ML20072T735: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:.. . | {{#Wiki_filter:... | ||
4 OPERAi!NG DATA REFDR1 DOCKET NO | 4 OPERAi!NG DATA REFDR1 DOCKET NO | ||
$0-369 DATE kril 15, 1991 OPERATING STATUS COMPLETED BV R.A. Williass TELEPHONE 704 373-5907 | |||
: 1. Unit Naael McGuire 1 | : 1. Unit Naael McGuire 1 | ||
: 2. Feporting Periodt March 1,1991-March 31,1991 | : 2. Feporting Periodt March 1,1991-March 31,1991 | ||
: 3. Li:ensed Tneraal Power (MWth | : 3. Li:ensed Tneraal Power (MWth 3411 | ||
: 4. Naseplate Rating (Bross MWeh | : 4. Naseplate Rating (Bross MWeh 13056 Notes *Naseplate Rating | ||
: 5. Design Electrical Rating (Net MWe): | : 5. Design Electrical Rating (Net MWe): | ||
: 6. Maxieue Dependable Capacity (Bross MWeli | 1100 (6 toss Mie) calculated as | ||
: 7. Maxieus Dependable Capacity (Net MWeh | : 6. Maxieue Dependable Capacity (Bross MWeli 1171 1450.000MVA | ||
: 8. If Changes Occur in Capacity Ratings (ltens Nusber 3 Through 7) Since Last | .90 power | ||
: 7. Maxieus Dependable Capacity (Net MWeh 1129 f actor per Fage lii, | |||
: 8. If Changes Occur in Capacity Ratings (ltens Nusber 3 Through 7) Since Last N9RE6-0020. | |||
Report. Give Reasons: | Report. Give Reasons: | ||
: 9. Power Level To Which Restricted, if Any (Net MWeh | : 9. Power Level To Which Restricted, if Any (Net MWeh | ||
: 10. Reason For Restrictions, if any: | : 10. Reason For Restrictions, if any: | ||
This Month | This Month Yr. to-Date Cuaulative | ||
-11. Hours in Reporting Period 744,0 2160.0 81792.0 | |||
: 12. Nusber Of Hours Reactor Was Critical | : 12. Nusber Of Hours Reactor Was Critical 744,0 2083.6 57749.6 | ||
: 13. Reactor Reserve Shutdown Hours | : 13. Reactor Reserve Shutdown Hours | ||
: 15. Unit Reserve Shutdown Hours | --0-- - | ||
: 16. Bross Thersal Energy 6enerated (MWH) | - 14. Hours Benerator On-line 744.0 2077.3 57097.3 | ||
: 17. Gross Electrical Energy Benerated PWH) | : 15. Unit Reserve Shutdown Hours | ||
: 20. Unit Availability Factor | --0-- | ||
: 21. Unit Capatity Factor (Using MDC Net) | --0-- | ||
: 22. Unit Capacity Factor (Using DER Netl | --0-- | ||
: 23. Unit Forced Outage Rate | : 16. Bross Thersal Energy 6enerated (MWH) 2521731 6860370 173095932 | ||
: 17. Gross Electrical Energy Benerated PWH) 681656 2394533 59616968 18.NetElectricalEnergyBeneratedIMWH) 051763 2304819 56993007 19.UnitServicefactor 100.0 96.2 69.8 | |||
: 20. Unit Availability Factor 100.0 96.2 69.8 | |||
: 21. Unit Capatity Factor (Using MDC Net) 101.4 94.5 60.2 | |||
: 22. Unit Capacity Factor (Using DER Netl 97.0 90.4 59.0 | |||
: 23. Unit Forced Outage Rate 0.0 3.8 12.6 | |||
: 24. Shutdown Scheduled Over Next 6 Morths (Type, Date, and Duration of Eachh Nnnn | : 24. Shutdown Scheduled Over Next 6 Morths (Type, Date, and Duration of Eachh Nnnn | ||
: 25. If Shut Down At End Of Report Period. Esticated Late of Startup: | : 25. If Shut Down At End Of Report Period. Esticated Late of Startup: | ||
: 26. Units in Test Status (Prior to Coseercial Operationh | : 26. Units in Test Status (Prior to Coseercial Operationh Forecast Achieved INiilALCRITICAL!ly IN!!!ALELECTRICliY COMMERCIAL OPERA 110N 9104180238 910415 PDR ADOCK 05000369 R | ||
PDR | PDR | ||
l | l OFERATINB sAlf, REPORT DOCKE1 NO _ 50-369 LH!l McGuire 1 DATE April 15,1991 COMPLETED BY F. A, b'illlan TELEPHONE 704-373-59B7 MONTH March 1991 M1 AVERAGE CA!LY POWER LEVEL | ||
