{{#Wiki_filter:. . .   --.                            - . .        .      . - _ _ - _ .        .    .  - - - -
{{#Wiki_filter:...
VIHOINIA ELECTRIC AND Powna COMi%NY Ricnwono, VIRGINIA 20261 May 7,1997 United States Nuclear Regulatory Commission                       Serial No.     97-288 Attention: Document Control Desk                                 NAPS /JHL Washington, D. C. 20555                                           Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIHOINIA ELECTRIC AND Powna COMi%NY Ricnwono, VIRGINIA 20261 May 7,1997 United States Nuclear Regulatory Commission Serial No.
VIRGINIA ELECTRIC AND POWER COMPANY NQfLIliANfMLEQWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT Enclosed is the April 1997 Monthly Operating Report for North Anna Power Station Unit 1 and 2.                                                                                   ,
97-288 Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos.
Very truly yours, DSW W. R. Matthews Station Manager                                                             I i
50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
L Enclosure
VIRGINIA ELECTRIC AND POWER COMPANY NQfLIliANfMLEQWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT Enclosed is the April 1997 Monthly Operating Report for North Anna Power Station Unit 1 and 2.
                                                                                /
Very truly yours, DSW W. R. Matthews Station Manager I
cc:     U. S. Nuclear Regulatory Commission Region II s-  Y                ;
i L
Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 NRC Senior Resident inspector North Anna Power Station 9705130068 970430 8 DR ADOCK 0500 III!llll{llllll(l[]!
Enclosure
/Y cc:
U. S. Nuclear Regulatory Commission s-Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 NRC Senior Resident inspector North Anna Power Station 9705130068 970430 DR ADOCK 0500 8
III!llll{llllll(l[]!


VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH: bpril   YEAR:   1997 Approved:
VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH: bpril YEAR:
b       w''
1997 Approved:
                              $12N     Station Manager
b w''
$12N Station Manager


  .                                                                                                                                                            j
j CPERATING DATA REP RT DOCKET No.:
          ,.        ,,                                                CPERATING DATA REP RT l
50-338 DATE: May 5, 1991 CONTACT:
DOCKET No.:         50-338 DATE: May 5, 1991 CONTACT: W. R. Matthews PHONE:     (540) 894-2101 OPERATING STATUS
W. R. Matthews PHONE:
: 1. Unit Names. .   .      . .        .      .                            North Anna 1
(540) 894-2101 OPERATING STATUS 1.
: 2. Reporting Periods...           .              .        ..                April 1997                                                                   1
Unit Names..
: 3. Licensed Thernal Power (MWtit.             .          ..                    2,893                                                                     I
North Anna 1 2.
: 4. Nameplate Rating (Gross MWe) .                     . .                          994
Reporting Periods...
: 5. Design Electrical Rating l Net Fbb) .                   .                        907                                                                   l
April 1997 1
: 6. Maximum Dependable capacity (Gross HWel s .                                       940
3.
: 7. Maximum Dependable Capacity (Net MWe) s . .                   .                  893 1
Licensed Thernal Power (MWtit.
: 8. If changes occur to Capacity Ratings (Iteps 3 thru 7) since last report, give reasonst                                               N/A               I
2,893 4.
: 9. Power level to which restricted, if any (Net Fbk):                                         N/A
Nameplate Rating (Gross MWe).
: 10. Reasons f or restrictions, if anyt                                                         N/A l
994 5.
1 l
Design Electrical Rating l Net Fbb).
1 This Month                 Y-t-D             Cumulative   l
907 6.
: 11. Hours in Reporting Period.         . . .              . . .. . . .                                  720.0               2,800.0           165,300.0 l
Maximum Dependable capacity (Gross HWel s.
: 12. Nunber of Hours Reactor was Critical .                           .                                  720.0               2,880.0           120,097.2
940 7.
: 13. Reactor Reserve Shutdown Hours.                   . .                          ..                    0.0                     0.0             7,046.0 I
Maximum Dependable Capacity (Net MWe) s..
: 14. Hours Generator On-Line.                   . .. .                                .                720.0               2,680.0           125,053.8 l
893 8.
: 15. Unit Reserve Shutdown Hours.                         .                                                0.0                     0.0                 0.0 l
If changes occur to Capacity Ratings (Iteps 3 thru 7) since last report, give reasonst N/A 9.
: 16. Gross Thermal Energy Generated it%*0 .                                 .              . . 2,019,207.4           8,325,771.9         335,906,308.5 !
Power level to which restricted, if any (Net Fbk):
17 Gross Electrical Energy Generated ( >**0 .                                           ..          681,782.0           2,728,067.0         147,310,753.0
N/A 10.
: 18. Het Electrical Energy Generated (MWH) .                         . , .                  . .      649,799.0           2,597,708.0         104,584,362.0
Reasons f or restrictions, if anyt N/A 1
: 19. Unit Service Factor.       .                            .        . .          .                      100.06                 100.04               75.7%
1 This Month Y-t-D Cumulative 11.
: 20. Unit Availability Factor.       .          . .              .                .        .            100.06                 100.0%               75.1%
Hours in Reporting Period.
: 21. Unit capacity Factor (using MDC Net) .                   .                          .              101.15                 101.04               70.8%
720.0 2,800.0 165,300.0 l
l   22. Unit Capacity Factor tusing DER Net).                                         ,                      99.54                   99.4%               69.8% '
12.
f   23. Forced Outage Rate.               . . . ...              .                                            0.0%                   0.06               8.6% l l
Nunber of Hours Reactor was Critical.
: 24. Shutdohms Scheduled Over Next 6 Months (Type, Date, Duration of Each): Scheduled Refueling Outage l       beginning May 11, 1997, duration =35 days.
720.0 2,880.0 120,097.2 13.
: 25. If Shutdown at end of Report Period, estineted time of Startup                             N/A
Reactor Reserve Shutdown Hours.
: 26. Units in Test Status (Prior to Concercial Operation):
0.0 0.0 7,046.0 I
Forecast               Achieved INITI AL CRITICALITY INITI AL ELECTPICITY Ca>94ERCIAL OPEPATION i
14.
Hours Generator On-Line.
720.0 2,680.0 125,053.8 15.
Unit Reserve Shutdown Hours.
0.0 0.0 0.0 16.
Gross Thermal Energy Generated it%*0.
2,019,207.4 8,325,771.9 335,906,308.5 17 Gross Electrical Energy Generated ( >**0.
681,782.0 2,728,067.0 147,310,753.0 18.
Het Electrical Energy Generated (MWH).
649,799.0 2,597,708.0 104,584,362.0 19.
Unit Service Factor.
100.06 100.04 75.7%
20.
Unit Availability Factor.
100.06 100.0%
75.1%
21.
Unit capacity Factor (using MDC Net).
101.15 101.04 70.8%
l 22.
Unit Capacity Factor tusing DER Net).
99.54 99.4%
69.8%
f 23.
Forced Outage Rate.
0.0%
0.06 8.6%
l 24.
Shutdohms Scheduled Over Next 6 Months (Type, Date, Duration of Each): Scheduled Refueling Outage l
beginning May 11, 1997, duration =35 days.
25.
If Shutdown at end of Report Period, estineted time of Startup N/A 26.
Units in Test Status (Prior to Concercial Operation):
Forecast Achieved INITI AL CRITICALITY INITI AL ELECTPICITY Ca>94ERCIAL OPEPATION i
l l
l l
l l
l l
1
1


