_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ - - _ _ - - _ _ _ | |||
. | |||
. | |||
. | |||
Docket No. | |||
50-423 | |||
Northeast Nuclear Energy Company | |||
ATTN: Mr. J. F. Opeka | |||
Senior Vice President - Nuclear | |||
Engineering and Operations Group | |||
P. O. Box 270 | |||
Hartford, Connecticut 06101 | |||
Gentlemen: | |||
. | |||
Subject: | |||
Inspection Report No. | |||
50-423/85-27 | |||
This refers to the routine safety inspection conducted by Mr. H. Nicholas of | |||
this office on June 3-7, 1985, at Millstone Nuclear Power Station, Unit 3 | |||
Waterford, Connecticut, of activities authorized by NRC License No. CPPR-113 | |||
and to the discussions of our findings held by Mr. Nicholas with Mr. J. Crockett | |||
of your staff at the conclusion of the inspection. | |||
Areas examined during this inspection are described in the NRC Regio.i I | |||
Inspection Report which is enclosed with this letter. Within these areas, the | |||
ir:spection consisted of selective examinations of procedures and representative | |||
records, interviews with personnel, and observations by tho inspector. | |||
Within the scope of this inspection, no violations were observed. | |||
No reply to this letter is required. Your cooperation with us in this matter | |||
is appreciated. | |||
Sincerely, | |||
, | |||
+ Origitul Signed By: | |||
' ,We 3. BctterJmtisen | |||
4 | |||
, | |||
M t ;< art D. Ebneter, Director | |||
) Division of Reactor Safety | |||
Enclosure: | |||
NRC Region I Inspection Report No. 50-423/85-27 | |||
, | |||
f | |||
0FFTCIAL RECORD COPY | |||
1R MILLSTONE 3 85-27 - 0001.0.0 | |||
07/05/85 | |||
8 850 | |||
3 | |||
G | |||
t | t | ||
_ _ _ _ _ _ _ | |||
_ __________ | |||
. | |||
. | |||
Northeast Nuclear Energy Co. | |||
2 | |||
cc w/ encl: | |||
V. Papadopoli, Construction Quality Assurance Supervisor | |||
E. R. Foster, Director of Generation Construction | |||
E. J. Mroczka, Vice President, Nuclear Operations | |||
' | |||
D. O. Nordquist, Manager of Quality Assurance | |||
R. T. Laudenat, Manager, Generation Facilities Licensing | |||
W. D. Romberg, Station Superintendent | |||
{ | |||
Public Document Room (PDR) | |||
local Public Document Roem (LPDR) | |||
Nuclear Safety Information Center (NSIC) | |||
NRC Senior Resident Inspector | |||
* | |||
State of Connecticut | |||
bec w/ encl: | |||
Region I Docket Room (with concurrences) | |||
Senior Operations Officer (w/o encl) | |||
, | |||
E. McCabe, Chief, Section #3B, RPB #3, DRP | |||
G. Walton, SRI, Beaver Valley Unit 2 | |||
l | l | ||
$W | |||
' | |||
RI:DRS | |||
RI:DRS | |||
Nicholas /mmb | |||
Bettenhausen | |||
Ebneter | |||
7 jg gf | |||
7/2}/67 | |||
?N/T | |||
OFFICIAL RECORD COPY | |||
IR MILLSTONE 3 85-27 - 0002.0.0 | |||
07/05/85 | |||
}} | }} | ||
Latest revision as of 09:25, 12 December 2024
| ML20133F679 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 07/24/1985 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20133F682 | List: |
| References | |
| NUDOCS 8508080388 | |
| Download: ML20133F679 (2) | |
See also: IR 05000423/1985027
Text
_-___
_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ - - _ _ - - _ _ _
.
.
.
Docket No.
50-423
Northeast Nuclear Energy Company
ATTN: Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
.
Subject:
Inspection Report No.
50-423/85-27
This refers to the routine safety inspection conducted by Mr. H. Nicholas of
this office on June 3-7, 1985, at Millstone Nuclear Power Station, Unit 3
Waterford, Connecticut, of activities authorized by NRC License No. CPPR-113
and to the discussions of our findings held by Mr. Nicholas with Mr. J. Crockett
of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Regio.i I
Inspection Report which is enclosed with this letter. Within these areas, the
ir:spection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by tho inspector.
Within the scope of this inspection, no violations were observed.
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
,
+ Origitul Signed By:
' ,We 3. BctterJmtisen
4
,
M t ;< art D. Ebneter, Director
) Division of Reactor Safety
Enclosure:
NRC Region I Inspection Report No. 50-423/85-27
,
f
0FFTCIAL RECORD COPY
1R MILLSTONE 3 85-27 - 0001.0.0
07/05/85
8 850
3
G
t
_ _ _ _ _ _ _
_ __________
.
.
Northeast Nuclear Energy Co.
2
cc w/ encl:
V. Papadopoli, Construction Quality Assurance Supervisor
E. R. Foster, Director of Generation Construction
E. J. Mroczka, Vice President, Nuclear Operations
'
D. O. Nordquist, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
W. D. Romberg, Station Superintendent
{
Public Document Room (PDR)
local Public Document Roem (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Senior Resident Inspector
State of Connecticut
bec w/ encl:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encl)
,
E. McCabe, Chief, Section #3B, RPB #3, DRP
G. Walton, SRI, Beaver Valley Unit 2
l
$W
'
RI:DRS
RI:DRS
Nicholas /mmb
Bettenhausen
Ebneter
7 jg gf
7/2}/67
?N/T
OFFICIAL RECORD COPY
IR MILLSTONE 3 85-27 - 0002.0.0
07/05/85