ML20079F573: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:1. CONTRACT ID CODE                                    PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1              23
{{#Wiki_filter:___________
: 2. AMENDMENT/MODIFICATION NO.                                  3. EFFECTIVE DATE                        4. REQUISITION/PURCHASE REQ. NO.                          5. PROJECT NO. (If applicable)
(x) 31310019F0022 x 31310018D0002 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
P00002                                                        See Block 16C                          NRR-20-0070
2020-X0200-FEEBASED-20-20D002-1030-17-4-151-251A-17-4-151-1030 007936842 SOUTHWEST RESEARCH INSTITUTE NRCHQ WASHINGTON DC 20555-0001 MAIL STOP TWFN-07B20M ACQUISITION MANAGEMENT DIVISION US NRC - HQ NRR-20-0070 See Block 16C P00002 23 1
: 6. ISSUED BY                                            CODE  NRCHQ                                    7. ADMINISTERED BY (If other than Item 6)              CODE US NRC - HQ ACQUISITION MANAGEMENT DIVISION MAIL STOP TWFN-07B20M WASHINGTON DC 20555-0001
: 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)                                9A. AMENDMENT OF SOLICITATION NO.
(x)
SOUTHWEST RESEARCH INSTITUTE 6220 CULEBRA RD                                                                                              9B. DATED (SEE ITEM 11)
SAN ANTONIO TX 782385166 x 10A. MODIFICATION OF CONTRACT/ORDER NO.
31310018D0002 31310019F0022 10B. DATED (SEE ITEM 13)
CODE        007936842                                          FACILITY CODE                                04/12/2019
: 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers                                is extended,    is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning          ___________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
: 12. ACCOUNTING AND APPROPRIATION DATA (If required)                                              Net Increase:                                              $44,000.00 2020-X0200-FEEBASED-20-20D002-1030-17-4-151-251A-17-4-151-1030
: 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
: 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE         A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
: 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
: 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS FACILITY CODE CODE 10B. DATED (SEE ITEM 13) 10A. MODIFICATION OF CONTRACT/ORDER NO.
D. OTHER (Specify type of modification and authority)
9B. DATED (SEE ITEM 11) 9A. AMENDMENT OF SOLICITATION NO.
X            FAR 52.217-9 Option to Extend; FAR 52.232-22 Limitation of Funds; & FAR 43.103(a) Mutual Agreement E. IMPORTANT:          Contractor                    is not,  x is required to sign this document and return                  1
CODE
__________________      copies to the issuing office.
: 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
: 7. ADMINISTERED BY (If other than Item 6)
CODE
: 6. ISSUED BY PAGE OF PAGES
: 4. REQUISITION/PURCHASE REQ. NO.
: 3. EFFECTIVE DATE
: 2. AMENDMENT/MODIFICATION NO.
: 5. PROJECT NO. (If applicable)
: 1. CONTRACT ID CODE AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 04/12/2019 6220 CULEBRA RD SAN ANTONIO TX 782385166 Net Increase:
$44,000.00 CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT:
Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
FAR 52.217-9 Option to Extend; FAR 52.232-22 Limitation of Funds; & FAR 43.103(a) Mutual Agreement x
: 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
: 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
X 1
**SEE PAGE THREE (3) FOR DESCRIPTION OF MODIFICATION TO 1)INCREASE THE TASK ORDER CEILING;
**SEE PAGE THREE (3) FOR DESCRIPTION OF MODIFICATION TO 1)INCREASE THE TASK ORDER CEILING;
: 2) PROVIDE INCREMENTAL FUNDING; 3) REVISE THE COST AND PRICE SCHEDULE; 4)EXERCISE OPTION PERIOD ONE AND; 5)REVISE THE STATEMENT OF WORK TO INCLUDE THE ADDITIONAL LEVEL-OF-EFFORT REQUIRED.**
: 2) PROVIDE INCREMENTAL FUNDING; 3) REVISE THE COST AND PRICE SCHEDULE; 4)EXERCISE OPTION PERIOD ONE AND; 5)REVISE THE STATEMENT OF WORK TO INCLUDE THE ADDITIONAL LEVEL-OF-EFFORT REQUIRED.**
Task Order Base and All Options: $674,811.67 (Changed)
Task Order Base and All Options: $674,811.67 (Changed)
Total Task Order Obligated Amount:                                                                   (Changed)
Total Task Order Obligated Amount:
Task Order Total Exercised Amount:                                                                   (Changed)
(Changed)
Task Order Total Exercised Amount:
(Changed)
Current Period of Performance: 08/12/2019-03/31/2021 (Changed)
Current Period of Performance: 08/12/2019-03/31/2021 (Changed)
Ultimate Period of Performance: 08/12/2019-03/31/2022 (Unchanged)
Ultimate Period of Performance: 08/12/2019-03/31/2022 (Unchanged)
Continued ...
Continued...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) 15A. NAME AND TITLE OF SIGNER (Type or print) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED (Signature of person authorized to sign)
15A. NAME AND TITLE OF SIGNER (Type or print)                                                             16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(Signature of Contracting Officer)
JENNIFER A. DUDEK TEL: 301-415-2257                              EMAIL: Jennifer.Dudek@nrc.gov 15B. CONTRACTOR/OFFEROR                                                        15C. DATE SIGNED         16B. UNITED STATES OF AMERICA                                       16C. DATE SIGNED 03/19/2020 (Signature of person authorized to sign)                                                               (Signature of Contracting Officer)
JENNIFER A. DUDEK STANDARD FORM 30 (REV. 10-83)
NSN 7540-01-152-8070                                                                                                                                          STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243 NSN 7540-01-152-8070 Previous edition unusable Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Previous edition unusable                                                                                                                                    Prescribed by GSA FAR (48 CFR) 53.243
03/19/2020 TEL:
EMAIL:
301-415-2257 Jennifer.Dudek@nrc.gov


REFERENCE NO. OF DOCUMENT BEING CONTINUED                                     PAGE     OF CONTINUATION SHEET 31310018D0002/31310019F0022/P00002                                              2          23 NAME OF OFFEROR OR CONTRACTOR SOUTHWEST RESEARCH INSTITUTE ITEM NO.                              SUPPLIES/SERVICES            QUANTITY UNIT UNIT PRICE                  AMOUNT (A)                                       (B)                     (C)   (D)     (E)                         (F)
ITEM NO.
Period of Performance: 04/01/2019 to 03/31/2021 NSN 7540-01-152-8067                                                                           OPTIONAL FORM 336 (4-86)
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT NAME OF OFFEROR OR CONTRACTOR 2
23 CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF SOUTHWEST RESEARCH INSTITUTE (A)
(B)
(C)
(D)
(E)
(F) 31310018D0002/31310019F0022/P00002 Period of Performance: 04/01/2019 to 03/31/2021 NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
Sponsored by GSA FAR (48 CFR) 53.110


