ML20133F679: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:_-___       _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ - - _ _ - - _ _ _
{{#Wiki_filter:_-___
      .
_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ - - _ _ - - _ _ _
    .
.
      .
.
        Docket No.   50-423
.
        Northeast Nuclear Energy Company
Docket No.
        ATTN: Mr. J. F. Opeka
50-423
                Senior Vice President - Nuclear
Northeast Nuclear Energy Company
                Engineering and Operations Group
ATTN: Mr. J. F. Opeka
        P. O. Box 270
Senior Vice President - Nuclear
        Hartford, Connecticut 06101
Engineering and Operations Group
        Gentlemen:
P. O. Box 270
            .
Hartford, Connecticut 06101
        Subject:   Inspection Report No.                                   50-423/85-27
Gentlemen:
        This refers to the routine safety inspection conducted by Mr. H. Nicholas of
.
        this office on June 3-7, 1985, at Millstone Nuclear Power Station, Unit 3
Subject:
        Waterford, Connecticut, of activities authorized by NRC License No. CPPR-113
Inspection Report No.
        and to the discussions of our findings held by Mr. Nicholas with Mr. J. Crockett
50-423/85-27
        of your staff at the conclusion of the inspection.
This refers to the routine safety inspection conducted by Mr. H. Nicholas of
        Areas examined during this inspection are described in the NRC Regio.i I
this office on June 3-7, 1985, at Millstone Nuclear Power Station, Unit 3
        Inspection Report which is enclosed with this letter. Within these areas, the
Waterford, Connecticut, of activities authorized by NRC License No. CPPR-113
        ir:spection consisted of selective examinations of procedures and representative
and to the discussions of our findings held by Mr. Nicholas with Mr. J. Crockett
        records, interviews with personnel, and observations by tho inspector.
of your staff at the conclusion of the inspection.
        Within the scope of this inspection, no violations were observed.
Areas examined during this inspection are described in the NRC Regio.i I
        No reply to this letter is required. Your cooperation with us in this matter
Inspection Report which is enclosed with this letter. Within these areas, the
        is appreciated.
ir:spection consisted of selective examinations of procedures and representative
                                      ,
records, interviews with personnel, and observations by tho inspector.
                                                                                                                                      Sincerely,
Within the scope of this inspection, no violations were observed.
                                                                                                                                    + Origitul Signed By:
No reply to this letter is required. Your cooperation with us in this matter
  4
is appreciated.
                                                                                                                      ,
Sincerely,
                                                                                                                                    ' ,We 3. BctterJmtisen
,
                                                                                                                    M t ;< art D. Ebneter, Director
+ Origitul Signed By:
                                                                                                                            ) Division of Reactor Safety
' ,We 3. BctterJmtisen
  ,      Enclosure:   NRC Region I Inspection Report No. 50-423/85-27
4
                                                                                                                                                                                          f
,
                                      0FFTCIAL RECORD COPY                                                                                                 1R MILLSTONE 3 85-27 - 0001.0.0
M t ;< art D. Ebneter, Director
                                                                                                                                                          07/05/85
) Division of Reactor Safety
                      8 850         3
Enclosure:
        G
NRC Region I Inspection Report No. 50-423/85-27
,
f
0FFTCIAL RECORD COPY
1R MILLSTONE 3 85-27 - 0001.0.0
07/05/85
8 850
3
G
t
t
                                                                                                                                            _ _ _ _ _ _ _
_ _ _ _ _ _ _


