ML20153F185: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.- -. .   - -.- -. .        ---    --
{{#Wiki_filter:.- -..
r     ~..
r
p aro p                   $                                    UNITED STATES
~..
        ,e
p aro p
        ''                  -[s                NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20066 4 001
UNITED STATES
                            /
,e
September 24, 1998 VENDOR:                     BOILING WATER REACTOR OWNERS GROUP (BWROG)
-[
SUB. LECT:                  
NUCLEAR REGULATORY COMMISSION s
WASHINGTON, D.C. 20066 4 001
/
September 24, 1998 VENDOR:
BOILING WATER REACTOR OWNERS GROUP (BWROG)
SUB. LECT:


==SUMMARY==
==SUMMARY==
OF MEETING TO DISCUSS ISSUES RELATED TO THE POTENTIAL LOSS OF EMERGENCY CORE COOLING SYSTEM (ECCS) CAPABILITY DUE TO CLOGG!NG OF THE SUCTION STRAINERS BY DEBRIS GENERATED DURING A LOSS-OF-COOLANT ACCIDENT (LOCA)
OF MEETING TO DISCUSS ISSUES RELATED TO THE POTENTIAL LOSS OF EMERGENCY CORE COOLING SYSTEM (ECCS) CAPABILITY DUE TO CLOGG!NG OF THE SUCTION STRAINERS BY DEBRIS GENERATED DURING A LOSS-OF-COOLANT ACCIDENT (LOCA)
On September 8,1998, the staff met with members of the BWROG strainer subcommittee to                       e discuss issues related to the potentialloss of ECCS capability due to clogging of the suction strainers by debris generated during a LOCA. A list of the meeting attendees is enclosed.
On September 8,1998, the staff met with members of the BWROG strainer subcommittee to e
The purpose of the meeting was to discuss the staff's review of the Utility Resolution Guidance-             j
discuss issues related to the potentialloss of ECCS capability due to clogging of the suction strainers by debris generated during a LOCA. A list of the meeting attendees is enclosed.
                .(URG) submitted by the BWROG (General Electric Topical Report NEDO-32686 Revision 0,
The purpose of the meeting was to discuss the staff's review of the Utility Resolution Guidance-j
                                                                                                                              ~
.(URG) submitted by the BWROG (General Electric Topical Report NEDO-32686 Revision 0,
                " Utility Resolution Guidance for ECCS Suction Stainer Blcckage"). The staff's safety evaluation             i L
~
              ' (SE) was issued on August 20,1998. During the September 8,1998, meeting, the staff .                         !
" Utility Resolution Guidance for ECCS Suction Stainer Blcckage"). The staff's safety evaluation i
answered questions from the BWROG on the SE and provided information on its plans for closing NRC Bulletin 96-03 and related staff activities. The following information was discussed             ;
L
at the meeting:                                                                                               '
' (SE) was issued on August 20,1998. During the September 8,1998, meeting, the staff.
                    . The BWROG noted that the discussion in the SE regarding damage pressure for certain types of insulation is incorrect. The staff agreed with the comments and willissue revised i
answered questions from the BWROG on the SE and provided information on its plans for closing NRC Bulletin 96-03 and related staff activities. The following information was discussed at the meeting:
. The BWROG noted that the discussion in the SE regarding damage pressure for certain types of insulation is incorrect. The staff agreed with the comments and willissue revised i
SE pages.
SE pages.
                    . The BWROG requested clarification of the staff's discussion of debris generation for calcium silicate insulation. The staff indicated that this issue needs to be addressed individually for each plant and that the staff is available to answer any plcnt-specific questions.
. The BWROG requested clarification of the staff's discussion of debris generation for calcium silicate insulation. The staff indicated that this issue needs to be addressed individually for each plant and that the staff is available to answer any plcnt-specific questions.
                    . The staff stated that the Advisory Committee for Reactor Safeguards had reviewed the SE and found the exceptions to the URG acceptable.
. The staff stated that the Advisory Committee for Reactor Safeguards had reviewed the SE and found the exceptions to the URG acceptable.
                    . :The statt discussed the preliminary audit plans and indicated that the audit plan will be
. :The statt discussed the preliminary audit plans and indicated that the audit plan will be
                        .provided to the BWROG for comment before it is implemented.
.provided to the BWROG for comment before it is implemented.
                    . - Regarding closure of NRC Bulletin 96-03, the staff stated that the individual TACs can be
. - Regarding closure of NRC Bulletin 96-03, the staff stated that the individual TACs can be
{
{
closed after licrAsees complete the reporting requirements by submitting a letter stating that all actions required by the NRC Bulletin 96-03 have been completed. The related issues in Generic Lotters (GL) 97-04 and 98-06 will be separated from NRC Bulletin 96-03. Open issues resulting from these GL should not impact closure of NRC Bulletin 96-03. All actions related to NRC Bulletin 96-03, including completion of the audits and any followup inspection guidance, should be closed in spring 1999.
closed after licrAsees complete the reporting requirements by submitting a letter stating that all actions required by the NRC Bulletin 96-03 have been completed. The related issues in Generic Lotters (GL) 97-04 and 98-06 will be separated from NRC Bulletin 96-03. Open issues resulting from these GL should not impact closure of NRC Bulletin fJ 96-03. All actions related to NRC Bulletin 96-03, including completion of the audits and p
pfJ
any followup inspection guidance, should be closed in spring 1999.
                            -e                                 .
$7W
                                                                                                          $7W g.
-e g.
9809290035 990924                                     C
j QD g 3 6CLS 9809290035 990924 C
[DR TOPRP EMV                               L     q                 j            QD g 3 6CLS r.n ns .a +
TOPRP EMV L
                                                                                                                              +
[DR q
r.n ns.a +
+