31310018D0002_31310019F0022 P00002 The purpose of this task order modification is to: 1) increase the task order base and all options ceiling by                                                 ; 2) provide incremental funding in the amount of                 , thereby increasing the obligated amount from                               ;
31310018D0002_31310019F0022 P00002 3
: 3) revise the cost and price schedule; 4) exercise Option Period 1, pursuant to FAR Clause 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000), thereby increasing the exercised task order ceiling by                                                   ; and extending the period of performance from April 01, 2020 through March 30, 2021 and; 5) revise the Statement of Work to include the additional level-of-effort required. Accordingly, the task order is hereby modified:
The purpose of this task order modification is to: 1) increase the task order base and all options ceiling by  
; 2) provide incremental funding in the amount of  
, thereby increasing the obligated amount from
: 3) revise the cost and price schedule; 4) exercise Option Period 1, pursuant to FAR Clause 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000), thereby increasing the exercised task order ceiling by  
; and extending the period of performance from April 01, 2020 through March 30, 2021 and; 5) revise the Statement of Work to include the additional level-of-effort required. Accordingly, the task order is hereby modified:
: 1) Section B.2 CONSIDERATION AND OBLIGATION TASK ORDERS (AUG 2011) is deleted in its entirety and replaced with the following:
: 1) Section B.2 CONSIDERATION AND OBLIGATION TASK ORDERS (AUG 2011) is deleted in its entirety and replaced with the following:
(a) The total ceiling of this contract for the products/services under this contract is The amount will increase upon exercise of Option Periods and/or Optional Tasks as shown in Section B.3.
(a) The total ceiling of this contract for the products/services under this contract is The amount will increase upon exercise of Option Periods and/or Optional Tasks as shown in Section B.3.
(b) This order is subject to the minimum and maximum ordering requirements set forth in the contract.
(b) This order is subject to the minimum and maximum ordering requirements set forth in the contract.
(c) The amount presently obligated with respect to this order is                 of which represents costs and               represents fixed-fee. The obligated amount shall, at no time, exceed the order ceiling as specified in paragraph (a) above. When and if the amount(s) paid and payable to the Contractor hereunder shall equal the obligated amount, the Contractor shall not be obligated to continue performance of the work unless and until the Contracting Officer shall increase the amount obligated with respect to this order, in accordance with FAR Part 43 - Modifications. Any work undertaken by the Contractor in excess of the obligated amount specified above is done so at the Contractor's sole risk and may not be reimbursed by the Government.
(c) The amount presently obligated with respect to this order is of which represents costs and represents fixed-fee. The obligated amount shall, at no time, exceed the order ceiling as specified in paragraph (a) above. When and if the amount(s) paid and payable to the Contractor hereunder shall equal the obligated amount, the Contractor shall not be obligated to continue performance of the work unless and until the Contracting Officer shall increase the amount obligated with respect to this order, in accordance with FAR Part 43 - Modifications. Any work undertaken by the Contractor in excess of the obligated amount specified above is done so at the Contractor's sole risk and may not be reimbursed by the Government.
(d) The Contractor shall comply with the provisions of FAR 52.232 Limitation of Funds, for incrementally-funded delivery orders or task orders.
(d) The Contractor shall comply with the provisions of FAR 52.232 Limitation of Funds, for incrementally-funded delivery orders or task orders.
(e) In accordance with FAR 52.216 Fixed Fee, it is the policy of the NRC to withhold payment of fee after payment of 85 percent of the fee has been paid in order to protect the Governments interest. The amount of fixed-fee withheld from the contractor will not exceed 15 percent of the total fee or $100,000, whichever is less. Accordingly, the maximum amount of fixed-fee that may be held in reserve is               .
(e) In accordance with FAR 52.216 Fixed Fee, it is the policy of the NRC to withhold payment of fee after payment of 85 percent of the fee has been paid in order to protect the Governments interest. The amount of fixed-fee withheld from the contractor will not exceed 15 percent of the total fee or $100,000, whichever is less. Accordingly, the maximum amount of fixed-fee that may be held in reserve is (End Clause)
(End Clause) 3


31310018D0002_31310019F0022 P00002
31310018D0002_31310019F0022 P00002 4
: 2) B.3 PRICE/COST SCHEDULE is deleted in its entirety and replaced with the following:
: 2) B.3 PRICE/COST SCHEDULE is deleted in its entirety and replaced with the following:
Total Cost Plus CLIN           Description                           Est Cost         Fixed Fee Fixed Fee Cost - Base Period Fee - Base Period Option Period 1 Option Period 2 Total                                                                               $674,811.67 Total Estimated Cost and Fixed-Fee breakdown by cost element per base and option task is presented below.
CLIN Description Est Cost Fixed Fee Total Cost Plus Fixed Fee Cost - Base Period Fee - Base Period Option Period 1 Option Period 2 Total
Total Estimated Estimated Amount Estimated Amount     Estimated Amount DESCRIPTION                                                                                Costs Inclusive of Base Period    Option Period 1   Option Period 2 Option Periods Total Estimated Costs and
$674,811.67 Total Estimated Cost and Fixed-Fee breakdown by cost element per base and option task is presented below.
                                                                                                  $674,811.67 Fixed-Fee
DESCRIPTION Estimated Amount Base Period Estimated Amount Option Period 1 Estimated Amount Option Period 2 Total Estimated Costs Inclusive of Option Periods Total Estimated Costs and Fixed-Fee
$674,811.67
: 3) SECTION F.1 TASK/DELIVERY ORDER PERIOD OF PERFORMANCE (SEP 2013) is deleted in its entirety and replaced with the following:
: 3) SECTION F.1 TASK/DELIVERY ORDER PERIOD OF PERFORMANCE (SEP 2013) is deleted in its entirety and replaced with the following:
This task order shall commence on April 12, 2019 and will expire on March 31, 2021. The term of this task order may be extended at the option of the Government for additional Option Periods.
This task order shall commence on April 12, 2019 and will expire on March 31, 2021. The term of this task order may be extended at the option of the Government for additional Option Periods.
If exercised, Section I.8 Clause 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) is applicable.
If exercised, Section I.8 Clause 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) is applicable.
Exercised Period (Base & Option Period One): April 12, 2019 through March 31, 2021 4
Exercised Period (Base & Option Period One): April 12, 2019 through March 31, 2021


31310018D0002_31310019F0022 P00002 Remaining Option Period:
31310018D0002_31310019F0022 P00002 5
Remaining Option Period:
Option Period Two: April 01, 2021 through March 31, 2022 (End Clause)
Option Period Two: April 01, 2021 through March 31, 2022 (End Clause)
: 4) SECTION C-Descriptions/Specifications/Statement of Work is deleted in its entirety and replaced with Attachment 1.
: 4) SECTION C-Descriptions/Specifications/Statement of Work is deleted in its entirety and replaced with Attachment 1.
All other terms and conditions of this task order remain unchanged.
All other terms and conditions of this task order remain unchanged.
5


31310018D0002_31310019F0022 P00002                                         Attachment 1 SECTION C - Descriptions/Specifications/Statement of Work COVER PAGE ADDENDUM FOR TASK ORDER STATEMENT OF WORK (SOW)
31310018D0002_31310019F0022 P00002 1
Technical Support to NRC for Observation of SSHAC Workshops and Development of Guidance Project Title                    Related to Pre-Application Geologic and Seismic Hazard Evaluations of Proposed New Nuclear Power Plant Sites Job Code/Cost Center             1030 Task Areas                       Licensing Support and Guidance Development Budget & Reporting Number         17-4-151 NRC Issuing Office               Office of Nuclear Reactor Regulation (NRR)
SECTION C - Descriptions/Specifications/Statement of Work COVER PAGE ADDENDUM FOR TASK ORDER STATEMENT OF WORK (SOW)
Fee Recoverable                   NO TAC Numbers                       N/A Docket Number                     N/A 1
Project Title Technical Support to NRC for Observation of SSHAC Workshops and Development of Guidance Related to Pre-Application Geologic and Seismic Hazard Evaluations of Proposed New Nuclear Power Plant Sites Job Code/Cost Center 1030 Task Areas Licensing Support and Guidance Development Budget & Reporting Number 17-4-151 NRC Issuing Office Office of Nuclear Reactor Regulation (NRR)
Fee Recoverable NO TAC Numbers N/A Docket Number N/A