    . . . _  ._    . . _ . - . _ . _. . _ . . . _ . . _ .          . . _ . . . _ _ . _ . . _ .              .  . - . _ . . .. ~ _ _ _-. .
.. ~ _ _
4 AVERAGE DAILY UNIT POWER LEVEL Docket No. :             50-338 Unit:                     NA-1 Date:             May 5, 1997
4 AVERAGE DAILY UNIT POWER LEVEL Docket No. :
50-338 Unit:
NA-1 Date:
May 5, 1997


==Contact:==
==Contact:==
W. R. Matthews Phone:               (540) 894-2101 MONTH: April 1997                                                                                                                   '
W. R. Matthews Phone:
DAY               AVERAGE DAILY POWER                                               DAY       AVERAGE DAILY POWER LEVEL (MWe-Net)                                                             LEVEL (MWe-Net) 1                                   903                                           17                   907 2                                   903                                           18                   907 3                                   903                                           19                   908 4                                   903                                           20                   907 5                                   903                                           21                   903 6                                   902                                           22                   903 7                                   902                                           23                   903 8                                   903                                           24                   903 9                                   903                                           25                   899 10                                   903                                           26                   903 11                                   903                                           27                   904 l                   12                                   903                                           28                   902 l
(540) 894-2101 MONTH: April 1997 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
13                                   903                                           29                   903 14                                   907                                           30                   903 l                   15                                   907 t
LEVEL (MWe-Net) 1 903 17 907 2
16                                   907 l
903 18 907 3
903 19 908 4
903 20 907 5
903 21 903 6
902 22 903 7
902 23 903 8
903 24 903 9
903 25 899 10 903 26 903 11 903 27 904 l
12 903 28 902 l
13 903 29 903 14 907 30 903 l
15 907 t
16 907 l
Instructions:
Instructions:
On this format, list the average daily unit power level in MWe-l                 Net for each day in the reporting month.                                                   Compute to the nearest
On this format, list the average daily unit power level in MWe-l Net for each day in the reporting month.
!                whole megawatt.
Compute to the nearest whole megawatt.
er.


      . . . _ . _ _ . ._ . . _ _ _ . . _ . . . _ _ _ - . . . . . _ . _              . . . _ - _ _ . ~ . _ . _ . . _ _ _ _ . . -    __  . _ _ . - _ _ _ _ _ . .
... _ - _ _. ~. _. _..
NORTH ANNA POWER STATION UNIT NO.:           1 MONTH: April SUte4ARY OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is _ a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
NORTH ANNA POWER STATION UNIT NO.:
1 Date                                     Time                           Data                                                                   I April 01, 1997                                         0000             Began month with unit at 100% power, 949 MWe.
1 MONTH: April SUte4ARY OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is _ a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
April 25, 1997                                         0933             Commence unit ramp down                             for performance of Turbine Valve Freedom Test                           (TVFT) from 100%
1 Date Time Data April 01, 1997 0000 Began month with unit at 100% power, 949 MWe.
power, 950 MWe.                                                                     j 1015             Unit stable at 91.9% power, 879 MWe.
April 25, 1997 0933 Commence unit ramp down for performance of Turbine Valve Freedom Test (TVFT) from 100%
1039             TVFT complete satisfactorily.                             Commence unit ramp to 100% power.
power, 950 MWe.
1153             Unit stable at 100% power, 946 MWe.
j 1015 Unit stable at 91.9% power, 879 MWe.
April 30, 1997                                         2400             Ended month with unit stable at 100% power, 949 MWe.
1039 TVFT complete satisfactorily.
Commence unit ramp to 100% power.
1153 Unit stable at 100% power, 946 MWe.
April 30, 1997 2400 Ended month with unit stable at 100% power, 949 MWe.
L l
L l
l
l
{
{
l l
l l
l,                                                                     f                                                                                         ,
l, f
I i
I i
i l
i l
Line 95: Line 150:
i
i


