{{#Wiki_filter:4 TABLE 3.3-6 (Continued)                                     ', -
{{#Wiki_filter:4 TABLE 3.3-6 (Continued)
RADIATION MONITORING INSTRUMENTATION FOR PLANT OPERATIONS 5
RADIATION MONITORING INSTRUMENTATION FOR PLANT OPERATIONS 5
                              $                                                                MINIMUM
MINIMUM CHANNELS CHANNELS APPLICABLE ALARM / TRIP uoe c
                                .                                            CHANNELS           CHANNELS   APPLICABLE ALARM / TRIP uoe                 c MONITOR                                   TO TRIP / ALARM   OPERABLE   MODES       SETPOINT     ACTION               :
MONITOR TO TRIP / ALARM OPERABLE MODES SETPOINT ACTION i
g@                 5                                                                                                                 .
g@
i
5 6.
            $                $  6. Control Room Air                     1 per station     2 per       All       s 3.4 x 10"   27
Control Room Air 1 per station 2 per All s 3.4 x 10" 27 Intake Radioactivity-station pCi/ml 88 High m
          >                  -      Intake Radioactivity-                                   station                   pCi/ml 88                 m       High pg                 E       (EMF-43a and 43b) no                                                           TABLE NOTATION O$
pg E
gg                     *  -          With fuel in the fuel storage areas or fuel building.
(EMF-43a and 43b) no TABLE NOTATION O$
moo 87                     **  -
gg With fuel in the fuel storage areas or fuel building.
With irradiated fuel in the fuel storage areas or fuel building.
moo 87 With irradiated fuel in the fuel storage areas or fuel building.
4
4 Must satisfy the requirements of McGuire Selected Licensee Commitment 16.11-6.
                                  *** -          Must satisfy the requirements of McGuire Selected Licensee Commitment 16.11-6.
R ACTION STATEMENTS a
R a ACTION STATEMENTS Y' ACTION 26 - With less than the Minimum Channels OPERABLE requirement, operation may continue provided the e                   containment purge valves are maintained closed.
Y' ACTION 26 - With less than the Minimum Channels OPERABLE requirement, operation may continue provided the e
ACTION 27 - With the number of channels less than the Minimum Channel OPERABLE requirement, immediately initiate corrective actions to restore the inoperable instrument to OPERABLE status. If the inoperable instrument has not been restored to OPERABLE status within seven calendar days, a IE                                 special report shall be written detailing the cause of the inoperability, and the expected date
containment purge valves are maintained closed.
((                                 of the return to OPERABLE status of the inoperable instrument.
ACTION 27 - With the number of channels less than the Minimum Channel OPERABLE requirement, immediately initiate corrective actions to restore the inoperable instrument to OPERABLE status.
aa
If the inoperable instrument has not been restored to OPERABLE status within seven calendar days, a IE special report shall be written detailing the cause of the inoperability, and the expected date
              $$                ACTION 28 - With less than the Minimum Channels OPERABLE requirement, operation may continue for up to
((
((                                 30 days provided an appropriate portable continuous monitor with the same Alarm Setpoint is pp                                 provided in the fuel pool area. Restore the inoperable monitors to OPERABLE status within 30 days or suspend all operations involving fuel movement in the fuel building.
of the return to OPERABLE status of the inoperable instrument.
gg                 ACTION 29 - Must satisfy the ACTION requirement for Specification 3.4.6.1.
aa ACTION 28 - With less than the Minimum Channels OPERABLE requirement, operation may continue for up to
oa                                                                                                                                         ;
((
2%                 ACTION 30 - With less than the minimum channels OPERABLE requirement, operation may continue provided the
30 days provided an appropriate portable continuous monitor with the same Alarm Setpoint is pp provided in the fuel pool area.
              $~                                 Fuel Handling Ventilation Exhaust System requirements of Specification 3/4.9.11 are met.
Restore the inoperable monitors to OPERABLE status within 30 days or suspend all operations involving fuel movement in the fuel building.
_ _ _ _      _ _ - - - _ _ _            _ _ _ _        _. ._. -_}}
gg ACTION 29 - Must satisfy the ACTION requirement for Specification 3.4.6.1.
oa 2%
ACTION 30 - With less than the minimum channels OPERABLE requirement, operation may continue provided the
$~
Fuel Handling Ventilation Exhaust System requirements of Specification 3/4.9.11 are met.
... -}}

Latest revision as of 11:35, 13 December 2024

Proposed TS Page 3/4 3-42 Re Typed Record Copy
ML20092A817
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 08/07/1995
From:
DUKE POWER CO.
To:
Shared Package
ML20092A815 List:
References
NUDOCS 9509110208
Download: ML20092A817 (1)


Text

4 TABLE 3.3-6 (Continued)

RADIATION MONITORING INSTRUMENTATION FOR PLANT OPERATIONS 5

MINIMUM CHANNELS CHANNELS APPLICABLE ALARM / TRIP uoe c

MONITOR TO TRIP / ALARM OPERABLE MODES SETPOINT ACTION i

g@

5 6.

Control Room Air 1 per station 2 per All s 3.4 x 10" 27 Intake Radioactivity-station pCi/ml 88 High m

pg E

(EMF-43a and 43b) no TABLE NOTATION O$

gg With fuel in the fuel storage areas or fuel building.

moo 87 With irradiated fuel in the fuel storage areas or fuel building.

4 Must satisfy the requirements of McGuire Selected Licensee Commitment 16.11-6.

R ACTION STATEMENTS a

Y' ACTION 26 - With less than the Minimum Channels OPERABLE requirement, operation may continue provided the e

containment purge valves are maintained closed.

ACTION 27 - With the number of channels less than the Minimum Channel OPERABLE requirement, immediately initiate corrective actions to restore the inoperable instrument to OPERABLE status.

If the inoperable instrument has not been restored to OPERABLE status within seven calendar days, a IE special report shall be written detailing the cause of the inoperability, and the expected date

((

of the return to OPERABLE status of the inoperable instrument.

aa ACTION 28 - With less than the Minimum Channels OPERABLE requirement, operation may continue for up to

((

30 days provided an appropriate portable continuous monitor with the same Alarm Setpoint is pp provided in the fuel pool area.

Restore the inoperable monitors to OPERABLE status within 30 days or suspend all operations involving fuel movement in the fuel building.

gg ACTION 29 - Must satisfy the ACTION requirement for Specification 3.4.6.1.

oa 2%

ACTION 30 - With less than the minimum channels OPERABLE requirement, operation may continue provided the

$~

Fuel Handling Ventilation Exhaust System requirements of Specification 3/4.9.11 are met.

... -