31310018D0002_31310019F0022 P00002                                               Attachment 1 TASK ORDER STATEMENT OF WORK C.1     PROJECT TITLE Technical Support to NRC for Observation of SSHAC Workshops and Development of Guidance Related to Pre-Application Geologic and Seismic Hazard Evaluations of Proposed New Nuclear Power Plant Sites C.2   BACKGROUND To meet regulatory requirements specified in 10 CFR Part 100.23(c), an applicant shall investigate the geologic, seismic, and engineering characteristics of a site and its environs in sufficient scope and detail to permit an adequate evaluation of the proposed site; provide sufficient information to support evaluations performed to derive estimates of the Safe Shutdown Earthquake (SSE) Ground Motion; and permit adequate engineering solutions to actual or potential geologic and seismic effects at the proposed site. In addition, as specified in 10 CFR Part 100.23(d)(1), an applicant shall address the uncertainties inherent in estimates of the SSE through an appropriate analysis, such as a probabilistic seismic hazard assessment (PSHA), or suitable sensitivity analyses. Consistent with Regulatory Guide 1.208, "A Performance-Based Approach to Define the Site Specific Earthquake Ground Motion," the PSHA should allow use of multiple seismic source models to estimate the likelihood of earthquake ground motions occurring at a site and systematically take into account the uncertainties in PSHA input parameters related to seismic source characteristics, recurrence and maximum magnitude of earthquakes within a seismic source, and engineering estimates of earthquake ground motion derived from attenuation relationships. Consistent with Section 2.5.2, Vibratory Ground Motion, of NUREG-0800, Standard Review Plan, applicants evaluating earthquake potential and characterizing the associated uncertainty for sites assessed using methods other than the Central and Eastern U.S.-
31310018D0002_31310019F0022 P00002 2
TASK ORDER STATEMENT OF WORK C.1 PROJECT TITLE Technical Support to NRC for Observation of SSHAC Workshops and Development of Guidance Related to Pre-Application Geologic and Seismic Hazard Evaluations of Proposed New Nuclear Power Plant Sites C.2 BACKGROUND To meet regulatory requirements specified in 10 CFR Part 100.23(c), an applicant shall investigate the geologic, seismic, and engineering characteristics of a site and its environs in sufficient scope and detail to permit an adequate evaluation of the proposed site; provide sufficient information to support evaluations performed to derive estimates of the Safe Shutdown Earthquake (SSE) Ground Motion; and permit adequate engineering solutions to actual or potential geologic and seismic effects at the proposed site. In addition, as specified in 10 CFR Part 100.23(d)(1), an applicant shall address the uncertainties inherent in estimates of the SSE through an appropriate analysis, such as a probabilistic seismic hazard assessment (PSHA), or suitable sensitivity analyses. Consistent with Regulatory Guide 1.208, "A Performance-Based Approach to Define the Site Specific Earthquake Ground Motion," the PSHA should allow use of multiple seismic source models to estimate the likelihood of earthquake ground motions occurring at a site and systematically take into account the uncertainties in PSHA input parameters related to seismic source characteristics, recurrence and maximum magnitude of earthquakes within a seismic source, and engineering estimates of earthquake ground motion derived from attenuation relationships. Consistent with Section 2.5.2, Vibratory Ground Motion, of NUREG-0800, Standard Review Plan, applicants evaluating earthquake potential and characterizing the associated uncertainty for sites assessed using methods other than the Central and Eastern U.S.-
Seismic Source Characterization (CEUS-SSC) method and related databases, or for sites outside the CEUS, should use the Senior Seismic Hazard Analysis Committee (SSHAC) methodology, the structured process for which is described in NUREG/CR-6372, "Recommendations for Probabilistic Seismic Hazard Analysis: Guidance on Uncertainty and Use of Experts." Consistent with current practice as described in NUREG-2213, "Updated Implementation Guidelines for SSHAC Hazard Studies," the SSHAC methodology can be implemented for assessing both potential geologic and seismic hazards at a proposed site. While seismic hazard should be assessed using the SSHAC methodology and a PSHA, for certain proposed sites, an applicant may also consider implementing the SSHAC methodology to probabilistically evaluate potential non-seismic geologic hazards (e.g.,
Seismic Source Characterization (CEUS-SSC) method and related databases, or for sites outside the CEUS, should use the Senior Seismic Hazard Analysis Committee (SSHAC) methodology, the structured process for which is described in NUREG/CR-6372, "Recommendations for Probabilistic Seismic Hazard Analysis: Guidance on Uncertainty and Use of Experts." Consistent with current practice as described in NUREG-2213, "Updated Implementation Guidelines for SSHAC Hazard Studies," the SSHAC methodology can be implemented for assessing both potential geologic and seismic hazards at a proposed site. While seismic hazard should be assessed using the SSHAC methodology and a PSHA, for certain proposed sites, an applicant may also consider implementing the SSHAC methodology to probabilistically evaluate potential non-seismic geologic hazards (e.g.,
volcanism and associated volcanic processes).
volcanism and associated volcanic processes).
C.3     OBJECTIVE AND SCOPE OF WORK The objective of this task order is to acquire technical expertise from the Center for Nuclear Waste Regulatory Analyses (CNWRA), the Contractor, for supporting NRC staff during SSHAC workshops related to pre-application geologic and seismic hazard evaluations conducted by applicants for proposed new nuclear power plant sites. Specifically, the Contractor shall provide support as invited observers of SSHAC workshops conducted by applicants for the proposed nuclear power plants. The NRC Contracting Officers Representative (COR) will obtain invitations for Contractor staff and any consultants used by the Contractor to attend the workshops as observers on behalf of the NRC in conjunction with NRC staff. The Contractor shall also assist the NRC with developing guidance related to evaluating site-specific non-seismic geologic hazards. The Contractor shall conduct the work under 2
C.3 OBJECTIVE AND SCOPE OF WORK The objective of this task order is to acquire technical expertise from the Center for Nuclear Waste Regulatory Analyses (CNWRA), the Contractor, for supporting NRC staff during SSHAC workshops related to pre-application geologic and seismic hazard evaluations conducted by applicants for proposed new nuclear power plant sites. Specifically, the Contractor shall provide support as invited observers of SSHAC workshops conducted by applicants for the proposed nuclear power plants. The NRC Contracting Officers Representative (COR) will obtain invitations for Contractor staff and any consultants used by the Contractor to attend the workshops as observers on behalf of the NRC in conjunction with NRC staff. The Contractor shall also assist the NRC with developing guidance related to evaluating site-specific non-seismic geologic hazards. The Contractor shall conduct the work under  


31310018D0002_31310019F0022 P00002                                             Attachment 1 this task order in accordance with the work descriptions shown below for Tasks 1, 2, 3, and 4.
31310018D0002_31310019F0022 P00002 3
this task order in accordance with the work descriptions shown below for Tasks 1, 2, 3, and 4.
Frequent communications between Contractor staff, the NRC technical team, and the NRC COR are anticipated. Meetings between Contractor and NRC staff members will be conducted as needed. Such communications with NRC staff may result in information subject to hearing file requirements under 10 CFR Part 2. Under that circumstance, the NRC COR will identify the types of records the Contractor must provide to the NRC for inclusion in the hearing file.
Frequent communications between Contractor staff, the NRC technical team, and the NRC COR are anticipated. Meetings between Contractor and NRC staff members will be conducted as needed. Such communications with NRC staff may result in information subject to hearing file requirements under 10 CFR Part 2. Under that circumstance, the NRC COR will identify the types of records the Contractor must provide to the NRC for inclusion in the hearing file.
Tasks 1, 2, and 3 under this task order shall be conducted to provide technical support to NRC staff for observation of pre-application SSHAC studies performed by applicants for proposed new nuclear power plant sites. Certain proposed sites could exhibit geologic features and processes or seismic characteristics that require specialized technical expertise to provide deeper insight to NRC staff regarding an applicants approach to implementing the SSHAC methodology for addressing potential hazards related to those features, processes, and characteristics. In those instances, as requested by the NRC, the Contractor shall use qualified personnel having the essential specialized technical expertise as specified in Section C.8 of this SOW. The Contractor shall coordinate closely with the NRC COR to ensure that Tasks 1, 2, and 3 are successfully executed and that all associated deliverables are appropriate and provide timely insight to NRC staff for assessing an applicants pre-application geologic and seismic hazard evaluations for proposed new nuclear power plants.
Tasks 1, 2, and 3 under this task order shall be conducted to provide technical support to NRC staff for observation of pre-application SSHAC studies performed by applicants for proposed new nuclear power plant sites. Certain proposed sites could exhibit geologic features and processes or seismic characteristics that require specialized technical expertise to provide deeper insight to NRC staff regarding an applicants approach to implementing the SSHAC methodology for addressing potential hazards related to those features, processes, and characteristics. In those instances, as requested by the NRC, the Contractor shall use qualified personnel having the essential specialized technical expertise as specified in Section C.8 of this SOW. The Contractor shall coordinate closely with the NRC COR to ensure that Tasks 1, 2, and 3 are successfully executed and that all associated deliverables are appropriate and provide timely insight to NRC staff for assessing an applicants pre-application geologic and seismic hazard evaluations for proposed new nuclear power plants.
Task 4 under this task order shall be conducted to provide technical support to NRC staff regarding preparation of guidance on addressing volcanism and associated volcanic processes at sites where volcanic features are present because volcanism and volcanic processes can create natural geologic hazards. The guidance will assist the NRC with assessing an applicants pre-application treatment of potential site-specific hazards related to volcanic features and processes. The guidance shall directly address volcanic features and associated processes that occur at a site for a proposed new nuclear power plant and include a detailed discussion of an acceptable approach for evaluating volcanic hazards at the site. The discussion shall include recommendations for an initial screening rationale focused on identification of potentially hazardous volcanic sources; specification of data necessary for adequately characterizing the potential hazard from those sources; definition of the potentially hazardous event based on probability of occurrence; and evaluation of the potential hazard based on a probabilistic hazard assessment. The NRC envisions that this guidance will be finally produced as a Regulatory Guide with assistance from the Office of Nuclear Regulatory Research (RES). Preparation of the guidance shall involve a qualified technical specialist in volcanology who has the knowledge and experience necessary to provide deeper insight to NRC staff regarding an applicants approach to addressing potential hazards related to site-specific volcanism and associated volcanic processes, including adequacy of the applicants characterization of volcanic features and processes at the site.
Task 4 under this task order shall be conducted to provide technical support to NRC staff regarding preparation of guidance on addressing volcanism and associated volcanic processes at sites where volcanic features are present because volcanism and volcanic processes can create natural geologic hazards. The guidance will assist the NRC with assessing an applicants pre-application treatment of potential site-specific hazards related to volcanic features and processes. The guidance shall directly address volcanic features and associated processes that occur at a site for a proposed new nuclear power plant and include a detailed discussion of an acceptable approach for evaluating volcanic hazards at the site. The discussion shall include recommendations for an initial screening rationale focused on identification of potentially hazardous volcanic sources; specification of data necessary for adequately characterizing the potential hazard from those sources; definition of the potentially hazardous event based on probability of occurrence; and evaluation of the potential hazard based on a probabilistic hazard assessment. The NRC envisions that this guidance will be finally produced as a Regulatory Guide with assistance from the Office of Nuclear Regulatory Research (RES). Preparation of the guidance shall involve a qualified technical specialist in volcanology who has the knowledge and experience necessary to provide deeper insight to NRC staff regarding an applicants approach to addressing potential hazards related to site-specific volcanism and associated volcanic processes, including adequacy of the applicants characterization of volcanic features and processes at the site.
The Contractor shall coordinate closely with the NRC COR to ensure that Task 4 is successfully executed and that all associated deliverables are appropriate and timely to support NRCs development of the draft and final versions of the guidance document on volcanic hazards. Development of the draft and final guidance shall involve support from the Contractor, as requested by the NRC, to assist NRC staff with internal briefings as well as incorporating stakeholder comments on the draft guidance into the final guidance document. The Contractor shall, as requested by the NRC, assist with planning, 3
The Contractor shall coordinate closely with the NRC COR to ensure that Task 4 is successfully executed and that all associated deliverables are appropriate and timely to support NRCs development of the draft and final versions of the guidance document on volcanic hazards. Development of the draft and final guidance shall involve support from the Contractor, as requested by the NRC, to assist NRC staff with internal briefings as well as incorporating stakeholder comments on the draft guidance into the final guidance document. The Contractor shall, as requested by the NRC, assist with planning,  