        ._  _. _ . _ . - .      _  _ . - _ _      ..~     . . . _ . _ . _ . - _ - - - - . - . _ - - - - - - . - . _ . . - . -  . . . . . .
..~
t
t o
:              o 6
6 i
i                                                                                            Page           1       of         1               !
Page 1
i UNIT SHUTDOWN AND POWER REDUCTIONS                                                                       i i
of 1
Explanation Sheet 4
i UNIT SHUTDOWN AND POWER REDUCTIONS i
i                                                                                                                                                i 50-338 4
i Explanation Sheet 4
Docket No.:                                                                                    i i
l                                Report Month April        Unit Name:                  NA-1                                                  !
Year: -1997        Date: May 5,            1997                                                        ,
i i
i i
e b
4 Docket No.:
50-338 i
i l
Report Month April Unit Name:
NA-1 Year: -1997 Date: May 5, 1997 i
i e
b


==Contact:==
==Contact:==
W. R. Matthews                                                                           t
W. R. Matthews t
* No entries this month.
* No entries this month.
i                                                                                                                                                ;
4 I
6 a                                                                                                                                                !
I i                                                                                                                                                i 1
l D
i
)                                                                                                                                                k 1
I                                                                                                                                              6 t
4 k
4 r
i 4
i 4
1-2 i
I 6
a I
i i
1 l
D i
)
k 1
I 6
t 4
k r
4 i
4 1-2 i
1:
1:
4 i
4 i


    ,              _ _ . . _              _    .. .-      ...,m._-       -m..-                 .m..       _.....-.-..-,_m.     .                  . . - __ _ _              .m. .._>__.._..m.m                     . . . . _ - . . .
...,m._-
j                                                                                                                                                                                                                                             - ,
-m..-
                                                      -UNIT SHUTDOWS AND POWER REDUCTIONS DOCKET NO.: 50-338                                       -
.m..
UNIT NAME: NA-1 DATE: May 5, 1997 REPORT MONTH: April 1997                                                                                     CONTACT: W. R. Matthews                                     -
_.....-.-..-,_m.
PHONE: (540) 894-2101 1                     2                             3                                   4                         5 No.     Date           Type   Duration Reason                 Method of                 Licensee           System           Component                     Cause & Corrective (hrs)                         Shutting                     Event               Code             Code                                     Action to Down Reactor                   Report i                                                             Prevent Recurrence
.m.
* No entries            this  month.
.._>__.._..m.m j
-UNIT SHUTDOWS AND POWER REDUCTIONS DOCKET NO.:
50-338 UNIT NAME:
NA-1 DATE: May 5, 1997 j
REPORT MONTH: April 1997 CONTACT: W.
R. Matthews PHONE: (540) 894-2101 l
1 2
3 4
5 i
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective f
f (hrs)
Shutting Event Code Code Action to Down Reactor Report i Prevent Recurrence r
[
f
f
                                                                                                                                                                                                                                                  't 1: Type             2: Reason                                                                             3: Method                                 4:
* No entries this month.
F= Forced           A= Equipment Failure (explain)                                                         l= Manual                                 Exhibit F - Instructions l       S= Scheduled         B= Maintenance or Test                                                                 2= Manual Scram                           for preparation of Data C= Refueling                                                                           3=Automa. tic Scram                       Entry Sheets for Licensee r
P f
D= Regulatory Restriction                                                             4= Continuations                         Event Report (LER) File E= Operator Training & License. Examination                                           5= Load Reduction                         (NUREG-0161)
't a
F= Administrative                                                                     9=Other G= Operational Error                                                                                                           5:                                                                                     i H=Other (explain)                                                                                                               Exhibit H - Same Source 4
f 1: Type 2: Reason 3: Method 4:
i
I F= Forced A= Equipment Failure (explain) l= Manual Exhibit F - Instructions l
S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3=Automa. tic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File r
E= Operator Training & License. Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
i H=Other (explain)
Exhibit H - Same Source i
4 i
i l
r T
?
r t'