    . . . - .    . -            .  ~ .         . . -        . -.. - - --                            ---.      . - . . . - - - . -
~.
t September 24, 1998 l
t September 24, 1998,
The BWROG asked about the status of related NRC Bulletins 93-02 and 95-02. The plant-                               ;
The BWROG asked about the status of related NRC Bulletins 93-02 and 95-02. The plant-specific TACs for NRC Bulletin 93-02 are closed and the MPA is scheduled to be closed by October 1998. Plant-specific safety evaluations are being prepared for NRC Sulletin 95-02 and the scheduled closure date for the MPA is the end of 1998.
specific TACs for NRC Bulletin 93-02 are closed and the MPA is scheduled to be closed by October 1998. Plant-specific safety evaluations are being prepared for NRC Sulletin 95-02 and the scheduled closure date for the MPA is the end of 1998.
The staff ave a summary of current research activities related to ECCS strainer clogging D
The staff ave a summary of current research activities related to ECCS strainer clogging for PWRs. This program is currently in the information gathering stage.
for PWRs. This program is currently in the information gathering stage.
The BWROG asked about discussions between the industry and the NRC on the use of leak-before-break. The staff stated that it will meet with the industry before making a decision.
The BWROG asked about discussions between the industry and the NRC on the use of leak-before-break. The staff stated that it will meet with the industry before making a decision.
ORIG. SIGNED BY~S. BAILEY for Donna M. Skay, Project Manager
ORIG. SIGNED BY~S. BAILEY for Donna M. Skay, Project Manager
                                                                      . Project Directorate ill-2 l
. Project Directorate ill-2 Division of Reactor Projects - Ill/IV Office of Nuclear Reactor Regulation
Division of Reactor Projects - Ill/IV                           I Office of Nuclear Reactor Regulation                           )


==Enclosure:==
==Enclosure:==
List of Attendees .
List of Attendees.
cc: See next page l
cc: See next page l
DISTRIBUTION-                   e-mail:                 .                                                          i l                   hard coov:                     SCollins/FMiraglia             BBoger Central Files                   EAdensam                     SRichards                                           ,
DISTRIBUTION-e-mail:
                  ~ PUBLIC .                     . CMoore                       TMartin (SLM3)                                       I PDill-2 r/f                   THiltz (TGH)                   R. Elliott DSkay                           KKavanagh .                   MMarshall                                             i OGC                           JKudrick                       CBerlinger l               . ACRS                             RLobel                       ASerkiz .                                           l
i l
                                                                                                                                      ~
hard coov:
l-               ' SBailey1 j
SCollins/FMiraglia BBoger Central Files EAdensam SRichards
: i.                                                                                                                                     ,
~ PUBLIC.
. CMoore TMartin (SLM3)
PDill-2 r/f THiltz (TGH)
R. Elliott DSkay KKavanagh.
MMarshall OGC JKudrick CBerlinger l
. ACRS RLobel ASerkiz.
l-
' SBailey1
~
j i.
i.
i.
1 DOCUMENT NAME:- G:\CM\SKAY\0908MT. SUM To RECEIVE A COPY OF THIS DOCUMENT, INDICATE th THE BOX: "C" = COPY WITHoUT ENCLOSURES *E" = COPY WITH ENCLOSURES "N" l3 OFFICE         PM:PD3-2         k   Lk:k3)             L SCSB y                      &  D:PD3-2       (r.-
1 DOCUMENT NAME:- G:\\CM\\SKAY\\0908MT. SUM To RECEIVE A COPY OF THIS DOCUMENT, INDICATE th THE BOX: "C" = COPY WITHoUT ENCLOSURES *E" = COPY WITH ENCLOSURES "N" l3 OFFICE PM:PD3-2 k Lk:k3)
l      NAME        DSkay:sp ((           C d e(                       REllictt h             SRichards 6k DATE         9/ 10 /98             9/ 6 /98                     9/ ll- /98             9/ M /98 OFFICIAL RECORD COPY
L SCSB D:PD3-2 (r.-
__ _                    -_ J
y DSkay:sp ((
Cd e(
REllictt h SRichards 6k l
NAME DATE 9/ 10 /98 9/ 6 /98 9/ ll- /98 9/ M /98 OFFICIAL RECORD COPY J


