ML20199C868: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 2: | Line 2: | ||
| number = ML20199C868 | | number = ML20199C868 | ||
| issue date = 06/12/1986 | | issue date = 06/12/1986 | ||
| title = Advises That Review of Security Event Rept | | title = Advises That Review of Security Event Rept BRP 86-1, Dtd 860530,showed Potential Security Plan Violations. Requests Corrective Actions within 30 Days | ||
| author name = Axelson W | | author name = Axelson W | ||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:DH8 | ||
^ | |||
i | |||
.,. m u y.m.s 'U T V MI UN n.. | |||
anitu. M T JD JUN 121986 Dccket No. 50-155 Consumers Power Company ATTN: | |||
Dr. F. W. Buckman Vice President Nuclear Operations 1949 West Parnall Road Jackson, MI 49201 Gentlemen: | |||
A review of your Security Event Report BRP 86-1, dated May 30, 1986 (copy attached) showed a potential violation of Section 1.a.6.1 of your security plan. Additionally, we have been advised by the resident inspector of potential violations of your approved security plan in reference to a vehicle related incident that occurred on or about May 2, 1986. This matter was discussed with the site security director on or about June 2,1986. | A review of your Security Event Report BRP 86-1, dated May 30, 1986 (copy attached) showed a potential violation of Section 1.a.6.1 of your security plan. Additionally, we have been advised by the resident inspector of potential violations of your approved security plan in reference to a vehicle related incident that occurred on or about May 2, 1986. This matter was discussed with the site security director on or about June 2,1986. | ||
We request that you provide detailed information within 30 days pertaining to the above incidents, to include corrective action implemented, to enable us to determine if the potential violations meet all of the criteria contained in 10 CFR Part 2, Appendix C, Section V as " licensee identified violations." | We request that you provide detailed information within 30 days pertaining to the above incidents, to include corrective action implemented, to enable us to determine if the potential violations meet all of the criteria contained in 10 CFR Part 2, Appendix C, Section V as " licensee identified violations." | ||
l Your response to this request may contain information which is exempt from disclosure according to Part 73, Title 10, Code of Federal Regulations, Section 73.21(c). If so, your response must be handled and protected in accordance with the provisions of 10 CFR 73.21 and will not be placed in the NRC Public Document Room. | l Your response to this request may contain information which is exempt from disclosure according to Part 73, Title 10, Code of Federal Regulations, Section 73.21(c). | ||
The response directed by this letter is not subject to the clearance procedures l | If so, your response must be handled and protected in accordance with the provisions of 10 CFR 73.21 and will not be placed in the NRC Public Document Room. | ||
The response directed by this letter is not subject to the clearance procedures l | |||
of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511. | |||
We will gladly discuss any questions you have concerning this matter. | We will gladly discuss any questions you have concerning this matter. | ||
Sincerely, | Sincerely, | ||
W. L. Axelso , Chief Nuclear Material Safety and Safeguards Branch | ) | ||
W. L. Axelso, Chief Nuclear Material Safety and Safeguards Branch | |||
==Attachment:== | ==Attachment:== | ||
Security Event Report 86-1 Enclosure Contains (UNCI.ASSIFIED SAFEGUARDS INFORMATION) | Security Event Report 86-1 Enclosure Contains (UNCI.ASSIFIED SAFEGUARDS INFORMATION) | ||
SAFE 0 var 3 m70 MAT 10M fl d See Attached Distribution P | |||
o 8606180278 060612 PDR ADOCK 0500 g y y yya m y. g a p r Q (il F | |||
v, u | |||
_w vn tav 4 | |||
vimu6i v | |||