31310018D0002_31310019F0022 P00002                                               Attachment 1 organizing, and facilitating public meetings to allow discussion of stakeholder comments on the draft guidance, as well as documenting the discussions that occur during the meetings in summary reports.
31310018D0002_31310019F0022 P00002 4
organizing, and facilitating public meetings to allow discussion of stakeholder comments on the draft guidance, as well as documenting the discussions that occur during the meetings in summary reports.
The technical expert in volcanology will be expected to participate in those public meetings as requested by the NRC.
The technical expert in volcanology will be expected to participate in those public meetings as requested by the NRC.
C.4 SPECIFIC TASKS Task 1 - Prepare for Observation of SSHAC Workshops (Anticipated in the Base Year and Option Year 1)
C.4 SPECIFIC TASKS Task 1 - Prepare for Observation of SSHAC Workshops (Anticipated in the Base Year and Option Year 1)
Line 104: Line 127:
Travel by the Contractor will occur in accordance with the applicants schedules for kickoff meetings, SSHAC workshops, related meetings (e.g., the final Participatory Peer Review Panel, or PPRP briefing), and geologic site visits to locations determined by the applicant. The NRC COR will approve all travel by the Contractor.
Travel by the Contractor will occur in accordance with the applicants schedules for kickoff meetings, SSHAC workshops, related meetings (e.g., the final Participatory Peer Review Panel, or PPRP briefing), and geologic site visits to locations determined by the applicant. The NRC COR will approve all travel by the Contractor.
Subtask 2a: Participate in SSHAC kickoff meetings for SSHAC studies during the Base Year and Option Year 1 to support NRC staff during the pre-application evaluations of geologic and seismic hazards performed by applicants, as described above for Task 2.
Subtask 2a: Participate in SSHAC kickoff meetings for SSHAC studies during the Base Year and Option Year 1 to support NRC staff during the pre-application evaluations of geologic and seismic hazards performed by applicants, as described above for Task 2.
4


31310018D0002_31310019F0022 P00002                                                 Attachment 1 Subtask 2b: Participate in SSHAC workshops and geologic site visits during the Base Year and Option Years 1and 2 to support NRC staff during the pre-application evaluations of geologic and seismic hazards performed by applicants, as described above for Task 2.
31310018D0002_31310019F0022 P00002 5
Subtask 2b: Participate in SSHAC workshops and geologic site visits during the Base Year and Option Years 1and 2 to support NRC staff during the pre-application evaluations of geologic and seismic hazards performed by applicants, as described above for Task 2.
Subtask 2c: Participate in SSHAC final PPRP briefings, most likely in Option Year 2, to support NRC staff during the pre-application evaluations of geologic and seismic hazards performed by applicants, as described above for Task 2.
Subtask 2c: Participate in SSHAC final PPRP briefings, most likely in Option Year 2, to support NRC staff during the pre-application evaluations of geologic and seismic hazards performed by applicants, as described above for Task 2.
Task 3 - Prepare Summary Reports for Kickoff Meetings, SSHAC Workshops and Related Meetings, and Geologic Site Visits (Anticipated in the Base Year and Option Years 1 and 2)
Task 3 - Prepare Summary Reports for Kickoff Meetings, SSHAC Workshops and Related Meetings, and Geologic Site Visits (Anticipated in the Base Year and Option Years 1 and 2)
Line 114: Line 137:
Preparation of these reports that combine information from all individual reports prepared for each plant site is anticipated during Option Years 1 and 2. No travel is required for Subtask 3b.
Preparation of these reports that combine information from all individual reports prepared for each plant site is anticipated during Option Years 1 and 2. No travel is required for Subtask 3b.
Task 4 - Support Development of Guidance for Assessing Potential Hazards Related to Volcanism and Associated Volcanic Processes at Proposed Sites Exhibiting Volcanic Features (Anticipated in the Base Year and Option Years 1 and 2)
Task 4 - Support Development of Guidance for Assessing Potential Hazards Related to Volcanism and Associated Volcanic Processes at Proposed Sites Exhibiting Volcanic Features (Anticipated in the Base Year and Option Years 1 and 2)
Subtask 4a (Base Year) - Prepare Initial Draft Guidance (DG-1): During the Base Year (01 April 2019 to 31 March 2020), the Contractor shall support the NRC with preparation of initial draft guidance (DG-1) that presents a risk-informed, graded approach for assessment of potential hazards resulting from volcanism and associated volcanic processes at proposed sites where volcanic features are present. Preparation of DG-1 shall involve a technical expert with specific expertise in volcanology. The Contractor shall participate in writing sessions and public meetings with NRC staff and stakeholders that are related to preparing the guidance. These meetings will likely be held at or near NRC headquarters in Rockville, MD. The Contractor shall assist NRC staff with preparing DG-1 for stakeholder review, as requested, to enable the NRC to submit this initial 5
Subtask 4a (Base Year) - Prepare Initial Draft Guidance (DG-1): During the Base Year (01 April 2019 to 31 March 2020), the Contractor shall support the NRC with preparation of initial draft guidance (DG-1) that presents a risk-informed, graded approach for assessment of potential hazards resulting from volcanism and associated volcanic processes at proposed sites where volcanic features are present. Preparation of DG-1 shall involve a technical expert with specific expertise in volcanology. The Contractor shall participate in writing sessions and public meetings with NRC staff and stakeholders that are related to preparing the guidance. These meetings will likely be held at or near NRC headquarters in Rockville, MD. The Contractor shall assist NRC staff with preparing DG-1 for stakeholder review, as requested, to enable the NRC to submit this initial  