1 l
' l i
l I
1
I l
. The BWROG asked about the status of related NRC Bulletins 93-02 and 95-02. The plant-specific TACs for NRC Bulletin 93-02 are closed and the MPA is scheduled to be closed by October 1998. Plant-specific safety evaluations are being prepared for NRC 1
i 1
Bulletin 95-02 and the scheduled closure date for the MPA is the end of 1998.
          . The BWROG asked about the status of related NRC Bulletins 93-02 and 95-02. The plant-specific TACs for NRC Bulletin 93-02 are closed and the MPA is scheduled to be closed by October 1998. Plant-specific safety evaluations are being prepared for NRC             1 Bulletin 95-02 and the scheduled closure date for the MPA is the end of 1998.
The staff gave a summary of current research activities related to ECCS strainer clogging for PWRs. This program is currently in the information gathering stage.
The staff gave a summary of current research activities related to ECCS strainer clogging for PWRs. This program is currently in the information gathering stage.
The BWROG asked about discussions between the industry and the NRC on the use of leak-before-break. The staff stated that it will meet with the industry before making a decision.
The BWROG asked about discussions between the industry and the NRC on the use of leak-before-break. The staff stated that it will meet with the industry before making a decision.
4 nna             .      ay,Pr ct     ger                 J Project Directorate lil-2                         i Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation
4 nna ay,Pr ct ger J
Project Directorate lil-2 Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation


==Enclosure:==
==Enclosure:==
List of Attendees cc: See next page 1
List of Attendees cc: See next page l
l l
l j
l l
1 E
l l
4 c'
i l
j                                                                                                            i' 1
E 4
l c'