OFERATINB sAlf, REPORT DOCKE1 NO _ 50-369 LH!l | [M AVERASE DAILY F0WER LEVEL (MWe-Net) | ||
(Mwe-Net) 1 1147 | |||
[7 1147 2 | |||
1147 IB 1146 3 | |||
1146 19 1144 4 | |||
1144 20 1146 5 | |||
1145 21 1146 6 | |||
1149 22 1147 7 | |||
1167 23 | |||
!!46 8 | |||
1164 24 1147 9 | |||
ll44 25. | |||
1143 10 1145 26 1143 11 1147 27 | |||
!)47 12 1140 28 1147 13 1146 29 1136 14 1145 30 1136 15 1145 31 | |||
!!36 16 1144 | |||
a DOCKET No. 50-369 | a UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. | ||
DATE | 50-369 UNIT NAME Mwu1HE 1 DATE v4/1d/91 REPORT MONTH March 1991 COMPLETED BY s. | ||
: w. muser TELEPHONE | |||
E | ( / v41 -> / J-> / t>z (4) | ||
(5) | |||
NO | (1) 2) | ||
(1) | E HOD T | ||
A OF LICENSE CAUSE AND CORRECTIVE N | |||
4-Other (Explain) | Y S | ||
E-Operator Training & License Examination | SHUT EVENT SYS-O P | ||
F-Administrative | DURATION O | ||
DOWN REPORT TEM COMPONENT ACTION TO DATE E | |||
HOURS N | |||
R/X NO. | |||
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (3) | |||
(4) | |||
(1) | |||
(2) | |||
Method: | |||
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data F Forced Reason-2-Manual Scram EntW Sheets For Licensee B-Maintenance or test 3-Automatic Scram (ING-Ol61) ) | |||
Event Report (LER C-Refueling 4-Other (Explain) | |||
File D-Regulatoq Restriction E-Operator Training & License Examination (5) | |||
F-Administrative Exhibit I - Same Source (Explain) (Explain) | |||
G-Operator Error H-Other I | |||
1 | |||
DOCKET NO: | DOCKET NO: | ||
50 369 UNIT: | |||
McGuire 1 DATE: | |||
4/15/91 NARRATIVE | |||
==SUMMARY== | ==SUMMARY== | ||
MONTH: March 1991 McGuire Unit 1 began the month of March operating at 100% full power. | MONTH: March 1991 McGuire Unit 1 began the month of March operating at 100% full power. | ||
The unit operated at 100% full power for the entire month, and ended the month operating at 100% full power. | The unit operated at 100% full power for the entire month, and ended the month operating at 100% full power. | ||
Prepared by: S. W. Moser Telephone: | Prepared by: | ||
S. W. Moser Telephone: | |||
704-373-5762 | |||
] | ] | ||
MONTHLY REFUELING INFORMATION REQUEST 1. | |||
Facility name: McGuire, Unit 1 2. | |||
Scheduled next refueling shutdown: | |||
k | September 1991 3. | ||
Scheduled restart following refueling: November 1991 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT. | |||
k 4. | |||
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? | |||
If yes, what will these be? | If yes, what will these be? | ||
If no, has reload design and cota configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? | If no, has reload design and cota configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? | ||
5. | |||
6, | Scheduled date(s) for submitting proposed licensing action and supporting information: | ||
6, important licensing considerations (new or different design or supplier. | |||
unreviewed design or performance analysis methods, significant changes in design or new operating procedures). | unreviewed design or performance analysis methods, significant changes in design or new operating procedures). | ||
7. | |||
Number of fuel assemblies-(a) in the core: | |||