31310018D0002_31310019F0022 P00002                                               Attachment 1 draft for required public comment in a timely manner. It is anticipated that DG-1 will be prepared and issued for formal stakeholder comment by the end of the Base Year. Prior to release of DG-1 for formal comment by stakeholders, the Contractor shall assist NRC staff with preparing materials for internal management briefings and a preliminary public meeting, provide support for internal management briefings and the preliminary public meeting, and develop an initial draft outline showing planned content of DG-1, as requested by the NRC. If stakeholder comments are received on the initial draft outline for DG-1, the Contractor shall assist with reviewing and addressing the comments, as requested. In addition, the Contractor shall assist with responses to internal comments and commensurate updates to DG-1 and provide support for Advisory Committee on Reactor Safeguards (ACRS) briefings to both the Subcommittee and Full Committee, as requested. Following ACRS briefings, the Contractor shall assist with addressing ACRS comments as requested.
31310018D0002_31310019F0022 P00002 6
draft for required public comment in a timely manner. It is anticipated that DG-1 will be prepared and issued for formal stakeholder comment by the end of the Base Year. Prior to release of DG-1 for formal comment by stakeholders, the Contractor shall assist NRC staff with preparing materials for internal management briefings and a preliminary public meeting, provide support for internal management briefings and the preliminary public meeting, and develop an initial draft outline showing planned content of DG-1, as requested by the NRC. If stakeholder comments are received on the initial draft outline for DG-1, the Contractor shall assist with reviewing and addressing the comments, as requested. In addition, the Contractor shall assist with responses to internal comments and commensurate updates to DG-1 and provide support for Advisory Committee on Reactor Safeguards (ACRS) briefings to both the Subcommittee and Full Committee, as requested. Following ACRS briefings, the Contractor shall assist with addressing ACRS comments as requested.
Subtask 4b (Option Year 1) - Update DG-1 to Draft Guidance Version 2 (DG-2): During Option Year 1 (01 April 2020 to 31 March 2021), the Contractor shall assist the NRC with reviewing and responding to stakeholder comments on DG-1 after the public comment period closes. Comments are expected from a range of stakeholders, including industry representatives. The Contractor shall participate in the public meeting to discuss stakeholder comments on DG-1, as requested, and assist the NRC with preparation of GD-2 that incorporates those comments. It is anticipated that DG-2 will be prepared late in Option Year 1. Incorporation of stakeholder comments into DG-2 will possibly include at least one writing session to be held at or near NRC headquarters in Rockville, MD.
Subtask 4b (Option Year 1) - Update DG-1 to Draft Guidance Version 2 (DG-2): During Option Year 1 (01 April 2020 to 31 March 2021), the Contractor shall assist the NRC with reviewing and responding to stakeholder comments on DG-1 after the public comment period closes. Comments are expected from a range of stakeholders, including industry representatives. The Contractor shall participate in the public meeting to discuss stakeholder comments on DG-1, as requested, and assist the NRC with preparation of GD-2 that incorporates those comments. It is anticipated that DG-2 will be prepared late in Option Year 1. Incorporation of stakeholder comments into DG-2 will possibly include at least one writing session to be held at or near NRC headquarters in Rockville, MD.
Subtask 4c (Option Years 1 and 2) - Update DG-2: If the NRC determines that there is a need to conduct a public meeting to discuss stakeholder comments on DG-2, the Contractor shall participate in that meeting, as requested. DG-2 will undergo internal review and concurrence at the NRC, and the Contractor shall assist with responding to concurrence comments and updating DG-2, as requested. In addition, once DG-2 is released for use by applicants, staff will elicit comments to determine whether DG-2 should be updated further. As requested, the Contractor shall assist the NRC with incorporating comments from applicants into DG-2. It is anticipated that any necessary revisions to update DG-2 will be done during Option Years 1 (01 April 2020 to 31 March 2021) and 2 (01 April 2021 to 31 March 2022).
Subtask 4c (Option Years 1 and 2) - Update DG-2: If the NRC determines that there is a need to conduct a public meeting to discuss stakeholder comments on DG-2, the Contractor shall participate in that meeting, as requested. DG-2 will undergo internal review and concurrence at the NRC, and the Contractor shall assist with responding to concurrence comments and updating DG-2, as requested. In addition, once DG-2 is released for use by applicants, staff will elicit comments to determine whether DG-2 should be updated further. As requested, the Contractor shall assist the NRC with incorporating comments from applicants into DG-2. It is anticipated that any necessary revisions to update DG-2 will be done during Option Years 1 (01 April 2020 to 31 March 2021) and 2 (01 April 2021 to 31 March 2022).
Subtask 4d (Option Year 2) - Prepare Final Regulatory Guide: Once the ANS 2.34 standard titled Characterization and Probabilistic Analysis of Volcanic Hazards is completed, staff will review and consider endorsing the standard. If endorsed, NRC anticipates incorporating the standard, as appropriate, and publishing the final guidance as a Regulatory Guide near the end of Option Year 2 (01 April 2021 to 31 March 2022). The Contractor shall assist NRC staff with updating the final guidance based on any additional comments from stakeholders, preparing the Regulatory Guide for internal concurrence and updating the Regulatory Guide accordingly, and briefing the ACRS, should the briefing be scheduled, if requested. To produce the final Regulatory Guide, NRC anticipates possibly holding a public meeting, an internal working meeting, and a final writing session. These various meetings are expected to be held at or near NRC headquarters in Rockville, MD, if they occur.
Subtask 4d (Option Year 2) - Prepare Final Regulatory Guide: Once the ANS 2.34 standard titled Characterization and Probabilistic Analysis of Volcanic Hazards is completed, staff will review and consider endorsing the standard. If endorsed, NRC anticipates incorporating the standard, as appropriate, and publishing the final guidance as a Regulatory Guide near the end of Option Year 2 (01 April 2021 to 31 March 2022). The Contractor shall assist NRC staff with updating the final guidance based on any additional comments from stakeholders, preparing the Regulatory Guide for internal concurrence and updating the Regulatory Guide accordingly, and briefing the ACRS, should the briefing be scheduled, if requested. To produce the final Regulatory Guide, NRC anticipates possibly holding a public meeting, an internal working meeting, and a final writing session. These various meetings are expected to be held at or near NRC headquarters in Rockville, MD, if they occur.
6


31310018D0002_31310019F0022 P00002                                                   Attachment 1 C.5 APPLICABLE DOCUMENT AND STANDARDS The following regulatory requirements and guidance are applicable to this task order and can be found at http://www.nrc.gov/reading-rm/doc-collections. If necessary, any references that are not available at this website will be provided to the Contractor by the NRC COR.
31310018D0002_31310019F0022 P00002 7
C.5 APPLICABLE DOCUMENT AND STANDARDS The following regulatory requirements and guidance are applicable to this task order and can be found at http://www.nrc.gov/reading-rm/doc-collections. If necessary, any references that are not available at this website will be provided to the Contractor by the NRC COR.
: 1. 10 CFR Part 100.23, Reactor Site Criteria - Geologic and Seismic Siting Criteria, 81 FR 86910, issued December 2016
: 1. 10 CFR Part 100.23, Reactor Site Criteria - Geologic and Seismic Siting Criteria, 81 FR 86910, issued December 2016
: 2. Regulatory Guide 1.208, "A Performance-Based Approach to Define the Site-Specific Earthquake Ground Motion," issued March 2007
: 2. Regulatory Guide 1.208, "A Performance-Based Approach to Define the Site-Specific Earthquake Ground Motion," issued March 2007
Line 128: Line 152:
: 4. NUREG/CR-6372, Recommendations for Probabilistic Seismic Hazard Analysis: Guidance on Uncertainty and Use of Experts, issued April 1997
: 4. NUREG/CR-6372, Recommendations for Probabilistic Seismic Hazard Analysis: Guidance on Uncertainty and Use of Experts, issued April 1997
: 5. NUREG-2213, Updated Implementation Guidelines for SSHAC Hazard Studies, issued October 2018 C.6 DELIVERABLES AND DELIVERY SCHEDULE Project deliverables for this task order are shown in the following table. All deliverables shall be submitted to the NRC COR electronically in the media indicated. The following identification information shall be included in all written deliverables:
: 5. NUREG-2213, Updated Implementation Guidelines for SSHAC Hazard Studies, issued October 2018 C.6 DELIVERABLES AND DELIVERY SCHEDULE Project deliverables for this task order are shown in the following table. All deliverables shall be submitted to the NRC COR electronically in the media indicated. The following identification information shall be included in all written deliverables:
Job Code/Cost Center Name of Applicant Plant Name Plant Site Name 7
Job Code/Cost Center Name of Applicant Plant Name Plant Site Name