      ~       .                . . _  .._. _m..  ._ . _ _ . . . _ . . _ . _ _ , _ - _ . _ . . _ . . . _ . . - . . _ _ . .
~
        .. s.
_m..
3-cc: . Thomas J. Rausch, Chairman                                                                               W. Glenn Warren Boiling Water Reactor Owners' Group                                                                   Southem Nuclear / Georgia Power Commonwealth Edison Company                                                                           E.I. Hatch Nuclear Plant Nuclear Fuel Services                                                                                 PO Box 1295 M/C B052
s.
                        - 1400 Opus Place,4th Floor ETWill                                                                     Birmingham, AL 35201 Downers Grove, IL 60515 '
3-cc:. Thomas J. Rausch, Chairman W. Glenn Warren Boiling Water Reactor Owners' Group Southem Nuclear / Georgia Power Commonwealth Edison Company E.I. Hatch Nuclear Plant Nuclear Fuel Services PO Box 1295 M/C B052
Carl D. Terry                                                                                         Dennis B. Townsend Vice President, Nuclear Engineering                                                                   GE Nuclear Energy Niagara Mohawk Power Corporation                                                                     M/C 182 Nine Mile Point-2                                                                                     175 Curtner Avenue PO Box 63                                                                                             San Jose, CA 95125 Lycoming, NY 13093 1
- 1400 Opus Place,4th Floor ETWill Birmingham, AL 35201 Downers Grove, IL 60515 '
Drew B. Fetters                                                                                       Thomas A. G:een -               '
Carl D. Terry Dennis B. Townsend Vice President, Nuclear Engineering GE Nuclear Energy Niagara Mohawk Power Corporation M/C 182 Nine Mile Point-2 175 Curtner Avenue PO Box 63 San Jose, CA 95125 Lycoming, NY 13093 Drew B. Fetters Thomas A. G:een -
PECO Energy                                                                                           GE Nuclear Energy               !
PECO Energy GE Nuclear Energy Nuclear Group Headquarters-Mail Code 182 MC 62C-3
Nuclear Group Headquarters-
~
                                                ~
175 Curtner Avenue 965 Chesterbrook Blvd.
Mail Code 182 MC 62C-3                                                                                           .
San Jose, CA 95125 Wayne, PA iTB7 George T. Joner Pennsylvania Powa & bght -
175 Curtner Avenue             l 965 Chesterbrook Blvd.                                                                               San Jose, CA 95125 Wayne, PA iTB7 George T. Joner Pennsylvania Powa & bght -
MC A6-1 Two North Ninth Street 1
MC A6-1 1
' Allentown, PA 18101 Lewis H.- Sumner Southern Nuclear / Georgia Power E. l. Hatch Nuclear Power Plant 40 Invemess Parkway PO Box 1295 Birmingham,GA 35201
Two North Ninth Street
' John Kelly New York Power Authority 14th Floor Mail Stop 14K Centroplex Building 123 Main Street
                        ' Allentown, PA 18101 Lewis H.- Sumner Southern Nuclear / Georgia Power E. l. Hatch Nuclear Power Plant 40 Invemess Parkway PO Box 1295 Birmingham,GA 35201
' White Plains, NY 10601 d
                        ' John Kelly
,                        New York Power Authority 14th Floor Mail Stop 14K Centroplex Building 123 Main Street
                      ' White Plains, NY 10601 d
4
4
  '; b'
'; b'
                                                                                    .n.,-         ,        u                         -
.n.,-
u


MEETING WITH BWR OWNERS' GROUP SEPTEMBER 8,1998                                         j i
MEETING WITH BWR OWNERS' GROUP SEPTEMBER 8,1998 j
NAME                               AFFILIATION                                       !
i NAME AFFILIATION Tom Green General Electric Rocky Sgarro Pennsylvania Power & Light Bill Houston Sequoia Consulting Group Dan Maret Sequoia Consulting Group Barry Barkley PSE&G:
Tom Green                           General Electric Rocky Sgarro                       Pennsylvania Power & Light Bill Houston                       Sequoia Consulting Group Dan Maret                           Sequoia Consulting Group Barry Barkley
Tom Oldenhage Pennsylvania Power & Light Richard Pistolas Pennsylvania Power & Light George Cornelius Northwest Utilities i
* PSE&G:                                             I Tom Oldenhage                       Pennsylvania Power & Light Richard Pistolas                   Pennsylvania Power & Light George Cornelius                     Northwest Utilities                               i Dana Smith                         Entergy Operations                                 i Ted Hilston                         Cleveland Electric                                 l
Dana Smith Entergy Operations i
: Pat Tobin                           Northem States Power Gilbert Zigla                       ITS Corporation Boyd Stanley                       CP&L Paul Hansen                         GPU Nuclear                                       ;
Ted Hilston Cleveland Electric
Jim Costedio                         New York Power Authority                         3 Norm Hoy                             New York Power Authority Jon Arterbum                         Duke Engineering Steve Huebsch                       Alliant Utilities /IES Utilities PaulDuke                           PSE&G Alan Bilanin                         Continuum Dynamics James Emens                         Tennessee Valley Authority Ted Ryan                             PECO Nuclear Les England                         Entergy Operations Jeff Branum                         Southern Nuclear Ronnie Cole                         Entergy Operations Kerri Kavanagh                     NRC Donna Skay                           NRC Michael Marshall                   NRC Stuart Richards.                   NRC Rob Elliott                         NRC l
: Pat Tobin Northem States Power Gilbert Zigla ITS Corporation Boyd Stanley CP&L Paul Hansen GPU Nuclear Jim Costedio New York Power Authority 3
Norm Hoy New York Power Authority Jon Arterbum Duke Engineering Steve Huebsch Alliant Utilities /IES Utilities PaulDuke PSE&G Alan Bilanin Continuum Dynamics James Emens Tennessee Valley Authority Ted Ryan PECO Nuclear Les England Entergy Operations Jeff Branum Southern Nuclear Ronnie Cole Entergy Operations Kerri Kavanagh NRC Donna Skay NRC Michael Marshall NRC Stuart Richards.
NRC Rob Elliott NRC l
l.
l.
i ENCLOSUR.E r
i ENCLOSUR.E r
                                              .                          ._}}
._}}