193 (b) in the spent fuel pool: | |||
443 8. | |||
Present licensed fuel pool capacity: | |||
1463 Size of requested or planned increase: | |||
9. | |||
Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 DUKE POWER COMPANY DATE: | |||
April 15, 1991 Name of | |||
==Contact:== | ==Contact:== | ||
J. A. Reavis | J. A. Reavis Phone: | ||
704-373-7567 | |||
0 9 | 0 9 | ||
DFERAllN6DATAREPORT DDCL[i ND ,,,,, _50-370 DATE ptil 15. 1991 DPEEf*TINGSTATUS | DFERAllN6DATAREPORT DDCL[i ND,,,,, _50-370 DATE ptil 15. 1991 DPEEf*TINGSTATUS COMPLETEDBY R.A. Willi u s f(LIPHDNt. 7M 37F t,907 | ||
: 1. Unit N ue: McGuire 2 | : 1. Unit N ue: McGuire 2 | ||
: 2. Reporting Feriods March 1, 1991 Natch 31, 1991 | : 2. Reporting Feriods March 1, 1991 Natch 31, 1991 | ||
: 3. Littnud Thern) Poetr (MWtil | : 3. Littnud Thern) Poetr (MWtil 3411 | ||
: 6. Nueplate Rating (Oross MWell | : 6. Nueplate Rating (Oross MWell 1305i Notes skueplate Feling 5.DesignElectricalRating(NetMWe): | ||
: 7. Mattete Dependable Capacity (Net MWe) . | 1100 (6tess MWe) calculated as 6.ManteusDependableCapacity(GrossMWelt lit! | ||
Report. Give Realous | 1450.000 MVA | ||
.90 pont | |||
l | : 7. Mattete Dependable Capacity (Net MWe). | ||
This Month | 1129 factorperFageill, B. If Changes Occur in Capctly Ratings (iten Nuotier 3 through 7) $1nce Last NUR[6-0020. | ||
Report. Give Realous 9.PowerLevelToWhichRestricted,ifAny(Netdelt 10.ReasonforRestrictions,Ifany l | |||
l This Month Yr.*to4ste Cueulative | |||
16.GrossTherulEnergyGenerated(MWH1 | !!.HoursinReportingPeriod 744.0 2160.0 62080.0 I | ||
: 17. Gross Eltctrical Energ" Benerated (MWH) | : 12. Husber Of Hours Reactor Was Critical 744.0 2160.0 46900,1 13.ReactorReserveShutdownHours | ||
~0 - | |||
: 20. Unit Availability Factor- | ~0~ | ||
: 21. Unit Captity Factor (Using MDC Net) | --0-- | ||
: 22. Unit Capacity Factor (Using Dr.R Net! | i Is. Hours Benerator On-Line 744.0 2160.0 45962.B | ||
!$. Unit Reprn Shutdown Hours | |||
~0~ | |||
' ~0-- | |||
~ 0-- | |||
16.GrossTherulEnergyGenerated(MWH1 2536062 7194935 149799726- | |||
: 17. Gross Eltctrical Energ" Benerated (MWH) 891995 2531406 52460607 | |||
- 10. Net Electrical Energy 6enerated (MilHi 659698 2439995 50304441 l9 Unit Service factor. | |||
100.0 100.0 74.0- | |||
: 20. Unit Availability Factor-100.0 100.0 74.0 | |||
: 21. Unit Captity Factor (Using MDC Net) 102.4 100.1 70.6 | |||
: 22. Unit Capacity Factor (Using Dr.R Net! | |||
97.9 95.7' 68.7 y' | |||
23.UnitForcedDotateRate_ | |||
0.0 0.0 i, 7 | |||
: 24. Shutdeen Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | : 24. Shutdeen Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | ||
None | None | ||
: 25. If Shut town At End Of Report Period. Estinated Date of Startup | : 25. If Shut town At End Of Report Period. Estinated Date of Startup | ||
: 26. Units in .iest Status (Prior to tenercial Operation): | .i | ||
: 26. Units in.iest Status (Prior to tenercial Operation): | |||
Forecast Achievec lhlilALCRITICALITY INITIAL.ELECTRICliY | |||
. COMMERCIAL OPERA 110N- | |||
1 0F(RAi!NGDATARfPORT | 1 0F(RAi!NGDATARfPORT j | ||
DOCIE1NO 50470 VNil McGuire 2 tATEAtrli 15. 1991 COMPLlif0BY - F.A. Willi 49.1 i | |||
TEttPHONC 704-37F5007 D TH,,,, %rch 1991 i | |||
LA1 AVCAAB[ DAILY t0WER L(VEL - | |||
LA1 | [11 AvfLAGE DAILY POWER LEVEL (MWe Net) | ||