31310018D0002_31310019F0022 P00002                                                             Attachment 1 C.7     DELIVERABLES AND MILESTONES SC Task and         Description of Deliverables and               Estimated           Required Media     Anticipated Subtask                      Milestones                    Completion Dates        for Deliverables     Timing for Numbers                                                      for Deliverables                              Tasks and Milestones Review appropriate regulatory                   1 week after            No formal          Task 1 Task 1 requirements and guidance; any pre-             authorization of        deliverables for  extends application information provided by the          work or as              Task 1            through the applicant; the applicants SSHAC project         directed by the                            Base Year plans, if available; NRC Regulatory Guide       NRC COR                                    into Option 1.208; NUREG/CR-6372; and NUREG-                                                             Year 1 2213.
31310018D0002_31310019F0022 P00002 8
Task 2,     In concert with NRC staff as                     Dates for meetings      Deliverables      Subtasks 2a-Subtasks 2a invited observers, attend all                   and field trips will be related to Task 2  2c extend through 2c SSHAC kickoff meetings,                           set by the applicant are defined            through the workshops, and related meetings                                           below under        Base Year (e.g., the PPRP final briefing, if                                       Subtasks 3a and    into Option held) for each proposed plant site                                       3b of Task 3      Years 1 and as well as geologic field trips                                                             2 organized by the applicant.
C.7 DELIVERABLES AND MILESTONES SC Task and Subtask Numbers Description of Deliverables and Milestones Estimated Completion Dates for Deliverables and Milestones Required Media for Deliverables Anticipated Timing for Tasks Task 1 Review appropriate regulatory requirements and guidance; any pre-application information provided by the applicant; the applicants SSHAC project plans, if available; NRC Regulatory Guide 1.208; NUREG/CR-6372; and NUREG-2213.
Summary reports based on observations made       2 weeks after            Electronic reports Subtask 3a during each SSHAC kickoff meeting, workshop,     completion of the        to the NRC in      extends and related meeting conducted for each           SSHAC workshop or Microsoft Word          through the proposed nuclear power plant site as well as     related meeting                            Base Year Task 3,                                                                                                  into Option Subtask 3a during geologic field trips organized by the                                                 Years 1 and 2 applicant.
1 week after authorization of work or as directed by the NRC COR No formal deliverables for Task 1 Task 1 extends through the Base Year into Option Year 1 Task 2, Subtasks 2a through 2c In concert with NRC staff as invited observers, attend all SSHAC kickoff meetings, workshops, and related meetings (e.g., the PPRP final briefing, if held) for each proposed plant site as well as geologic field trips organized by the applicant.
2 weeks after receipt of comments from the NRC COR Revised summary reports for SSHAC workshops, Final summary report combining all reports for 4 weeks after the          Electronic reports Subtask 3b related meetings, and geologic field trips individual SSHAC kickoff meetings, workshops, final SSHAC                to the NRC in      extends related meetings, and geologic field trips for   workshop or related Microsoft Word        through each proposed nuclear power plant site.         meeting for each                            Option Years Task 3,                                                      site                                        1 and 2 Subtask 3b Revised final summary report combining all individual SSHAC reports for each proposed nuclear power plant site.               2 weeks after receipt of comments from Assist the NRC with preparation of initial draft DG-1 the NRCincorporating COR            Email to the NRC Subtask 4a guidance (DG-1) addressing assessment of         all comments            COR that          extends potential hazards resulting from volcanic       should be ready to summarizes what through the features and associated volcanic processes       send for formal          was done to        Base Year Task 4,    that incorporates comments from NRC staff,       comment    by  the  end assist the NRC Subtask 4a external stakeholders (if provided), and the     of the Base Year        with Subtask 4a ACRS for sending DG-1 out for formal                                     (RES will produce the version of comment by all interested stakeholders.
Dates for meetings and field trips will be set by the applicant Deliverables related to Task 2 are defined below under Subtasks 3a and 3b of Task 3 Subtasks 2a-2c extend through the Base Year into Option Years 1 and 2
DG-1 for public comment.)
Task 3, Subtask 3a Summary reports based on observations made during each SSHAC kickoff meeting, workshop, and related meeting conducted for each proposed nuclear power plant site as well as during geologic field trips organized by the applicant.
8
Revised summary reports for SSHAC workshops, related meetings, and geologic field trips 2 weeks after completion of the SSHAC workshop or related meeting 2 weeks after receipt of comments from the NRC COR Electronic reports to the NRC in Microsoft Word Subtask 3a extends through the Base Year into Option Years 1 and 2 Task 3, Subtask 3b Final summary report combining all reports for individual SSHAC kickoff meetings, workshops, related meetings, and geologic field trips for each proposed nuclear power plant site.
Revised final summary report combining all individual SSHAC reports for each proposed nuclear power plant site.
4 weeks after the final SSHAC workshop or related meeting for each site 2 weeks after receipt of comments from the NRC COR Electronic reports to the NRC in Microsoft Word Subtask 3b extends through Option Years 1 and 2 Task 4, Subtask 4a Assist the NRC with preparation of initial draft guidance (DG-1) addressing assessment of potential hazards resulting from volcanic features and associated volcanic processes that incorporates comments from NRC staff, external stakeholders (if provided), and the ACRS for sending DG-1 out for formal comment by all interested stakeholders.
DG-1 incorporating all comments should be ready to send for formal comment by the end of the Base Year Email to the NRC COR that summarizes what was done to assist the NRC with Subtask 4a (RES will produce the version of DG-1 for public comment.)
Subtask 4a extends through the Base Year


31310018D0002_31310019F0022 P00002                                                     Attachment 1 Task and           Description of Deliverables and           Estimated       Required Media         Anticipated Subtask                    Milestones                  Completion Dates    for Deliverables       Timing of Numbers                                                    for Deliverables                            Tasks and Milestones Participate with NRC staff in a public         DG-2 incorporating Email to the NRC Subtask 4b meeting to discuss stakeholder comments       all comments      COR that            extends into on DG-1. Assist the NRC with reviewing         should be          summarizes what Option Year 1 Task 4,    and responding to stakeholder comments         completed in      was done to assist Subtask 4b on DG-1 and preparing a second version of     Option Year 1      the NRC with the draft guidance (DG-2) that incorporates                       Subtask 4b (RES stakeholder comments.                                            will produce DG-2.)
31310018D0002_31310019F0022 P00002 9
Assist the NRC with updating DG-2 based       Updated DG-2      Email to the NRC    Subtask 4c on comments from internal reviewers and       incorporating all  COR that            extends into late interested stakeholders, including             comments should    summarizes what      Option Year 1 participation in a public meeting, if held, to be completed in    was done to assist  and possibly into Task 4,    discuss stakeholder comments for               Option Year 1      the NRC with        early Option Year Subtask 4c incorporation into the update of DG-2.                           Subtask 4c (RES     2 will produce updated DG-2.)
Task and Subtask Numbers Description of Deliverables and Milestones Estimated Completion Dates for Deliverables and Milestones Required Media for Deliverables Anticipated Timing of Tasks Task 4, Subtask 4b Participate with NRC staff in a public meeting to discuss stakeholder comments on DG-1. Assist the NRC with reviewing and responding to stakeholder comments on DG-1 and preparing a second version of the draft guidance (DG-2) that incorporates stakeholder comments.
Assist the NRC with preparation of the final   Final Regulatory  Email to NRC        Subtask 4d Regulatory Guide based on comments from       Guide to be        COR that            completed near NRC staff and stakeholders and materials       completed near the summarizes what      the end of Option for incorporation related to endorsement of   end of Option Year was done to assist  Year 2 Task 4,    ANS 2.34. If a public meeting is held to       2                  the NRC with Subtask 4d discuss stakeholder comments, assist the                         Subtask 4d (RES NRC by participation in this meeting,                             will produce the final Regulatory Guide.)
DG-2 incorporating all comments should be completed in Option Year 1 Email to the NRC COR that summarizes what was done to assist the NRC with Subtask 4b (RES will produce DG-2.)
All Tasks Monthly Letter Status Reports (MLSRs)         20th day of the    Electronic report to MLSRs for all for all tasks per Section F.2 of the Base     following month   the NRC in           tasks through Contract.                                                        Microsoft Word Option Year 2 9
Subtask 4b extends into Option Year 1 Task 4, Subtask 4c Assist the NRC with updating DG-2 based on comments from internal reviewers and interested stakeholders, including participation in a public meeting, if held, to discuss stakeholder comments for incorporation into the update of DG-2.
Updated DG-2 incorporating all comments should be completed in Option Year 1 Email to the NRC COR that summarizes what was done to assist the NRC with Subtask 4c (RES will produce updated DG-2.)
Subtask 4c extends into late Option Year 1 and possibly into early Option Year 2
Task 4, Subtask 4d Assist the NRC with preparation of the final Regulatory Guide based on comments from NRC staff and stakeholders and materials for incorporation related to endorsement of ANS 2.34. If a public meeting is held to discuss stakeholder comments, assist the NRC by participation in this meeting, Final Regulatory Guide to be completed near the end of Option Year 2
Email to NRC COR that summarizes what was done to assist the NRC with Subtask 4d (RES will produce the final Regulatory Guide.)
Subtask 4d completed near the end of Option Year 2 All Tasks Monthly Letter Status Reports (MLSRs) for all tasks per Section F.2 of the Base Contract.
20th day of the following month Electronic report to the NRC in Microsoft Word MLSRs for all tasks through Option Year 2


31310018D0002_31310019F0022 P00002                                                 Attachment 1 C.8 REQUIRED LABOR CATEGORIES The Contractor shall provide individuals who have the required educational background and work experience to meet the objectives of the work specified in this task order. Specific qualifications for this work include the following:
31310018D0002_31310019F0022 P00002 10 C.8 REQUIRED LABOR CATEGORIES The Contractor shall provide individuals who have the required educational background and work experience to meet the objectives of the work specified in this task order. Specific qualifications for this work include the following:
Project Manager The Contractors Project Manager (PM) shall have experience in managing work related to participation by CNWRA staff in SSHAC Level 2 or Level 3 workshops, or similar types of projects, and shall also be familiar with the entire SSHAC process. The Contractors PM shall support the work performed under all tasks of this task order in close coordination with the NRC COR.
Project Manager The Contractors Project Manager (PM) shall have experience in managing work related to participation by CNWRA staff in SSHAC Level 2 or Level 3 workshops, or similar types of projects, and shall also be familiar with the entire SSHAC process. The Contractors PM shall support the work performed under all tasks of this task order in close coordination with the NRC COR.
Technical Subject Matter Expert The Technical Subject Matter Expert shall possess the expertise necessary for assessing potential hazards resulting from volcanic features and associated volcanic processes. The Technical Subject Matter Expert shall have experience in characterizing potential volcanic features and processes using the SSHAC process and performing probabilistic analyses for volcanic hazards. The Technical Subject Matter Expert shall support the work performed under Task 4 of this task order in close coordination with the NRC COR and the Contractors PM.
Technical Subject Matter Expert The Technical Subject Matter Expert shall possess the expertise necessary for assessing potential hazards resulting from volcanic features and associated volcanic processes. The Technical Subject Matter Expert shall have experience in characterizing potential volcanic features and processes using the SSHAC process and performing probabilistic analyses for volcanic hazards. The Technical Subject Matter Expert shall support the work performed under Task 4 of this task order in close coordination with the NRC COR and the Contractors PM.
Clerical Assistant The Clerical Assistant shall have experience in providing assistance for the production of administrative and technical reports. The Contractors PM shall advise the Clerical Assistant regarding the format required for NRC deliverables as necessary.
Clerical Assistant The Clerical Assistant shall have experience in providing assistance for the production of administrative and technical reports. The Contractors PM shall advise the Clerical Assistant regarding the format required for NRC deliverables as necessary.
10


