19 INTERLOCK RECIRCULATION PUMP MODIFICATI 07/23/81C

~

M45738 F-50 II.K.3.21 RESTART OF CSS AND LPCI 07/20/82C M47856 F-51 II.K.3.22 RCIC SUCTION 05/05/83C M46723 F-52 II.K.3.24 SPACE COOLING FOR HPCI/RCIC MODIFICATI0 07/09/82C M45762 F-53 II.K.3.25 PONER ON FUMP SEALS 12/01/82C M45786 F-54 II.K.3.27 COMMON REFERENCE LEVEL 01/29/82C M48269 F-55 II.K.3.28 QUALIFICATION OF ADS ACCUMULATORS 07/24/85C M43826 F-57 II.K.3.30 SB LOCA METHODS 12/29/83C M48165 F-58 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46 12/29/83C M45886 F-59 II.K.3.44 ANTICIPATED TRANSIENTS HITH SINGLE FAIL 12/17/81C l

M45910 F-60 II.K.3.45 MANUAL DEPRESSURIZATION 05/18/33C F-63

~

M459'45 III.A.1.2 TECHNICAL SUPPORT CENTER 05/15/8)

M46016 F-64 III.A.1.2 OPERATIONAL SUPPORT CENTER 05/15/87 M46088 -F-65 III.A.1.2 EMERGENCY OPERATIONS FACILITY 05/15/87 M46160 F-66 III.A.1.2 NUCLEAR DATA LINK 07/30/82C M46232 F-67 III.A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE 05/18/83C

""M46304 F-68 III.A.2.2 METEOROLOGICAL DATA UPGRADE 05/15/87 M46575 F-69 III.D.3.3 IMPLANT RADIATION MONITORING 07/09/82C M46046 F-70 III.D.3.4 CONTROL ROOM HABITABILITY 02/24/82C M56123 F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEN (FDLLONUP TO 06/1'5/86 t

O

-- t

O e l

R-1208731 -001 REGULAT0RY INF0RHATION TRACKING SYSTEM PAGE N0.8 167 FACILITY IMPLEMENTAT1&N 04/14/86

. FACILITY: FITZPATRICK '

PLANT LOCATION: 8 MI NE OF OSHEGO, NY LICENSED P0HER: 2436 MHT PROJECT MANAGER: H. ABELSON DOCKET NUMBER: 050-00333 DESIGN POWER: 0821 MHE BRANCH CHIEF: D. MULLER t . ARCH /LNGINEER: S8H NSSS VENDOR: OE LIC. ASSISTANT: S. NORRIS IE INSPECTOR: L. DOERFLEIN TAC NO. MPA 1 TITLE M07739 E-01 FITZPATRICK - SPENT FUEL POOL INCREASE STORAGE FROM 763 TO ?244 FUEL ASSEMBLIES M07938 D-01 FITZPATRICK - MARK I CONTAINMENT LONG TERM PROGRAM IMPLEMENTATION M08315 A-01 FITZPATRICK - 10 CFR 50.55A(G) - INSERVICE INSFECTION - GENERIC M44020 F-01 FITZPATRICK - NUREG-0737 I.A.1.1 STA LONG TERM; REQUIREMENTS

\

M08045 A-02 FITZPATRICK - APPENDIX I TECH SPECS (EVALUATE RESPONSE TO NRC LETTER OF 7/11/78.)

\

M44090 F-02 FITZPATRICK - NUREG-0737 I.A.1.3.1, SHIFT MANNING OVERTIME LIMITS t108268 C-02 FITZPATRICK ATHS RECIRCULATION PUMP TRIP

\

M36508 B-02 FITZPATRICK - FIRE PROTECTION (EVALUATE 1/11/78 SUBMITTAL M06970 A-03 FITZPATRICK - PYHSICAL SECURITY PROGRAM M07834 E-03 FITZPATRICK - FUEL RELOAD CYCLE 3 (EVALUATE TRANSIENT ANALYSIS ( AMEND. 43)