i Consumers Power Company | i JUN i 21986 Consumers Power Company 2 | ||
Distribution cc w/ attachment: | |||
Mr. Kenneth W. Berry, Director Nuclear Licensing D. P. Hoffman, Plant Superintendent l' | Mr. Kenneth W. Berry, Director Nuclear Licensing D. P. Hoffman, Plant Superintendent l' | ||
cc w/itr dtd 05/30/86, w/attch. (UNCLASSIFIED SAFEGUARDS INFORMATION) | cc w/itr dtd 05/30/86, w/attch. (UNCLASSIFIED SAFEGUARDS INFORMATION) | ||
IE File IE/DI/0RPB IE/ES NMSS/SGPL NRR/DL/SSPB | IE File IE/DI/0RPB IE/ES NMSS/SGPL NRR/DL/SSPB ACRS cc w/o | ||
==Attachment:== | ==Attachment:== | ||
DCS/RSB (RIDS) | DCS/RSB (RIDS) | ||
Licensing Fee Management Branch Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission Nuclear Facilities and Environmental Monitoring Section l | Licensing Fee Management Branch Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission Nuclear Facilities and Environmental Monitoring Section l | ||
l l | l l | ||
Enclosure Contains SAFECUAra3 U.C amTION Upon Separat;un This Page is Decontrolled R | Enclosure Contains SAFECUAra3 U.C amTION Upon Separat;un This Page is Decontrolled R | ||
gjlk hCreed | R RII RIII RIII gjlk hCreed Bo$ | ||
Stapleton AxS P | |||
4 es}} | |||
Latest revision as of 08:19, 10 December 2024
| ML20199C868 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 06/12/1986 |
| From: | Axelson W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Buckman F CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML20199C872 | List: |
| References | |
| NUDOCS 8606180278 | |
| Download: ML20199C868 (2) | |
Text
DH8
^
i
.,. m u y.m.s 'U T V MI UN n..
anitu. M T JD JUN 121986 Dccket No. 50-155 Consumers Power Company ATTN:
Dr. F. W. Buckman Vice President Nuclear Operations 1949 West Parnall Road Jackson, MI 49201 Gentlemen:
A review of your Security Event Report BRP 86-1, dated May 30, 1986 (copy attached) showed a potential violation of Section 1.a.6.1 of your security plan. Additionally, we have been advised by the resident inspector of potential violations of your approved security plan in reference to a vehicle related incident that occurred on or about May 2, 1986. This matter was discussed with the site security director on or about June 2,1986.
We request that you provide detailed information within 30 days pertaining to the above incidents, to include corrective action implemented, to enable us to determine if the potential violations meet all of the criteria contained in 10 CFR Part 2, Appendix C, Section V as " licensee identified violations."
l Your response to this request may contain information which is exempt from disclosure according to Part 73, Title 10, Code of Federal Regulations, Section 73.21(c).
If so, your response must be handled and protected in accordance with the provisions of 10 CFR 73.21 and will not be placed in the NRC Public Document Room.
The response directed by this letter is not subject to the clearance procedures l
of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this matter.
Sincerely,
)
W. L. Axelso, Chief Nuclear Material Safety and Safeguards Branch
Attachment:
Security Event Report 86-1 Enclosure Contains (UNCI.ASSIFIED SAFEGUARDS INFORMATION)
SAFE 0 var 3 m70 MAT 10M fl d See Attached Distribution P
o 8606180278 060612 PDR ADOCK 0500 g y y yya m y. g a p r Q (il F
v, u
_w vn tav 4
vimu6i v
i JUN i 21986 Consumers Power Company 2
Distribution cc w/ attachment:
Mr. Kenneth W. Berry, Director Nuclear Licensing D. P. Hoffman, Plant Superintendent l'
cc w/itr dtd 05/30/86, w/attch. (UNCLASSIFIED SAFEGUARDS INFORMATION)
IE File IE/DI/0RPB IE/ES NMSS/SGPL NRR/DL/SSPB ACRS cc w/o
Attachment:
DCS/RSB (RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission Nuclear Facilities and Environmental Monitoring Section l
l l
Enclosure Contains SAFECUAra3 U.C amTION Upon Separat;un This Page is Decontrolled R
R RII RIII RIII gjlk hCreed Bo$
Stapleton AxS P
4 es