i
i CPERATING DATA REPORT s
* s                                              CPERATING DATA REPORT t
t DOCKET NO.
DOCKET NO.           50-339 DATEt May 5, 1997 CONTACTt   W. R. Matthews PHONE     (540) 894-2101 CtERATING STAINS
50-339 DATEt May 5, 1997 CONTACTt W. R. Matthews PHONE (540) 894-2101 CtERATING STAINS 1.
: 1. Unit Namet.     ... .. . .          .                            North Anna 2
Unit Namet.
: 2. Reporting Periodt...     .    . .          . ... ..                  April 1991
North Anna 2 2.
: 3. Licensed Thermal Power (MWt) .                       .                      2,893
Reporting Periodt...
: 4. Nameplate Rating (Gross % )4..         .        . ..                            979
April 1991 3.
: 5. Design Electrical Rating (Net MWel ..                   . .                      907
Licensed Thermal Power (MWt).
: 6. Maximum Dependable Capacity (Gross M4e): .                                       944
2,893 4.
: 7. Maximum Dependable Capacity (Net MWe)1.               .. .                      897 l
Nameplate Rating (Gross % )4..
i
979 5.
: 8. !! changes occur to Capacity Ratings (Items 3 thru 7) since last report, give reasons:                                             N/A                   ;
Design Electrical Rating (Net MWel..
: 9. Power level to which restricted, if any (Net MWolt                                       N/A
907 6.
: 10. Reasons for restrictions, if anyt                                                         N/A This Month                 Y- t- D           Cumulative   'i
Maximum Dependable Capacity (Gross M4e):.
: 11. Hours in Reporting Period..             .              . .                . ..                  120.0               2,880.0             143,568.0     l
944 7.
: 12. Number of Hours Reactor was Critical.                             . .. .. .                        720.0               2,880.0             119,835.2     l
Maximum Dependable Capacity (Net MWe)1.
: 13. Reactor Maerve Shutdown Hours.           .            .                ..                        0.0                       0.0           7,162.2
897 i
: 14. Hours Genesstor On-Line. . .          .                .      .        .                        720.0               2,880.0             118,664.2
8.
: 15. Unit Reserve 2hutdown Hours.         .        . .                . . .                              0.0                       0.0                 0.0
!! changes occur to Capacity Ratings (Items 3 thru 7) since last report, give reasons:
: 16. Gross Thermal Entroy Generated (MWis) .           ... .. . . .                      .      2,079,415.6           8,324,016.2         323,905,934.2
N/A 9.
: 17. Gross Electrical Enery, Generated (MWH).                           . .. . .                    681,62].0           2,730,115.0         105,999,350.0 18 Net Electrical Energy Generated (MWH) .                                       . .            649,866.0           2,601,177.0         101,294,359.0     l
Power level to which restricted, if any (Net MWolt N/A 10.
: 19. Unit Service Factor.               .            .          .        . ...            .          100.06                   100.06               82.7%
Reasons for restrictions, if anyt N/A This Month Y-t- D Cumulative
: 20. Unit Availability Factor . . ..            . .  .                        . .                      100.0%                   100.04               82.74
' i 11.
: 21. Unit Capacity Factor (using MDC Net) .           . .                                              100.64                   100.7%               78.5%   i
Hours in Reporting Period..
: 22. Unit Capacity Facter (using DER Net) .           . .. .                          ...              99.5%                   99.6%               77.8%
120.0 2,880.0 143,568.0 12.
: 23.                                                                                                                                                           l Forced Outage Rate..           .        . .. . .                    .                  .            0.06                     0.0%               5.3%   1
Number of Hours Reactor was Critical.
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, Duration of facn):                                   N/A
720.0 2,880.0 119,835.2 13.
: 25. If Shutdown at end of Report Period, estirs.ated time of Startup:                         N/A
Reactor Maerve Shutdown Hours.
: 26. Units in Test Status (Prior to Coasnercial Operation):
0.0 0.0 7,162.2 14.
Forecast               Achieved INITIAL CRIT]CALITY INITIAL ELECTRICITY CC$fERCI AL OPERATION
Hours Genesstor On-Line.
720.0 2,880.0 118,664.2 15.
Unit Reserve 2hutdown Hours.
0.0 0.0 0.0 16.
Gross Thermal Entroy Generated (MWis).
2,079,415.6 8,324,016.2 323,905,934.2 17.
Gross Electrical Enery, Generated (MWH).
681,62].0 2,730,115.0 105,999,350.0 18 Net Electrical Energy Generated (MWH).
649,866.0 2,601,177.0 101,294,359.0 19.
Unit Service Factor.
100.06 100.06 82.7%
20.
Unit Availability Factor.
100.0%
100.04 82.74 21.
Unit Capacity Factor (using MDC Net).
100.64 100.7%
78.5%
i 22.
Unit Capacity Facter (using DER Net).
99.5%
99.6%
77.8%
23.
Forced Outage Rate..
0.06 0.0%
5.3%
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, Duration of facn):
N/A 25.
If Shutdown at end of Report Period, estirs.ated time of Startup:
N/A 26.
Units in Test Status (Prior to Coasnercial Operation):
Forecast Achieved INITIAL CRIT]CALITY INITIAL ELECTRICITY CC$fERCI AL OPERATION


AVERAGE DAILY UNIT POWER LEVEL Docket No.:                           50-339
AVERAGE DAILY UNIT POWER LEVEL Docket No.:
:                                                            Unit:                                 NA-2 Date:                   May 5, 1997
50-339 Unit:
NA-2 Date:
May 5, 1997