(MWe Net) | (MWe-Net) | ||
I | I 1151 17 flg 2 | ||
3 | 1162 IB 11}}, | ||
3 116P 19 1159 4 | |||
1160 20 1161 5 | |||
1159 21 1155 6 | |||
j =w e- - | 1160 22 1153 7 | ||
m-- | !!60 23 Il52 0 | ||
1152-24 1159 9 | |||
1128 25 1166 10' | |||
!!50 26 1154 1159 27 1158 12' 1160-28 1156 | |||
. 13 1160 | |||
. 29 1156 14 1159 30 154 15 - | |||
1150 31 1142 | |||
'16 1156 4 | |||
j | |||
=w e-m-- | |||
-,ew e,y,-_p-ww | |||
#---+= | |||
D-w,+ | |||
&-e.. | |||
, mm e | |||
- m y-m 1- | |||
+ | |||
--T | |||
*W | |||
UNIT SHUTDOWNS AND POWER REDUCTIONS | UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. | ||
50-370 UNIT NAME MLbu1Kr. 2 DATE v4/13/ 91 REPORT MONTH March 1991 COMPLETED BY s. | |||
(4) | w. | ||
E | Must,x TELEPHONE t / v41 | ||
.s /.5-d / bz (1) 2) | |||
(4) | |||
'l t | (5) | ||
t | E HOD T | ||
A OF LICENSE N | |||
(1) | Y S | ||
SHUT EVENT SYS-CAUSE AND CORRECTIVE O | |||
C-Refueling | P DURATION O | ||
4-Other (Explain) | DOWN REPORT TEM COMPONENT ACTION TO DATE E | ||
E-Operator Training & License Examination F-Administrative | HOURS N | ||
G-Operator Error (Explain) | R/X NO. | ||
CODE CODE PREVENT RECURRENCE | |||
.NO SHUTDOWNS OR REDUCTION S i | |||
'l r | |||
t I | |||
t f | |||
r l | |||
1 (1) | |||
(2) | |||
(3) | |||
(4) | |||
I | |||
' F Forced Reason-Method: | |||
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data 1 | |||
B-Maintenance or test 2-Manual. Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Re G-Ol61)) | |||
rt (LER D-Regulatory R9striction 4-Other (Explain) | |||
File (NL E-Operator Training & License Examination F-Administrative (5) | |||
G-Operator Error (Explain) | |||
Exhibit I - Same Source H-Or.her (Explain) i i | |||
1 I | 1 I | ||
l | ? | ||
l t | |||
) | ) | ||
J DOCKET NO: 50 370 UNIT: | J DOCKET NO: | ||
50 370 UNIT: | |||
McGuire 2 DATE: | |||
4/15/91 NARRATIVE | |||
==SUMMARY== | ==SUMMARY== | ||
MONTil: March 1991 | MONTil: March 1991 | ||
''McGuire Unit 2 began the month of March operating at approximately 974-a- | |||
power for reactor protection system testing, The unit began a power | power for reactor protection system testing, The unit began a power increase at 0415 on 03/01, and reached 1006 full power at 0622 on 03/01. The unit operated at or near 100% full power for the remainder of the month. | ||
increase at 0415 on 03/01, and reached 1006 full power at 0622 on 03/01. The unit operated at or near 100% full power for the remainder of the month. | l-Prepared by: | ||
l-Prepared by: S. V. Moser Telephone: | S. V. Moser Telephone: | ||
704 373 5762 | |||
9 9 | 9 9 | ||
MONTHLY REFUELING INFORMATION REQUEST | MONTHLY REFUELING INFORMATION REQUEST 1. | ||
Facility name: McGuire Unit 2 2. | |||
Scheduled next refueling shutdown: January 1992 3. | |||
Scheduled restart following refueling: March 1992 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT. | |||
4. | |||
Will refueling or resumpt;on of operation thereafter require a technical specification change or other license amendment? | |||
If yes, what will these be? | If yes, what will these be? | ||
If no,-has reload design and core configuration been reviewed by Safety Review Committee regarding unrevieweo safety questions? | If no,-has reload design and core configuration been reviewed by Safety Review Committee regarding unrevieweo safety questions? | ||