Latest revision as of 02:37, 11 December 2024

Summary of 980908 Meeting W/Bwrog Re Potential Loss of ECCS Capability Due to Clogging of Suction Strainers by Debris Generated During Loca.List of Attendees Encl.Info Discussed at Meeting Listed
ML20153F185
Person / Time
Issue date: 09/24/1998
From: Skay D
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9809290035
Download: ML20153F185 (5)


Text

.- -..

r

~..

p aro p

UNITED STATES

,e

-[

NUCLEAR REGULATORY COMMISSION s

WASHINGTON, D.C. 20066 4 001

/

September 24, 1998 VENDOR:

BOILING WATER REACTOR OWNERS GROUP (BWROG)

SUB. LECT:

SUMMARY

OF MEETING TO DISCUSS ISSUES RELATED TO THE POTENTIAL LOSS OF EMERGENCY CORE COOLING SYSTEM (ECCS) CAPABILITY DUE TO CLOGG!NG OF THE SUCTION STRAINERS BY DEBRIS GENERATED DURING A LOSS-OF-COOLANT ACCIDENT (LOCA)

On September 8,1998, the staff met with members of the BWROG strainer subcommittee to e

discuss issues related to the potentialloss of ECCS capability due to clogging of the suction strainers by debris generated during a LOCA. A list of the meeting attendees is enclosed.

The purpose of the meeting was to discuss the staff's review of the Utility Resolution Guidance-j

.(URG) submitted by the BWROG (General Electric Topical Report NEDO-32686 Revision 0,

~

" Utility Resolution Guidance for ECCS Suction Stainer Blcckage"). The staff's safety evaluation i

L

' (SE) was issued on August 20,1998. During the September 8,1998, meeting, the staff.

answered questions from the BWROG on the SE and provided information on its plans for closing NRC Bulletin 96-03 and related staff activities. The following information was discussed at the meeting:

. The BWROG noted that the discussion in the SE regarding damage pressure for certain types of insulation is incorrect. The staff agreed with the comments and willissue revised i

SE pages.

. The BWROG requested clarification of the staff's discussion of debris generation for calcium silicate insulation. The staff indicated that this issue needs to be addressed individually for each plant and that the staff is available to answer any plcnt-specific questions.

. The staff stated that the Advisory Committee for Reactor Safeguards had reviewed the SE and found the exceptions to the URG acceptable.

. :The statt discussed the preliminary audit plans and indicated that the audit plan will be

.provided to the BWROG for comment before it is implemented.

. - Regarding closure of NRC Bulletin 96-03, the staff stated that the individual TACs can be

{

closed after licrAsees complete the reporting requirements by submitting a letter stating that all actions required by the NRC Bulletin 96-03 have been completed. The related issues in Generic Lotters (GL) 97-04 and 98-06 will be separated from NRC Bulletin 96-03. Open issues resulting from these GL should not impact closure of NRC Bulletin fJ 96-03. All actions related to NRC Bulletin 96-03, including completion of the audits and p

any followup inspection guidance, should be closed in spring 1999.

$7W

-e g.

j QD g 3 6CLS 9809290035 990924 C

TOPRP EMV L

[DR q

r.n ns.a +

+

~.

t September 24, 1998,

The BWROG asked about the status of related NRC Bulletins 93-02 and 95-02. The plant-specific TACs for NRC Bulletin 93-02 are closed and the MPA is scheduled to be closed by October 1998. Plant-specific safety evaluations are being prepared for NRC Sulletin 95-02 and the scheduled closure date for the MPA is the end of 1998.

The staff ave a summary of current research activities related to ECCS strainer clogging D

for PWRs. This program is currently in the information gathering stage.

The BWROG asked about discussions between the industry and the NRC on the use of leak-before-break. The staff stated that it will meet with the industry before making a decision.

ORIG. SIGNED BY~S. BAILEY for Donna M. Skay, Project Manager

. Project Directorate ill-2 Division of Reactor Projects - Ill/IV Office of Nuclear Reactor Regulation

Enclosure:

List of Attendees.

cc: See next page l

DISTRIBUTION-e-mail:

i l

hard coov:

SCollins/FMiraglia BBoger Central Files EAdensam SRichards

~ PUBLIC.