==Contact:==
==Contact:==
W. R. Matthews Phone:                     (540) 894-2101 I
W. R. Matthews Phone:
(540) 894-2101 I
MONTH: April 1997.
MONTH: April 1997.
DAY         AVERAGE DAILY POWER                             DAY   AVERAGE DAILY POWER j                       LEVEL - (MWe-Net)                                           LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER j
I 1               903                                       17                 907 2               902                                       18                 907 3               902                                       19                 908 4               901                                       20                 908 5               902                                       21                 904 6               902                                       22                 904                   4 7               902                                       23                 903                   i 8               903                                       24                 903                   l 9               904                                       25                 903                   !
LEVEL - (MWe-Net)
10                 904                                       26                 903 11                 899                                       27                 903                   l 12                 903                                       28                 902                   '
LEVEL (MWe-Net)
13                 904                                       29                 903 14                 909                                       30                 903                   i 15                 908 16                 907 Instructions:
I 1
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.                           Compute to the nearest whole megawatt.
903 17 907 2
902 18 907 3
902 19 908 4
901 20 908 5
902 21 904 6
902 22 904 4
7 902 23 903 i
8 903 24 903 9
904 25 903 10 904 26 903 11 899 27 903 12 903 28 902 13 904 29 903 14 909 30 903 i
15 908 16 907 Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
 
i s
' NORTH ANNA POWER STATION UNIT NO.:
2 MONTH: April SUt44ARY OF OPERATING EXPERIENCE Page 1 of 2 Listed below in chronological sequence is a summary of operating es:periences for this month which required load reductions or resulted in i
significant non-load related incidents.
Date Time Data-
{
i April 01, 1997 0000 Began month in Mode 1 at 100% power, 948 MWe, I
~ April 09, 1997 0710 Received Defcaming Tank Level -
High t
annunciator 2T-C3.
1010 Received water detection annunciator for l
2-GM-LS-211-3.
Investigation revealed oil in detector versus water.
1118 Commenced unit ramp per step 2.3 of 3
annunciator response 2-AR-T-B2 (Water Detector High) from 100% power, 949 MWe.
Ramping at-0.3% per hour.
1144 Performing change to annunciator response for water detector high 2-AR-T-B2 in accordance with Westinghouse memorandum stating that operation is allowed with limited amount of i
continuous oil ingress.
Ramp terminated at 97.2% power, 924 MWe.
1156 Commenced ramp to 100% power from 97%, 920
: MWe, 1236 Unit stable at 100% power, 948 MWe.
' April 11, 1997 1005 Commenced unit ramp down for Turbine Valve Freedom Test (TVFT) from 100% power, 948 MWe.
1039 Unit stable at 91% power, 875 MWe.
i 1121 TVFT complete satisfactorily.
1127 Commenced ramp to full power after TVFT from 91% power, 875 MWe.
1147 Stopped ramp at 97.5% power, 933 MWe for resolution on #4 Governor valve stroke.


i
.. - -. ~. _
* s
_ ~ -
                                            ' NORTH ANNA POWER STATION UNIT NO.:                 2 MONTH: April                                           .
NORTH ANNA POWER STATION UNIT No.:
SUt44ARY OF OPERATING EXPERIENCE                                   ,
2 i
Page 1 of 2 Listed below in chronological sequence is a summary of operating                         ,
MONTH: April SIM4ARY OF OPERATING EXPERIENCE i
es:periences for this month which required load reductions or resulted in                           i significant non-load related incidents.                                                             ;
Page 2 of 2 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date             Time                                         Data-                          {
Date Time Data April 11, 1997 1159 Recommenced ramp to 100% power.
i April 01, 1997           0000                Began month in Mode 1 at 100% power, 948 MWe,        ;
1210 Unit stable at 100% power, 942 MWe.
I
        ~ April 09, 1997          0710                Received Defcaming Tank Level -      High            t annunciator 2T-C3.                                    !
1010                Received water detection annunciator for              ,
l                                                      2-GM-LS-211-3. Investigation revealed oil in detector versus water.                                !
1118                Commenced unit ramp per step 2.3 of                  3 annunciator response 2-AR-T-B2 (Water Detector High) from 100% power, 949 MWe.      Ramping at-0.3% per hour.
1144                Performing change to annunciator response for
* water detector high 2-AR-T-B2 in accordance with Westinghouse memorandum stating that operation is allowed with limited amount of          i continuous oil ingress. Ramp terminated at 97.2% power, 924 MWe.
1156                Commenced ramp to 100% power from 97%, 920 MWe,                                                  ,
1236                Unit stable at 100% power, 948 MWe.
          ' April 11, 1997          1005                Commenced unit ramp down for Turbine Valve          l Freedom Test (TVFT) from 100% power, 948 MWe.        ;
1039                Unit stable at 91% power, 875 MWe.
i 1121                TVFT complete satisfactorily.
1127                Commenced ramp to full power after TVFT from        !
91% power, 875 MWe.                                ,
1147                Stopped ramp at 97.5% power, 933 MWe for resolution on #4 Governor valve stroke.
1
1
 
. April 30, 1997 2400 Ended month in Mode 1 at 100% power, 947 MWe.
      . . -        ._ .            -.  .-    . . - - . ~ . _          _ ~ -      . - . . - - . .. . . _ _ , . . _ _ . . - - . - . ..
4 i
NORTH ANNA POWER STATION UNIT No.: 2                                                              i MONTH: April SIM4ARY OF OPERATING EXPERIENCE i
a i
Page 2 of 2 l
Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date              Time                                  Data April 11, 1997              1159                Recommenced ramp to 100% power.
l 1210                Unit stable at 100% power, 942 MWe.                                    1
            . April 30, 1997             2400                 Ended month in Mode 1 at 100% power, 947 MWe.
4 i                                                                                                                                     a i
l I
1 i
1 i
1 4
4 l
l