5. | |||
Scheduled date(s) for submitting proposed licensing action and supporting information: | |||
6. | |||
: 8. . Present licensed fuel pool capacity: 1463_ | Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes.in design or new operating procedures). | ||
Size of requested or planned increase: | 7. | ||
Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: | |||
589 | |||
: 8.. Present licensed fuel pool capacity: | |||
1463_ | |||
Size of requested or planned increase: | |||
9. | |||
Projected date of last refueling which can be accommodated by present licensed capacity: | |||
December 2003 L | |||
1 l | 1 l | ||
DUKE POWER COMPANY | DUKE POWER COMPANY DATE: | ||
April 15, 1991 4 | |||
Name of | |||
==Contact:== | ==Contact:== | ||
J. A. Reavis | J. A. Reavis Phone: | ||
704-373-7567 | |||
..}} | |||
Latest revision as of 04:16, 15 December 2024
| ML20072T735 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 03/31/1991 |
| From: | Robert Williams DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20072T627 | List: |
| References | |
| NUDOCS 9104180238 | |
| Download: ML20072T735 (10) | |
Text
...
4 OPERAi!NG DATA REFDR1 DOCKET NO
$0-369 DATE kril 15, 1991 OPERATING STATUS COMPLETED BV R.A. Williass TELEPHONE 704 373-5907
- 1. Unit Naael McGuire 1
- 2. Feporting Periodt March 1,1991-March 31,1991
- 3. Li:ensed Tneraal Power (MWth 3411
- 4. Naseplate Rating (Bross MWeh 13056 Notes *Naseplate Rating
- 5. Design Electrical Rating (Net MWe):
1100 (6 toss Mie) calculated as
- 6. Maxieue Dependable Capacity (Bross MWeli 1171 1450.000MVA
.90 power
- 7. Maxieus Dependable Capacity (Net MWeh 1129 f actor per Fage lii,
- 8. If Changes Occur in Capacity Ratings (ltens Nusber 3 Through 7) Since Last N9RE6-0020.
Report. Give Reasons:
- 9. Power Level To Which Restricted, if Any (Net MWeh
- 10. Reason For Restrictions, if any:
This Month Yr. to-Date Cuaulative
-11. Hours in Reporting Period 744,0 2160.0 81792.0
- 12. Nusber Of Hours Reactor Was Critical 744,0 2083.6 57749.6
- 13. Reactor Reserve Shutdown Hours
--0-- -
- 14. Hours Benerator On-line 744.0 2077.3 57097.3
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
- 16. Bross Thersal Energy 6enerated (MWH) 2521731 6860370 173095932
- 17. Gross Electrical Energy Benerated PWH) 681656 2394533 59616968 18.NetElectricalEnergyBeneratedIMWH) 051763 2304819 56993007 19.UnitServicefactor 100.0 96.2 69.8
- 20. Unit Availability Factor 100.0 96.2 69.8
- 21. Unit Capatity Factor (Using MDC Net) 101.4 94.5 60.2
- 22. Unit Capacity Factor (Using DER Netl 97.0 90.4 59.0
- 23. Unit Forced Outage Rate 0.0 3.8 12.6
- 24. Shutdown Scheduled Over Next 6 Morths (Type, Date, and Duration of Eachh Nnnn
- 25. If Shut Down At End Of Report Period. Esticated Late of Startup:
- 26. Units in Test Status (Prior to Coseercial Operationh Forecast Achieved INiilALCRITICAL!ly IN!!!ALELECTRICliY COMMERCIAL OPERA 110N 9104180238 910415 PDR ADOCK 05000369 R
l OFERATINB sAlf, REPORT DOCKE1 NO _ 50-369 LH!l McGuire 1 DATE April 15,1991 COMPLETED BY F. A, b'illlan TELEPHONE 704-373-59B7 MONTH March 1991 M1 AVERAGE CA!LY POWER LEVEL
[M AVERASE DAILY F0WER LEVEL (MWe-Net)
(Mwe-Net) 1 1147
[7 1147 2
1147 IB 1146 3
1146 19 1144 4
1144 20 1146 5
1145 21 1146 6
1149 22 1147 7
1167 23
!!46 8
1164 24 1147 9
ll44 25.