M44161 F-03 FITZPATRICK - NUREG-0737 I.A.2.1.4, UPGRADING OF RO AND SRO TRAINING

, M442S2 F-04 FITZPATRICK - NUREG-0737 I.C.1.2.A, INADEQUATE CORE COOLING GUIDELINES M11146 A-04 FITZPATRICK - APPENDIX J CONTAINMENT LEAK TESTING M49371 E-04 FITZPATRICK - SINGLE LOOP OPERATION 4 M07917 A-05 FITZPATRICK - MARK I CONTAINMENT SHORT TERM PROGRAM IMPLEMENTATION

~

M08218 B-05 FITZPATRICK - STRESS CORROSION CRACKING-BWR RCSPB-GENERIC ,

"~

M42661 5-05 FITZPATRICK'- IMPLEMENTATION OF NUREG-0313, REV. 1 M44302 F-05 FITZPATRICK - PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPF/1)

M08193 8-06 FITZPATRICK - BHR SAFETY / RELIEF VALVE SURVEILLANCE-GENERIC M477:15 F-06 FITZPATRICK - FEEDBACK OF OPERATING EXPERIENCE (AP I.C.5) 7

,e w

. 141 R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO. 168 FACILITY IMPLEMENTATION 04/14/86 FITZPATRICK (CONTINUATION)

TAC NO. MPA 8 TITLE j M47287 F-07 FITZPATRICK - CORRECT PERFORMANCE OF OPERATING ACTIVITIES (API.C.6)

M51160 F-08 FITZPATRICK - I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN F-08

!~ M51240 F-09 FITZPATRICK - I.D.2. SAFETY PARAMETER DISPLAY SYSTEM l

M11355 A-09 FITZPATRICK - REACTOR VESSEL BELTLINE MATERIAL SURVEILLANCE M07990 C-10 FITZPATRICK -CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (NUREG 0612)

M10416 A-10 FITZPATRICK - CONTINGENCY PLAN REVIEW

^

j M44373 F-10 FITZPATRICK - NUREG-0737 II.B.1, RCS HIGH POINT VENTS M10419 A-11 FITZPATRICK - GUARD TRAINING PLAN REVIEN i M10083 D-11 FITZPATRICK - ENHANCED FISSION PRODJCT RELEASE FOR HIGH BURNUP LHR FUEL M47938 F-11 FITZPATRICK - PLANT SHIELDING MODIFICATIONS (II.B.2.2) i M08932 C-11 FITZPATRICK - RPS POWER SUPPLY M10014 A-12 FITZPATRICK - VITAL AREA ANALYSIS (AMEND 45)

M44441 F-12 FITZPATRICK - NUREG-0737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS M44511 F-13 FITZPATRICK - NUREG-0737 II.B.4.1, TRAINING FOR MITIGATING CORE M44581 F-14 FITZPATRICK - RV AND SV TESTING

, M10780 A-14 FITZPATRICK IST (A-14) REVIFH M12303 D-15 FITZPATRICK - HELB AND CONSEQUENTIAL SYSTEM FAILURE FITZPATRICK

. M13138 A-15 FITZPATRICK-GUALITY ASSURANCE REQUIREMENTS REGARDING DIESEL GENERATOR FUEL OIL 4 .M52228 C-15 FITZPATRICK - CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPASC-101 "

i ""M13258 D-16 FITZPATRICK - REVIEN OF CORPORATE CAPABILITIES j M12166 B FITZPATRICK - EMERGENCY PLAN REVIEN

- M47526 A-16 FITZPATRICK - QUALIFICATIONS INSP., EXAM, TEST, AUDIT PERSONNEL i M13255 D-17 FITZPATRICK - TECHNICAL SPECIFICATION OPERABILITY DEFINITION a e a

o

., , .- . -m . , _ _ ___ ___ _

III 4

R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO. 169 FACILITY IMPLEMENTATION 04/14/86 FITZPATRICK (CONTINUATION)

