ML20133F679

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-423/85-27 on 850603-07.No Violation Noted
ML20133F679
Person / Time
Site: Millstone 
Issue date: 07/24/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20133F682 List:
References
NUDOCS 8508080388
Download: ML20133F679 (2)


See also: IR 05000423/1985027

Text

_-___

_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ - - _ _ - - _ _ _

.

.

.

Docket No.

50-423

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

.

Subject:

Inspection Report No.

50-423/85-27

This refers to the routine safety inspection conducted by Mr. H. Nicholas of

this office on June 3-7, 1985, at Millstone Nuclear Power Station, Unit 3

Waterford, Connecticut, of activities authorized by NRC License No. CPPR-113

and to the discussions of our findings held by Mr. Nicholas with Mr. J. Crockett

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Regio.i I

Inspection Report which is enclosed with this letter. Within these areas, the

ir:spection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by tho inspector.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

,

+ Origitul Signed By:

' ,We 3. BctterJmtisen

4

,

M t ;< art D. Ebneter, Director

) Division of Reactor Safety

Enclosure:

NRC Region I Inspection Report No. 50-423/85-27

,

f

0FFTCIAL RECORD COPY

1R MILLSTONE 3 85-27 - 0001.0.0

07/05/85

8 850

3

G

t

_ _ _ _ _ _ _

_ __________

.

.

Northeast Nuclear Energy Co.

2

cc w/ encl:

V. Papadopoli, Construction Quality Assurance Supervisor

E. R. Foster, Director of Generation Construction

E. J. Mroczka, Vice President, Nuclear Operations

'

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

W. D. Romberg, Station Superintendent

{

Public Document Room (PDR)

local Public Document Roem (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

bec w/ encl:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encl)

,

E. McCabe, Chief, Section #3B, RPB #3, DRP

G. Walton, SRI, Beaver Valley Unit 2

l

$W

'

RI:DRS

RI:DRS

Nicholas /mmb

Bettenhausen

Ebneter

7 jg gf

7/2}/67

?N/T

OFFICIAL RECORD COPY

IR MILLSTONE 3 85-27 - 0002.0.0

07/05/85