  .                                                                            I i
I i
1 Page 1 of   1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet i
Page 1
Docket No.:   50-339 Report Month April Unit Name:           NA-2 Year:   1997   Date: May 5, 1997
of 1
UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-339 Report Month April Unit Name:
NA-2 Year:
1997 Date: May 5, 1997


==Contact:==
==Contact:==
W. R. Matthews No entries this month.
W. R. Matthews No entries this month.
l l;
l l
l l
I l
I l
Line 232: Line 368:
l 1
l 1


UNIT SHUTDOWS AND POWER REDUCTIONS                                                                                                                                                                                                                       .
UNIT SHUTDOWS AND POWER REDUCTIONS DOCKET NO.:
DOCKET NO.: 50-339                                                                         .
50-339 UNIT NAME:
UNIT NAME: NA-2                                                                                           <
NA-2 DATE: May 5, 1997 REPORT MONTH: April 1997 CONTACT: W. R. Matthews PHONE: (540).894-2101 l
DATE: May 5, 1997 REPORT MONTH: April 1997                                                                                                                             CONTACT: W. R. Matthews                                                                       '*
1 2
PHONE: (540).894-2101 l
3 4
1                                                                 2                           3                                                                 4                                   5 No.               Date                 Type                             Duration Reason                                   Method of                                                     . Licensee         Sfstem     Component                                                                 Cause & Corrective (hrs)                                 Shutting                                                                 Event     Code               Code                                                                                               Action to Down Reactor                                                   Report #                                                                                                   Prevent Recurrence                                                           ;
5 No.
I t
Date Type Duration Reason Method of
I
. Licensee Sfstem Component Cause & Corrective (hrs)
* N o entries                     this                           month.
Shutting Event Code Code Action to Down Reactor Report #
I 1: Type                             2: Reason                                                                                                                                                               3: Method                                                 4 F= Forced                           A= Equipment Failure (explain)                                                                                                                                         l= Manual                                                     Exhibit F - Instructions                                                                             i S= Scheduled                       B= Maintenance or Test                                                                                                                                                 2= Manual Scram                                                 for preparation of Data C= Refueling                                                                                                                                                           3= Automatic Scram                                             Entry Sheets _for Licensee                                                                           i D= Regulatory Restriction                                                                                                                                             4= Continuations                                               Event Report (LER) File                                                                               '
Prevent Recurrence I
E= Operator Training & License Examination                                                                                                                             5= Load Reduction                                                 (NUREG-0161)                                                                                       ;
t I
F= Administrative                                                                                                                                                     9-Other                                                                                                                                                             i G= Operational Error                                                                                                                                                                                                           5:
N o entries this month.
H=Other (explain)                                                                                                                                                                                                                     Exhibit H - Same Source i
I 1: Type 2: Reason 3: Method 4
F= Forced A= Equipment Failure (explain) l= Manual Exhibit F - Instructions i
S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data
{
C= Refueling 3= Automatic Scram Entry Sheets _for Licensee i
D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9-Other i
G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source i
I i
I i
f I
f I
I
I
                                                                                                                                                                                                                                                                                                                                          -              - - . . _ _ . .        __ -}}
-}}

Latest revision as of 12:21, 11 December 2024

Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2
ML20148B377
Person / Time
Site: North Anna  
Issue date: 04/30/1997
From: Matthews W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
97-288, NUDOCS 9705130068
Download: ML20148B377 (13)


Text

...

VIHOINIA ELECTRIC AND Powna COMi%NY Ricnwono, VIRGINIA 20261 May 7,1997 United States Nuclear Regulatory Commission Serial No.97-288 Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos.

50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NQfLIliANfMLEQWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT Enclosed is the April 1997 Monthly Operating Report for North Anna Power Station Unit 1 and 2.

Very truly yours, DSW W. R. Matthews Station Manager I

i L

Enclosure

/Y cc:

U. S. Nuclear Regulatory Commission s-Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 NRC Senior Resident inspector North Anna Power Station 9705130068 970430 DR ADOCK 0500 8

III!llll{llllll(l[]!

VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH: bpril YEAR:

1997 Approved:

b w

$12N Station Manager

j CPERATING DATA REP RT DOCKET No.:

50-338 DATE: May 5, 1991 CONTACT:

W. R. Matthews PHONE:

(540) 894-2101 OPERATING STATUS 1.

Unit Names..

North Anna 1 2.

Reporting Periods...

April 1997 1

3.

Licensed Thernal Power (MWtit.

2,893 4.

Nameplate Rating (Gross MWe).

994 5.

Design Electrical Rating l Net Fbb).

907 6.

Maximum Dependable capacity (Gross HWel s.

940 7.

Maximum Dependable Capacity (Net MWe) s..

893 8.

If changes occur to Capacity Ratings (Iteps 3 thru 7) since last report, give reasonst N/A 9.

Power level to which restricted, if any (Net Fbk):

N/A 10.

Reasons f or restrictions, if anyt N/A 1

1 This Month Y-t-D Cumulative 11.

Hours in Reporting Period.

720.0 2,800.0 165,300.0 l

12.

Nunber of Hours Reactor was Critical.

720.0 2,880.0 120,097.2 13.