TAC NO. MPA 0 TITLE

~

M43019 D-17 FITZPATRICK - TECHNICAL SPECIFICATIONS DEFINING OPERABILITY FOR SAFETY SYSTEMS ,

M08598 B-17 FITZPATRICK - HYDRAULIC SNUBBERS

~

M51090 A-17 FITZPATRICK - INSTRUMENTATION TO FOLLON THE COURSE OF All ACCIDENT (RG 1.97)

M55709 A-18 FITZPATRICK - TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)

~

M44779 F-18 FITZPATRICK - NUREG-0737 II.E.4.1.2, DEDICATED HYDROGEN PENETRATIONS l

M44850 F-19 FITZPATRICK - NUREG-0737 II.E.4.2, CONTAINMENT ISOLATION DEPENDABILITY M55859 D-19 FITZPATRICK - DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)

M52017 A-19 FITZPATRICK - PROPOSED EXEMPTION TO THE HYDROGEN RULE

~

M59095 A-20 FITZPATRICK - 10CFR50.62 OPERATING REACTOR REVIEWS M57155 D-20 FITZPATRICK - MARK I DRYMELL VACUUM BREAKERS LICENSEE RESPONSE TO GENERIC LETTER 83-08 i "" M10299 B-20 FITZPATRICK - CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION M44921 F-20 FITZPATRICK - NUREG-0737 II.F.1.1, NOBLE GAS MONITOR

~

M44992 F-21 FITZPATRICK - NUREG-0737 II.F.1.2, IODINE / PARTICULATE SAMPLING M103/.1 5-21 FITZPATRICK - LOSS OF 125-V DC BUS VOLTAGE HITH LOSS OF ANNUNCIATOR SYSTEM M4 % J63 F-22 FITZPATRICK - NUREG-0737 II.F.1.3, CONTAINMENT HIGH RANGE MONITOR-

, M10/56 B-22 FITZPATRICK - MECHANICAL SNUBBERS M10811 8-22 FITZPATRICK - MECHANICAL SNUBBERS M11821 B-23 FITZPATRICK-DEGRADED GRID VOLTAGE M47599 F-23 FITZPATRICK - NUREG 0737 ITEM II F1.4 - CONTAINMENT PRESSURE INSTRUMENT

""M47670 F-24 FITZPATRICK - NUREG 0737 ITEM II F1.5 CONTAINMENT HATER LEVEL MONITOR M10179 B-24 FITZPATRICK - CONTAINMENT PURGE M42576 B-24 FITZPATRICK - LONG TERM REVIEW CONTAINMENT PURGE AND VENT (B-24)

- M08498 B-25 FITZPATRICK BNR FEEDWATER & CONTROL ROD DRIVE N0ZZLE CRACKI NG i  :

~

i l

[

. _ _ . . - - _ . - - . _ . - , - . . . . .- - ..m- _ - , _ , , - - - _- _ ,, . _, _ . - _ . . _ _ --

ass R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO. 170 .

FACILITY IMPLEMENTATION 04/14/86 FITZPATRICK (CONTINUATION)

TAC NO. MPA 9 TITLE M47741 F-25 FITZPATRICK - NUREG 0737 ITEM II F1.6 CONTAINMENT HYDROGEN MONITOR M45134 F-26 FITZPATRICK - NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION

~

M10885 B-27 FITZPATRICK 1 - 0FFGAS EXPLOSION PREVENTION REVIEW (IE BUL. 78-03)

M45343 F-38 FITZPATRICK - NUREG-0737 II.K.3.3, REPORT ON RV/SV FAILURES

' ~

M11075 B-41 FITZPATRICK - FIRE PROTECTION SER SUPPLEMENT M11738 B-42 FITZPATRICK - TMI FDLLOH UP HORK a

M45542 F-43 FITZPATRICK - NUREG-0737 II.K.3.13, HPCI AND RCIC INITIATION LEVELS M30345 B-44 FITZPATRICK-2.1.5 A,C DEDICATED H2 CONTROL PENETRATIONS & RECOMBINER PROCEDURE M30346 5-44 FITZPATRICK-2.2.2 A,B,C CONTROL ROOM ACCESS, TSC, OPERATIONAL SUPPORT CENTER M30347 B-44 FITZPATRICK-2.2.1 A,B,C SHIFT SUPER. RESP., STA, TURNOVER PROCEDURES M30348 B-44 FITZPATRICK-2.1.8.C IMPROVED IODINE INST.