1143 10 1145 26 1143 11 1147 27
!)47 12 1140 28 1147 13 1146 29 1136 14 1145 30 1136 15 1145 31
!!36 16 1144
a UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No.
50-369 UNIT NAME Mwu1HE 1 DATE v4/1d/91 REPORT MONTH March 1991 COMPLETED BY s.
- w. muser TELEPHONE
( / v41 -> / J-> / t>z (4)
(5)
(1) 2)
E HOD T
A OF LICENSE CAUSE AND CORRECTIVE N
Y S
SHUT EVENT SYS-O P
DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (3)
(4)
(1)
(2)
Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data F Forced Reason-2-Manual Scram EntW Sheets For Licensee B-Maintenance or test 3-Automatic Scram (ING-Ol61) )
Event Report (LER C-Refueling 4-Other (Explain)
File D-Regulatoq Restriction E-Operator Training & License Examination (5)
F-Administrative Exhibit I - Same Source (Explain) (Explain)
G-Operator Error H-Other I
1
DOCKET NO:
50 369 UNIT:
McGuire 1 DATE:
4/15/91 NARRATIVE
SUMMARY
MONTH: March 1991 McGuire Unit 1 began the month of March operating at 100% full power.
The unit operated at 100% full power for the entire month, and ended the month operating at 100% full power.
Prepared by:
S. W. Moser Telephone:
704-373-5762
]
MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name: McGuire, Unit 1 2.
Scheduled next refueling shutdown:
September 1991 3.
Scheduled restart following refueling: November 1991 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
k 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and cota configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
6, important licensing considerations (new or different design or supplier.
unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies-(a) in the core:
193 (b) in the spent fuel pool:
443 8.
Present licensed fuel pool capacity:
1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 DUKE POWER COMPANY DATE:
April 15, 1991 Name of
Contact:
J. A. Reavis Phone:
704-373-7567
0 9
DFERAllN6DATAREPORT DDCL[i ND,,,,, _50-370 DATE ptil 15. 1991 DPEEf*TINGSTATUS COMPLETEDBY R.A. Willi u s f(LIPHDNt. 7M 37F t,907
- 1. Unit N ue: McGuire 2
- 2. Reporting Feriods March 1, 1991 Natch 31, 1991
- 3. Littnud Thern) Poetr (MWtil 3411
- 6. Nueplate Rating (Oross MWell 1305i Notes skueplate Feling 5.DesignElectricalRating(NetMWe):
1100 (6tess MWe) calculated as 6.ManteusDependableCapacity(GrossMWelt lit!
1450.000 MVA
.90 pont
- 7. Mattete Dependable Capacity (Net MWe).
1129 factorperFageill, B. If Changes Occur in Capctly Ratings (iten Nuotier 3 through 7) $1nce Last NUR[6-0020.
Report. Give Realous 9.PowerLevelToWhichRestricted,ifAny(Netdelt 10.ReasonforRestrictions,Ifany l
l This Month Yr.*to4ste Cueulative
!!.HoursinReportingPeriod 744.0 2160.0 62080.0 I
- 12. Husber Of Hours Reactor Was Critical 744.0 2160.0 46900,1 13.ReactorReserveShutdownHours
~0 -
~0~
--0--
i Is. Hours Benerator On-Line 744.0 2160.0 45962.B
!$. Unit Reprn Shutdown Hours
~0~
' ~0--
~ 0--
16.GrossTherulEnergyGenerated(MWH1 2536062 7194935 149799726-
- 17. Gross Eltctrical Energ" Benerated (MWH) 891995 2531406 52460607
- 10. Net Electrical Energy 6enerated (MilHi 659698 2439995 50304441 l9 Unit Service factor.