31310018D0002_31310019F0022 P00002                                                 Attachment 1 Level of Effort Estimate This estimate for Level of Effort (LOE) is advisory only and should not be used as the sole basis for development of a staffing plan.
31310018D0002_31310019F0022 P00002 11 Level of Effort Estimate This estimate for Level of Effort (LOE) is advisory only and should not be used as the sole basis for development of a staffing plan.
C.9   GOVERNMENT-FURNISHED PROPERTY AND MATERIAL The NRC COR will provide the Contractor with any needed pre-application materials received from the applicant that must be reviewed prior to attending a SSHAC workshop.
C.9 GOVERNMENT-FURNISHED PROPERTY AND MATERIAL The NRC COR will provide the Contractor with any needed pre-application materials received from the applicant that must be reviewed prior to attending a SSHAC workshop.
No other government-furnished materials or property are anticipated to be needed by the Contractor.
No other government-furnished materials or property are anticipated to be needed by the Contractor.
C.10     PLACE OF PERFORMANCE The work to be performed under this task order shall be performed at the Contractors main facility in San Antonio, TX, except for the travel described in Section C.11 of this statement of work. Any subcontractors and/or consultants may work from their locations, but are expected to travel to meeting locations. Some meetings are likely to take place at NRC Headquarters in Rockville, MD, but could also be held at the Contractors office in Rockville, MD.
C.10 PLACE OF PERFORMANCE The work to be performed under this task order shall be performed at the Contractors main facility in San Antonio, TX, except for the travel described in Section C.11 of this statement of work. Any subcontractors and/or consultants may work from their locations, but are expected to travel to meeting locations. Some meetings are likely to take place at NRC Headquarters in Rockville, MD, but could also be held at the Contractors office in Rockville, MD.
C.11     SPECIAL CONSIDERATIONS TRAVEL Travel expenses consistent with the Federal Travel Regulation (FTR) and the limitation of 11
C.11 SPECIAL CONSIDERATIONS TRAVEL Travel expenses consistent with the Federal Travel Regulation (FTR) and the limitation of  


31310018D0002_31310019F0022 P00002                                                 Attachment 1 funds for this task order shall be authorized for the Contractor. All travel requires prior written approval from the NRC COR.
31310018D0002_31310019F0022 P00002 12 funds for this task order shall be authorized for the Contractor. All travel requires prior written approval from the NRC COR.
The following travel is anticipated under this task order. Travel for the Contractor related to Task 2 includes trips for observation of SSHAC kickoff meetings and workshops, final PPRP briefings, and geologic field trips organized by applicant. Meetings related to certain SHHAC studies will also involve travel by the technical subject matter expert in volcanology. Travel for the Contractor related to Task 4 includes trips necessary to assist the NRC with preparing draft and final regulatory guidance associated with assessment of volcanic hazards. The Contractor shall assume the following number of trips in the fiscal years shown to estimate travel costs:
The following travel is anticipated under this task order. Travel for the Contractor related to Task 2 includes trips for observation of SSHAC kickoff meetings and workshops, final PPRP briefings, and geologic field trips organized by applicant. Meetings related to certain SHHAC studies will also involve travel by the technical subject matter expert in volcanology. Travel for the Contractor related to Task 4 includes trips necessary to assist the NRC with preparing draft and final regulatory guidance associated with assessment of volcanic hazards. The Contractor shall assume the following number of trips in the fiscal years shown to estimate travel costs:
12


31310018D0002_31310019F0022 P00002                                                 Attachment 1 Task Number       Purpose of Fiscal Year Contract   Travel Dates   Number of Number of     Estimated Number Travel Destination2 and Subtask          Travel                  Year1                      Trips    Travelers    of Travel Days 2-Subtask       Observe       2019         Base     June 2019       1         1           3 with NRC COR   Idaho Falls, ID 2a(SSHAC         SSHAC                      Year                                              approval Project #1)      Project #1 Field Trip 2 - Subtask 2a  Observation of 2020         Option   TBD based on     1 with NRC 2 (PM and   3 days with NRC   Idaho Falls, ID (SSHAC Study 2 - SSHAC Study                Year 1   applicants      COR        Technical    COR approval UAMPS)          2 Kickoff                            schedule        approval  Specialist)
31310018D0002_31310019F0022 P00002 13 Task Number and Subtask Purpose of Travel Fiscal Year Contract Year1 Travel Dates Number of Trips Number of Travelers Estimated Number of Travel Days Travel Destination2 2-Subtask 2a(SSHAC Project #1)
Meeting                                                          with NRC COR approval 2-Subtask 2b    Observation   2019         Base     April 8-12, 2019 1 With NRC 1 (PM with   5 days with NRC   Walnut Creek, CA (SSHAC Project of SSHAC                      Year                      COR        NRC COR      COR approval
Observe SSHAC Project #1 Field Trip 2019 Base Year June 2019 1
  #1, Workshop #1) Project 1,                                            approval  Approval)
1 3 with NRC COR approval Idaho Falls, ID 2 - Subtask 2a (SSHAC Study 2 -
Workshop 1 2-Subtask 2b    Observe        2020         Base     August 12-17     1         1           6 days with NRC   Walnut Creek, CA (SSHAC Project  SSHAC                       Year                                              COR approval
UAMPS)
  #1)              Project #2 Workshop 1 2 - Subtask 2b  Observation    2021         Option   22-26 March     1 with NRC 1 (PM) with 5 days with NRC   Walnut Creek, CA (SSHAC Study 1 - of SSHAC                   Year 1    2021            COR        NRC COR      COR approval DOE INL)        Study 1                                               approval  approval Workshop 3 2 - Subtask 2b  Observation    2020 or 2021 Option   TBD based on     1 with NRC 2 (PM and   5 days with NRC   Idaho Falls, ID (SSHAC Study 2 - of SSHAC                   Year 1    applicants      COR        Technical    COR approval UAMPS)          Study 2                               schedule        approval  Specialist)
Observation of SSHAC Study 2 Kickoff Meeting 2020 Option Year 1 TBD based on applicants schedule 1 with NRC COR approval 2 (PM and Technical Specialist) with NRC COR approval 3 days with NRC COR approval Idaho Falls, ID 2-Subtask 2b (SSHAC Project
Workshop 1                                                        with NRC COR approval 2 - Subtask 2b  Observation    2021         Option   TBD based on     1 with NRC 2 (PM and   6 days with NRC   Idaho Falls, ID (SSHAC Study 2 - of SSHAC                    Year 1    applicants      COR        Technical    COR approval UAMPS)          Study 2                              schedule        approval  Specialist)
#1, Workshop #1)
Workshop                                                          with NRC 2, and                                                            COR approval geologic site trip 13
Observation of SSHAC Project 1, Workshop 1 2019 Base Year April 8-12, 2019 1 With NRC COR approval 1 (PM with NRC COR Approval) 5 days with NRC COR approval Walnut Creek, CA 2-Subtask 2b (SSHAC Project  
#1)
Observe SSHAC Project #2 Workshop 1 2020 Base Year August 12-17 1
1 6 days with NRC COR approval Walnut Creek, CA 2 - Subtask 2b (SSHAC Study 1 -
DOE INL)
Observation of SSHAC Study 1 Workshop 3 2021 Option Year 1 22-26 March 2021 1 with NRC COR approval 1 (PM) with NRC COR approval 5 days with NRC COR approval Walnut Creek, CA 2 - Subtask 2b (SSHAC Study 2 -
UAMPS)
Observation of SSHAC Study 2 Workshop 1 2020 or 2021 Option Year 1 TBD based on applicants schedule 1 with NRC COR approval 2 (PM and Technical Specialist) with NRC COR approval 5 days with NRC COR approval Idaho Falls, ID 2 - Subtask 2b (SSHAC Study 2 -
UAMPS)
Observation of SSHAC Study 2 Workshop 2, and geologic site trip 2021 Option Year 1 TBD based on applicants schedule 1 with NRC COR approval 2 (PM and Technical Specialist) with NRC COR approval 6 days with NRC COR approval Idaho Falls, ID