M30349 B-44 FITZPATRICK-2.1.8.B HIGH RANGE RADIATION MONITORS

' ~

M30350 B-44 FITZPATRICK-2.1.8.A POST ACCIDENT SAMPLING l M30351 B-44 FITZPATRICK-2,1.6.B SHIELDING REVIEN

~

j M30352 B-44 FITZPATRICK-2.1.6.A SYSTEMS INTEGRITY FOR HIGH RADI0 ACTIVITY t

M30353 5-44 FITZPATRICK-2,1.4 DIVERSE CONTAINMENT ISOLATION M30354 B-44 FITZPATRICK-2.1.3.B INST. FOR CORE COOLING M30355 B-44 FITZPATRICK-2.1.3. A DIRECT INDICATION OF VALVE POSITION l M30356 B-44 FITZPATRICK-2.1.2 RELIEF 8 SAFETY VALVE TESTING I ""M12899 B-45 FITZPATRICK - PRIMARY COGLANT SYSTEM PRESSURE ISOLATION VALVES

-1

- M45570 F-45 FITZPATRICK - NUREG-0737 II.K.3.15, ISOLATION OF HPCI AND RCIC MODIFICATION M45594 F-46 FITZPATRICK - NUREG-0737 II.K.3.16, CHALLENGES AND FAILURES OF RELIEF VALVES M42078 B-46 FITZPATRICK - ANALYSIS OF TURBINE DISCS S IN G.E. TURBINES

! W 5

I 1

=e

m R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO. 171 FACILITY IMPLEMENTATION 04/14/86 FITZPATRICK (CONTINUATION)

TAC NO. MPA 9 TITLE M12710 B-47 FITZPATRICK-ECCS CLAD SHELLING & RUPTURE M45629 F-47 FITZPATRICK - NUREG-0737 II.K.3.17, ECC SYSTEM OUTAGES

~

M45690 F-48 FITZPATRICK - NUREG-0737 II.K.3.18, ADS ACTUA1 ION STUDY M13257 B-48 FITZPATRICK - STATION ELECTRIC DISTRIBUTION SYSTEM VOLTAGES M41093 B-48 FITZPATRICK - STATION ELECTRIC DISTRIBUTION SYSTEM VOLTAGES M45714 F-49 FITZPATRICK - NUREG-0737 II.K.3.19, INTERLOCK RECIRC PUMP MODIFICATION M45738 F-50 FITZPATRICK - NUREG-0737 II.K.3.21, RESTART OF CSS AND LPCI M47856 F-51 FITZPATRICK - NUREG - 0737 II. 3.225, RCIC SUCTION MODIFICATIONS M46723 F-57 FITZPATRICK - NUREG G737 ADEQUACY OF SPACE COOLING FOR HPCI AND RCIC (AP II.K.3.24)

M45762 F-33 FITZPATRICK - NUREG-0737 II.K.3.25, POWER ON PUMP SEALS M45786 ' -54 FITZPATRICK - NUREG-0737 II.K.3.27, COMMON REFERENCE LEVEL ,

M48269 F FITZPATRICK - NUREG 0737 II.K.3.28, VERIFY QUALIFICATION OF ACCUMULATORS ON ADS VALVES ,

M13259 B-55 FITZPATRICK - NRC STAFF GENERIC REPORT ON BWRS j M45826 F-57 FITZPATRICK - NUREG-0737 II.K.3.30, SB LOCA OUTLINE M48145 F-58 FITZPATRICK -NUREG 0737 JI.K.3.31 COMPLIANCE HITH 10 CFR 50.46 M51025 5-58 FITZPATRICK - ORDER ON LO4G-TERM SDV MODIFICATIONS