. CMoore TMartin (SLM3)

PDill-2 r/f THiltz (TGH)

R. Elliott DSkay KKavanagh.

MMarshall OGC JKudrick CBerlinger l

. ACRS RLobel ASerkiz.

l-

' SBailey1

~

j i.

i.

1 DOCUMENT NAME:- G:\\CM\\SKAY\\0908MT. SUM To RECEIVE A COPY OF THIS DOCUMENT, INDICATE th THE BOX: "C" = COPY WITHoUT ENCLOSURES *E" = COPY WITH ENCLOSURES "N" l3 OFFICE PM:PD3-2 k Lk:k3)

L SCSB D:PD3-2 (r.-

y DSkay:sp ((

Cd e(

REllictt h SRichards 6k l

NAME DATE 9/ 10 /98 9/ 6 /98 9/ ll- /98 9/ M /98 OFFICIAL RECORD COPY J

' l i

1

. The BWROG asked about the status of related NRC Bulletins 93-02 and 95-02. The plant-specific TACs for NRC Bulletin 93-02 are closed and the MPA is scheduled to be closed by October 1998. Plant-specific safety evaluations are being prepared for NRC 1

Bulletin 95-02 and the scheduled closure date for the MPA is the end of 1998.

The staff gave a summary of current research activities related to ECCS strainer clogging for PWRs. This program is currently in the information gathering stage.

The BWROG asked about discussions between the industry and the NRC on the use of leak-before-break. The staff stated that it will meet with the industry before making a decision.

4 nna ay,Pr ct ger J

Project Directorate lil-2 Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation

Enclosure:

List of Attendees cc: See next page l

l j

1 E

4 c'

~

_m..

s.

3-cc:. Thomas J. Rausch, Chairman W. Glenn Warren Boiling Water Reactor Owners' Group Southem Nuclear / Georgia Power Commonwealth Edison Company E.I. Hatch Nuclear Plant Nuclear Fuel Services PO Box 1295 M/C B052

- 1400 Opus Place,4th Floor ETWill Birmingham, AL 35201 Downers Grove, IL 60515 '

Carl D. Terry Dennis B. Townsend Vice President, Nuclear Engineering GE Nuclear Energy Niagara Mohawk Power Corporation M/C 182 Nine Mile Point-2 175 Curtner Avenue PO Box 63 San Jose, CA 95125 Lycoming, NY 13093 Drew B. Fetters Thomas A. G:een -

PECO Energy GE Nuclear Energy Nuclear Group Headquarters-Mail Code 182 MC 62C-3

~

175 Curtner Avenue 965 Chesterbrook Blvd.

San Jose, CA 95125 Wayne, PA iTB7 George T. Joner Pennsylvania Powa & bght -

MC A6-1 Two North Ninth Street 1

' Allentown, PA 18101 Lewis H.- Sumner Southern Nuclear / Georgia Power E. l. Hatch Nuclear Power Plant 40 Invemess Parkway PO Box 1295 Birmingham,GA 35201

' John Kelly New York Power Authority 14th Floor Mail Stop 14K Centroplex Building 123 Main Street

' White Plains, NY 10601 d

4

'; b'

.n.,-

u

MEETING WITH BWR OWNERS' GROUP SEPTEMBER 8,1998 j

i NAME AFFILIATION Tom Green General Electric Rocky Sgarro Pennsylvania Power & Light Bill Houston Sequoia Consulting Group Dan Maret Sequoia Consulting Group Barry Barkley PSE&G:

Tom Oldenhage Pennsylvania Power & Light Richard Pistolas Pennsylvania Power & Light George Cornelius Northwest Utilities i

Dana Smith Entergy Operations i

Ted Hilston Cleveland Electric

Pat Tobin Northem States Power Gilbert Zigla ITS Corporation Boyd Stanley CP&L Paul Hansen GPU Nuclear Jim Costedio New York Power Authority 3

Norm Hoy New York Power Authority Jon Arterbum Duke Engineering Steve Huebsch Alliant Utilities /IES Utilities PaulDuke PSE&G Alan Bilanin Continuum Dynamics James Emens Tennessee Valley Authority Ted Ryan PECO Nuclear Les England Entergy Operations Jeff Branum Southern Nuclear Ronnie Cole Entergy Operations Kerri Kavanagh NRC Donna Skay NRC Michael Marshall NRC Stuart Richards.

NRC Rob Elliott NRC l

l.

i ENCLOSUR.E r

._