Reactor Reserve Shutdown Hours.

0.0 0.0 7,046.0 I

14.

Hours Generator On-Line.

720.0 2,680.0 125,053.8 15.

Unit Reserve Shutdown Hours.

0.0 0.0 0.0 16.

Gross Thermal Energy Generated it%*0.

2,019,207.4 8,325,771.9 335,906,308.5 17 Gross Electrical Energy Generated ( >**0.

681,782.0 2,728,067.0 147,310,753.0 18.

Het Electrical Energy Generated (MWH).

649,799.0 2,597,708.0 104,584,362.0 19.

Unit Service Factor.

100.06 100.04 75.7%

20.

Unit Availability Factor.

100.06 100.0%

75.1%

21.

Unit capacity Factor (using MDC Net).

101.15 101.04 70.8%

l 22.

Unit Capacity Factor tusing DER Net).

99.54 99.4%

69.8%

f 23.

Forced Outage Rate.

0.0%

0.06 8.6%

l 24.

Shutdohms Scheduled Over Next 6 Months (Type, Date, Duration of Each): Scheduled Refueling Outage l

beginning May 11, 1997, duration =35 days.

25.

If Shutdown at end of Report Period, estineted time of Startup N/A 26.

Units in Test Status (Prior to Concercial Operation):

Forecast Achieved INITI AL CRITICALITY INITI AL ELECTPICITY Ca>94ERCIAL OPEPATION i

l l

l l

1

.. ~ _ _

4 AVERAGE DAILY UNIT POWER LEVEL Docket No. :

50-338 Unit:

NA-1 Date:

May 5, 1997

Contact:

W. R. Matthews Phone:

(540) 894-2101 MONTH: April 1997 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

LEVEL (MWe-Net) 1 903 17 907 2

903 18 907 3

903 19 908 4

903 20 907 5

903 21 903 6

902 22 903 7

902 23 903 8

903 24 903 9

903 25 899 10 903 26 903 11 903 27 904 l

12 903 28 902 l

13 903 29 903 14 907 30 903 l

15 907 t

16 907 l

Instructions:

On this format, list the average daily unit power level in MWe-l Net for each day in the reporting month.

Compute to the nearest whole megawatt.

er.

... _ - _ _. ~. _. _..

NORTH ANNA POWER STATION UNIT NO.:

1 MONTH: April SUte4ARY OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is _ a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

1 Date Time Data April 01, 1997 0000 Began month with unit at 100% power, 949 MWe.

April 25, 1997 0933 Commence unit ramp down for performance of Turbine Valve Freedom Test (TVFT) from 100%

power, 950 MWe.

j 1015 Unit stable at 91.9% power, 879 MWe.

1039 TVFT complete satisfactorily.

Commence unit ramp to 100% power.

1153 Unit stable at 100% power, 946 MWe.

April 30, 1997 2400 Ended month with unit stable at 100% power, 949 MWe.

L l

l

{

l l

l, f

I i

i l

4 e

i

..~

t o

6 i

Page 1

of 1

i UNIT SHUTDOWN AND POWER REDUCTIONS i

i Explanation Sheet 4

i i

4 Docket No.:

50-338 i

i l

Report Month April Unit Name:

NA-1 Year: -1997 Date: May 5, 1997 i

i e

b

Contact:

W. R. Matthews t

  • No entries this month.

i 4

I 6

a I

i i

1 l

D i

)

k 1

I 6

t 4

k r

4 i

4 1-2 i

1:

4 i

...,m._-

-m..-

.m..

_.....-.-..-,_m.

.m.

.._>__.._..m.m j

-UNIT SHUTDOWS AND POWER REDUCTIONS DOCKET NO.:

50-338 UNIT NAME:

NA-1 DATE: May 5, 1997 j

REPORT MONTH: April 1997 CONTACT: W.

R. Matthews PHONE: (540) 894-2101 l

1 2

3 4

5 i

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective f

f (hrs)

Shutting Event Code Code Action to Down Reactor Report i Prevent Recurrence r

[

f

  • No entries this month.

P f

't a

f 1: Type 2: Reason 3: Method 4:

I F= Forced A= Equipment Failure (explain) l= Manual Exhibit F - Instructions l

S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3=Automa. tic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File r

E= Operator Training & License. Examination 5= Load Reduction (NUREG-0161)

F= Administrative 9=Other G= Operational Error 5:

i H=Other (explain)

Exhibit H - Same Source i

4 i

i l

r T

?

r t'

i CPERATING DATA REPORT s

t DOCKET NO.

50-339 DATEt May 5, 1997 CONTACTt W. R. Matthews PHONE (540) 894-2101 CtERATING STAINS 1.

Unit Namet.

North Anna 2 2.

Reporting Periodt...

April 1991 3.

Licensed Thermal Power (MWt).

2,893 4.

Nameplate Rating (Gross % )4..

979 5.

Design Electrical Rating (Net MWel..

907 6.

Maximum Dependable Capacity (Gross M4e):.

944 7.

Maximum Dependable Capacity (Net MWe)1.

897 i

8.

!! changes occur to Capacity Ratings (Items 3 thru 7) since last report, give reasons:

N/A 9.

Power level to which restricted, if any (Net MWolt N/A 10.

Reasons for restrictions, if anyt N/A This Month Y-t- D Cumulative

' i 11.