                    _ __________
_ __________
      .
.
  .
.
        Northeast Nuclear Energy Co.                 2
Northeast Nuclear Energy Co.
        cc w/ encl:
2
        V. Papadopoli, Construction Quality Assurance Supervisor
cc w/ encl:
        E. R. Foster, Director of Generation Construction
V. Papadopoli, Construction Quality Assurance Supervisor
    '
E. R. Foster, Director of Generation Construction
        E. J. Mroczka, Vice President, Nuclear Operations
E. J. Mroczka, Vice President, Nuclear Operations
        D. O. Nordquist, Manager of Quality Assurance
'
        R. T. Laudenat, Manager, Generation Facilities Licensing
D. O. Nordquist, Manager of Quality Assurance
        W. D. Romberg, Station Superintendent
R. T. Laudenat, Manager, Generation Facilities Licensing
        Public Document Room (PDR)                                                               {
W. D. Romberg, Station Superintendent
        local Public Document Roem (LPDR)
{
  *
Public Document Room (PDR)
        Nuclear Safety Information Center (NSIC)
local Public Document Roem (LPDR)
        NRC Senior Resident Inspector
Nuclear Safety Information Center (NSIC)
        State of Connecticut
NRC Senior Resident Inspector
        bec w/ encl:
*
        Region I Docket Room (with concurrences)
State of Connecticut
        Senior Operations Officer (w/o encl)                                                   ,
bec w/ encl:
        E. McCabe, Chief, Section #3B, RPB #3, DRP
Region I Docket Room (with concurrences)
        G. Walton, SRI, Beaver Valley Unit 2
Senior Operations Officer (w/o encl)
,
E. McCabe, Chief, Section #3B, RPB #3, DRP
G. Walton, SRI, Beaver Valley Unit 2
l
l
                                      '                $W
$W
                                  RI:DRS               RI:DRS
'
          Nicholas /mmb           Bettenhausen         Ebneter
RI:DRS
          7 jg gf               7/2}/67             ?N/T
RI:DRS
                                        OFFICIAL RECORD COPY   IR MILLSTONE 3 85-27 - 0002.0.0
Nicholas /mmb
                                                                07/05/85
Bettenhausen
Ebneter
7 jg gf
7/2}/67
?N/T
OFFICIAL RECORD COPY
IR MILLSTONE 3 85-27 - 0002.0.0
07/05/85
}}
}}

Latest revision as of 09:25, 12 December 2024

Forwards Insp Rept 50-423/85-27 on 850603-07.No Violation Noted
ML20133F679
Person / Time
Site: Millstone 
Issue date: 07/24/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20133F682 List:
References
NUDOCS 8508080388
Download: ML20133F679 (2)


See also: IR 05000423/1985027

Text

_-___

_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ - - _ _ - - _ _ _

.

.

.

Docket No.

50-423

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

.

Subject:

Inspection Report No.

50-423/85-27

This refers to the routine safety inspection conducted by Mr. H. Nicholas of

this office on June 3-7, 1985, at Millstone Nuclear Power Station, Unit 3

Waterford, Connecticut, of activities authorized by NRC License No. CPPR-113

and to the discussions of our findings held by Mr. Nicholas with Mr. J. Crockett

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Regio.i I

Inspection Report which is enclosed with this letter. Within these areas, the

ir:spection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by tho inspector.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

,

+ Origitul Signed By:

' ,We 3. BctterJmtisen

4

,

M t ;< art D. Ebneter, Director

) Division of Reactor Safety

Enclosure:

NRC Region I Inspection Report No. 50-423/85-27

,

f

0FFTCIAL RECORD COPY

1R MILLSTONE 3 85-27 - 0001.0.0

07/05/85

8 850

3

G

t

_ _ _ _ _ _ _

_ __________

.

.

Northeast Nuclear Energy Co.

2

cc w/ encl:

V. Papadopoli, Construction Quality Assurance Supervisor

E. R. Foster, Director of Generation Construction

E. J. Mroczka, Vice President, Nuclear Operations

'

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

W. D. Romberg, Station Superintendent

{

Public Document Room (PDR)

local Public Document Roem (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

bec w/ encl:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encl)

,

E. McCabe, Chief, Section #3B, RPB #3, DRP

G. Walton, SRI, Beaver Valley Unit 2

l

$W

'

RI:DRS

RI:DRS

Nicholas /mmb

Bettenhausen

Ebneter

7 jg gf

7/2}/67

?N/T

OFFICIAL RECORD COPY

IR MILLSTONE 3 85-27 - 0002.0.0

07/05/85