~

M45886 F-59 FITZPATRICK - NUREG-0737 II.K.3.44, TRANSIENTS HITH SINGLE FAILURES ,

M42881 B-59 FITZPATRICK - MASONRY NALL DESIGN. RESPONSE TO IE BULLETIN 80-11 -

~

M42489 B-60 FITZPATRICK - ENVIRONMENTAL' QUALIFICATION OF SAFETY RELATED ELECTRICAL EQUIPMENT (80-CLI ,~.f)

""M45910 F-60 FITZPATRICK - NUREG-0737 II.K.3.45, MANUAL DEPRESSURIZATION M42671 B-61 FITZPATRICK - IE BULLETIN 79-27, LOSS OF NON CLASS IE INST 8 CONTR. POWER. REV. & EVAL RESPONSES

~

M42741 B-62 FITZPATRICK - ESF RESET CONTROL DESIGN DEFICIENCY - 18E BULLETIN 80-06 M43934 B-63 FITZPATRICK - STATION BLACKOUT PROCEDURES & TRAINING 7

N

..-_-...e- . . ..--<_-w----- -=--W- * * *--e ' - '-- -- -'

e =

ul R-1208731-001 REGULAT0RY INF0RMAT10N TRACKING SYSTEM PAGE NO. s 172 c

FACILITY I5PLEMENTATION 04/14/86 FI1ZPATRICK (CONTINUATION)

If1CJ_L. MPA f TITLE

~

M45945 F-63 FITZPATRICK - NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER M46016 F-64 FITZPATkICK'- NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER

~

M46088 F-65 FITZPATRICK - NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY M43734 s-65 FITZPATRICK - SAFETY CONCCfMS. ASSOCIATED HITH PIPE BREAKS IN THE BHR SCRAM S) STEM

~

M46160 F-66 FITZPATRICK - III.A.2 SUCLEAR DATA LINK DATA j

M45232 .F-67 FITZPATRICK - III.A.2.1 EMERGINCY PLAN UPGRADE TO MEET RULE M45304 F-68 FITZPATRICK .TAEG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE i M45375 F-69 FITZPATRICK - NUREG-0737 III.D.J 3, INPLANT RADIATION MONITORING 3

M46446 F-70 FITZPATRICK - NUREG-0737.III.D.3.4, CONTROL ROOM HABITABILITY M56123 F-71 FITZPATRICK - I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEW

SUMMARY

REPORT - F-71 M51678 B-72 riTZPATRICK - NUREG 0737 TECH SPECS M52757 B FITZPATRICK - ITEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION AND PROCEDURES M52838 B-77 FITZPATRICK - IT'EM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - RTS COMPONENTS M52919 B-78 FITZPATRICK 1 - ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE TESTING PROCEDURES / VENDOR RECOMMENDATIONS - RTS COMPONE

! H53600 B-79 FITZPATRICK-ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH SPECS-RTS COMPONENTS M54533 B-83 FITZPATRICK - TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36, 83-37 FOR NUREG-0737 M55599 B-84 FITZPATRICK - INSPECTION OF BWR STAINLESS STEEL PIPING ACCORDING TO GENERIC LETTER 84-11 M53589 B-85 FITZPATRICK - ITEM 1.2 - POST. TRIP REVIEH-DATA AND INFORMATION CAPABILITY

M53672 B-86 FITZPATRICK - ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - ALL SR COMPONENTS

, ""M53755 B-87 FITZPATRICK- ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING PROCEDURES AND VENDOR RECOMMENDATIONS - ALL SR COMPONEN

- ' M53838 B-88 .FITZPATRICK - ITEM 3.2.3 - POST-MAINTE.4ANCE TESTING -CHANGES TO TECH. SPEC. - ALL SR COMPONENTS M54065 B-92 FITZPATRICK - ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE TRIP FEATURES

'- ~

M53982 B-93 FITZPATRICK- ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING - ALTERNATIVES & TEST INTERVALS i.

k

~

,,,..,w _ - - - . m,- . .v.-n,-,-e- ,,--v-- , , .- e--n- ----~~e . , . , - - . . --,--vv.~-r---- - - - - - - ~e---- - e,n-. , - - , -w,- -w - , s m -.--- w , - -