Hours in Reporting Period..

120.0 2,880.0 143,568.0 12.

Number of Hours Reactor was Critical.

720.0 2,880.0 119,835.2 13.

Reactor Maerve Shutdown Hours.

0.0 0.0 7,162.2 14.

Hours Genesstor On-Line.

720.0 2,880.0 118,664.2 15.

Unit Reserve 2hutdown Hours.

0.0 0.0 0.0 16.

Gross Thermal Entroy Generated (MWis).

2,079,415.6 8,324,016.2 323,905,934.2 17.

Gross Electrical Enery, Generated (MWH).

681,62].0 2,730,115.0 105,999,350.0 18 Net Electrical Energy Generated (MWH).

649,866.0 2,601,177.0 101,294,359.0 19.

Unit Service Factor.

100.06 100.06 82.7%

20.

Unit Availability Factor.

100.0%

100.04 82.74 21.

Unit Capacity Factor (using MDC Net).

100.64 100.7%

78.5%

i 22.

Unit Capacity Facter (using DER Net).

99.5%

99.6%

77.8%

23.

Forced Outage Rate..

0.06 0.0%

5.3%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, Duration of facn):

N/A 25.

If Shutdown at end of Report Period, estirs.ated time of Startup:

N/A 26.

Units in Test Status (Prior to Coasnercial Operation):

Forecast Achieved INITIAL CRIT]CALITY INITIAL ELECTRICITY CC$fERCI AL OPERATION

AVERAGE DAILY UNIT POWER LEVEL Docket No.:

50-339 Unit:

NA-2 Date:

May 5, 1997

Contact:

W. R. Matthews Phone:

(540) 894-2101 I

MONTH: April 1997.

DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER j

LEVEL - (MWe-Net)

LEVEL (MWe-Net)

I 1

903 17 907 2

902 18 907 3

902 19 908 4

901 20 908 5

902 21 904 6

902 22 904 4

7 902 23 903 i

8 903 24 903 9

904 25 903 10 904 26 903 11 899 27 903 12 903 28 902 13 904 29 903 14 909 30 903 i

15 908 16 907 Instructions:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

i s

' NORTH ANNA POWER STATION UNIT NO.:

2 MONTH: April SUt44ARY OF OPERATING EXPERIENCE Page 1 of 2 Listed below in chronological sequence is a summary of operating es:periences for this month which required load reductions or resulted in i

significant non-load related incidents.

Date Time Data-

{

i April 01, 1997 0000 Began month in Mode 1 at 100% power, 948 MWe, I

~ April 09, 1997 0710 Received Defcaming Tank Level -

High t

annunciator 2T-C3.

1010 Received water detection annunciator for l

2-GM-LS-211-3.

Investigation revealed oil in detector versus water.

1118 Commenced unit ramp per step 2.3 of 3

annunciator response 2-AR-T-B2 (Water Detector High) from 100% power, 949 MWe.

Ramping at-0.3% per hour.

1144 Performing change to annunciator response for water detector high 2-AR-T-B2 in accordance with Westinghouse memorandum stating that operation is allowed with limited amount of i

continuous oil ingress.

Ramp terminated at 97.2% power, 924 MWe.

1156 Commenced ramp to 100% power from 97%, 920

MWe, 1236 Unit stable at 100% power, 948 MWe.

' April 11, 1997 1005 Commenced unit ramp down for Turbine Valve Freedom Test (TVFT) from 100% power, 948 MWe.

1039 Unit stable at 91% power, 875 MWe.

i 1121 TVFT complete satisfactorily.

1127 Commenced ramp to full power after TVFT from 91% power, 875 MWe.

1147 Stopped ramp at 97.5% power, 933 MWe for resolution on #4 Governor valve stroke.

.. - -. ~. _

_ ~ -

NORTH ANNA POWER STATION UNIT No.:

2 i

MONTH: April SIM4ARY OF OPERATING EXPERIENCE i

Page 2 of 2 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

Date Time Data April 11, 1997 1159 Recommenced ramp to 100% power.

1210 Unit stable at 100% power, 942 MWe.

1

. April 30, 1997 2400 Ended month in Mode 1 at 100% power, 947 MWe.

4 i

a i

1 i

4 l

I i

Page 1

of 1

UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:

50-339 Report Month April Unit Name:

NA-2 Year:

1997 Date: May 5, 1997

Contact:

W. R. Matthews No entries this month.

l l

I l

i I

l 1

UNIT SHUTDOWS AND POWER REDUCTIONS DOCKET NO.:

50-339 UNIT NAME:

NA-2 DATE: May 5, 1997 REPORT MONTH: April 1997 CONTACT: W. R. Matthews PHONE: (540).894-2101 l

1 2

3 4

5 No.

Date Type Duration Reason Method of

. Licensee Sfstem Component Cause & Corrective (hrs)

Shutting Event Code Code Action to Down Reactor Report #

Prevent Recurrence I

t I

N o entries this month.

I 1: Type 2: Reason 3: Method 4

F= Forced A= Equipment Failure (explain) l= Manual Exhibit F - Instructions i

S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data

{

C= Refueling 3= Automatic Scram Entry Sheets _for Licensee i

D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)

F= Administrative 9-Other i

G= Operational Error 5:

H=Other (explain)

Exhibit H - Same Source i

I i

f I

I

-