100.0 100.0 74.0-
- 20. Unit Availability Factor-100.0 100.0 74.0
- 21. Unit Captity Factor (Using MDC Net) 102.4 100.1 70.6
- 22. Unit Capacity Factor (Using Dr.R Net!
97.9 95.7' 68.7 y'
23.UnitForcedDotateRate_
0.0 0.0 i, 7
- 24. Shutdeen Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut town At End Of Report Period. Estinated Date of Startup
.i
- 26. Units in.iest Status (Prior to tenercial Operation):
Forecast Achievec lhlilALCRITICALITY INITIAL.ELECTRICliY
. COMMERCIAL OPERA 110N-
1 0F(RAi!NGDATARfPORT j
DOCIE1NO 50470 VNil McGuire 2 tATEAtrli 15. 1991 COMPLlif0BY - F.A. Willi 49.1 i
TEttPHONC 704-37F5007 D TH,,,, %rch 1991 i
LA1 AVCAAB[ DAILY t0WER L(VEL -
[11 AvfLAGE DAILY POWER LEVEL (MWe Net)
(MWe-Net)
I 1151 17 flg 2
1162 IB 11, 3 116P 19 1159 4 1160 20 1161 5 1159 21 1155 6 1160 22 1153 7 !!60 23 Il52 0 1152-24 1159 9 1128 25 1166 10' !!50 26 1154 1159 27 1158 12' 1160-28 1156 . 13 1160 . 29 1156 14 1159 30 154 15 - 1150 31 1142 '16 1156 4 j =w e-m-- -,ew e,y,-_p-ww
- ---+=
D-w,+ &-e.. , mm e - m y-m 1- + --T
- W
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME MLbu1Kr. 2 DATE v4/13/ 91 REPORT MONTH March 1991 COMPLETED BY s. w. Must,x TELEPHONE t / v41 .s /.5-d / bz (1) 2) (4) (5) E HOD T A OF LICENSE N Y S SHUT EVENT SYS-CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE .NO SHUTDOWNS OR REDUCTION S i 'l r t I t f r l 1 (1) (2) (3) (4) I ' F Forced Reason-Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data 1 B-Maintenance or test 2-Manual. Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Re G-Ol61)) rt (LER D-Regulatory R9striction 4-Other (Explain) File (NL E-Operator Training & License Examination F-Administrative (5) G-Operator Error (Explain) Exhibit I - Same Source H-Or.her (Explain) i i 1 I ? l t
) J DOCKET NO: 50 370 UNIT: McGuire 2 DATE: 4/15/91 NARRATIVE
SUMMARY
MONTil: March 1991 McGuire Unit 2 began the month of March operating at approximately 974-a- power for reactor protection system testing, The unit began a power increase at 0415 on 03/01, and reached 1006 full power at 0622 on 03/01. The unit operated at or near 100% full power for the remainder of the month. l-Prepared by: S. V. Moser Telephone: 704 373 5762
9 9 MONTHLY REFUELING INFORMATION REQUEST 1. Facility name: McGuire Unit 2 2. Scheduled next refueling shutdown: January 1992 3. Scheduled restart following refueling: March 1992 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT. 4. Will refueling or resumpt;on of operation thereafter require a technical specification change or other license amendment? If yes, what will these be? If no,-has reload design and core configuration been reviewed by Safety Review Committee regarding unrevieweo safety questions? 5. Scheduled date(s) for submitting proposed licensing action and supporting information: 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes.in design or new operating procedures). 7. Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 589
- 8.. Present licensed fuel pool capacity:
1463_ Size of requested or planned increase: 9. Projected date of last refueling which can be accommodated by present licensed capacity: December 2003 L 1 l DUKE POWER COMPANY DATE: April 15, 1991 4 Name of
Contact:
J. A. Reavis Phone: 704-373-7567 ..}}