31310018D0002_31310019F0022 P00002                                                   Attachment 1 2 - Subtask 2c   Observation   2021         Option     27-30 July 2021 1 with NRC 1 (PM) with     3 days with NRC   Walnut Creek, CA (SSHAC Study 1 - of SSHAC                     Year 2                     COR        NRC COR        COR approval DOE INL)        Study 1 final                                           approval  approval PPRP briefing 2- Subtask 2c    Observation    2022         Option     TBD based on   1 with NRC 2 (PM and       3 days with NRC   Idaho Falls, ID (SSHAC Study 2 - of SSHAC                    Year 2    applicants    COR        Technical      COR approval UAMPS)          Study 2 final                          schedule        approval  Specialist)
31310018D0002_31310019F0022 P00002 14 2 - Subtask 2c (SSHAC Study 1 -
PPRP                                                              with NRC briefing                                                          COR approval Task Number       Purpose of   Fiscal Year   Contract   Travel Dates Number of   Number of     Estimated Number Travel Destination2 and Subtask          Travel                    Year1                    Trips      Travelers      of Travel Days 4-Subtask 4a     Attend kickoff 2019         Base Year May 2019       1         2 (PM-Local 2                    Meetings held at and planning                                                      travel by the                     NRC Headquarters meeting in                                                        Technical                         or the Contractors Rockville, MD                                                      Specialist with                   office in Rockville, at NRC                                                            NRC COR                           MD.
DOE INL)
headquarters                                                      approval) or the Contractors office in Rockville, MD 4-Subtask 4a     Writing       2019         Base Year September 2019 1         1               2 days with NRC   Meetings held at session for                                                                        COR approval      NRC headquarters Volcanic                                                                                            or the Contractors Hazard                                                                                              office in Rockville, Guidance                                                                                            MD.
Observation of SSHAC Study 1 final PPRP briefing 2021 Option Year 2 27-30 July 2021 1 with NRC COR approval 1 (PM) with NRC COR approval 3 days with NRC COR approval Walnut Creek, CA 2-Subtask 2c (SSHAC Study 2 -
14
UAMPS)
Observation of SSHAC Study 2 final PPRP briefing 2022 Option Year 2 TBD based on applicants schedule 1 with NRC COR approval 2 (PM and Technical Specialist) with NRC COR approval 3 days with NRC COR approval Idaho Falls, ID Task Number and Subtask Purpose of Travel Fiscal Year Contract Year1 Travel Dates Number of Trips Number of Travelers Estimated Number of Travel Days Travel Destination2 4-Subtask 4a Attend kickoff and planning meeting in Rockville, MD at NRC headquarters or the Contractors office in Rockville, MD 2019 Base Year May 2019 1
2 (PM-Local travel by the Technical Specialist with NRC COR approval) 2 Meetings held at NRC Headquarters or the Contractors office in Rockville, MD.
4-Subtask 4a Writing session for Volcanic Hazard Guidance 2019 Base Year September 2019 1
1 2 days with NRC COR approval Meetings held at NRC headquarters or the Contractors office in Rockville, MD.


31310018D0002_31310019F0022 P00002                                                         Attachment 1 4 - Subtask 4a Writing           2020        Base Year    Preliminary public 3 with NRC 2 (PM - Local 6 days (2 for each Meetings held at sessions,                                   meeting (21        COR        travel by the trip) with NRC COR NRC Headquarters internal                                     October 2019),    approval  Technical    approval          or the Contractors briefings                                   writing session (4            Specialist)                      office in Rockville, (including the                               December 2019),              with NRC                        MD ACRS), and a                                 and ACRS briefing            COR approval (20 February preliminary 2020) public meeting for preparing initial draft guidance (DG-1) to send out for comment by stakeholders 4 - Subtask 4b Public meeting to 2020         Option Year 1 Dates for a public 1 with NRC 2 (PM - Local 3 days with NRC   Meetings held at discuss                                      meeting and a      COR        travel by the COR approval      NRC Headquarters stakeholder                                  writing session to approval  Technical                        or the Contractors comments on                                  produce DG-2 are              Specialist)                      office in Rockville, DG-1, writing                               TBD                          with NRC                        MD session to                                                                 COR approval incorporate stakeholder comments on DG-1 and prepare a second draft guidance (DG-2) 4 - Subtask 4c Writing session  2020 or 2021 Option Years Dates for a public 1 with NRC 2 (PM - Local 3 days with NRC   Meetings held at to update DG-2                 1 or 2       meeting and a     COR       travel by the COR approval       NRC Headquarters based on                                    writing session to approval  Technical                        or the Contractors internal and                                update DG-2 are              Specialist)                      office in Rockville, stakeholder                                  TBD                          with NRC                        MD comments,                                                                  COR approval possibly with a public meeting to discuss comments 15
31310018D0002_31310019F0022 P00002 15 4 - Subtask 4a Writing
: sessions, internal briefings (including the ACRS), and a preliminary public meeting for preparing initial draft guidance (DG-1) to send out for comment by stakeholders 2020 Base Year Preliminary public meeting (21 October 2019),
writing session (4 December 2019),
and ACRS briefing (20 February 2020) 3 with NRC COR approval 2 (PM - Local travel by the Technical Specialist) with NRC COR approval 6 days (2 for each trip) with NRC COR approval Meetings held at NRC Headquarters or the Contractors office in Rockville, MD 4 - Subtask 4b Public meeting to discuss stakeholder comments on DG-1, writing session to incorporate stakeholder comments on DG-1 and prepare a second draft guidance (DG-2) 2020 Option Year 1 Dates for a public meeting and a writing session to produce DG-2 are TBD 1 with NRC COR approval 2 (PM - Local travel by the Technical Specialist) with NRC COR approval 3 days with NRC COR approval Meetings held at NRC Headquarters or the Contractors office in Rockville, MD 4 - Subtask 4c Writing session to update DG-2 based on internal and stakeholder
: comments, possibly with a public meeting to discuss comments 2020 or 2021 Option Years 1 or 2 Dates for a public meeting and a writing session to update DG-2 are TBD 1 with NRC COR approval 2 (PM - Local travel by the Technical Specialist) with NRC COR approval 3 days with NRC COR approval Meetings held at NRC Headquarters or the Contractors office in Rockville, MD


31310018D0002_31310019F0022 P00002                                                         Attachment 1 4 - Subtask 4d   Writing session 2022       Option Year 2 Dates for a public 1 with NRC 2 (PM - Local 3 days with NRC Meetings held at and public                                meeting and a      COR        travel by the COR approval    NRC Headquarters meeting to                                writing session to approval  Technical                    or the Contractors prepare Final                            produce the final            Specialist)                  office in Rockville, Regulatory Guide                          Regulatory Guide              with NRC                      MD incorporating the                        are TBD                      COR approval ANS 2.34 standard NOTES:
31310018D0002_31310019F0022 P00002 16 4 - Subtask 4d Writing session and public meeting to prepare Final Regulatory Guide incorporating the ANS 2.34 standard 2022 Option Year 2 Dates for a public meeting and a writing session to produce the final Regulatory Guide are TBD 1 with NRC COR approval 2 (PM - Local travel by the Technical Specialist) with NRC COR approval 3 days with NRC COR approval Meetings held at NRC Headquarters or the Contractors office in Rockville, MD NOTES:
1 Base Year covers FY19-Q3 through FY20-Q2 (01 April 2019 to 31 March 2020). Option Year 1 covers FY20-Q3 through FY21-Q2 (01 April 2020 to 31 March 2021). Option Year 2 covers FY21-Q3 through FY22-Q2 (01 April 2021 to 31 March 2022).
1 Base Year covers FY19-Q3 through FY20-Q2 (01 April 2019 to 31 March 2020). Option Year 1 covers FY20-Q3 through FY21-Q2 (01 April 2020 to 31 March 2021). Option Year 2 covers FY21-Q3 through FY22-Q2 (01 April 2021 to 31 March 2022).
2 Travel destinations are assumptions for travel cost estimates only. Applicants will make the final decisions on specific travel destinations, as well as travel dates, for Task 2.
2 Travel destinations are assumptions for travel cost estimates only. Applicants will make the final decisions on specific travel destinations, as well as travel dates, for Task 2.
16


31310018D0002_31310019F0022 P00002                               Attachment 1 SECURITY The work performed under this task order will be UNCLASSIFIED.
31310018D0002_31310019F0022 P00002 16 SECURITY The work performed under this task order will be UNCLASSIFIED.
KEY PERSONNEL Refer to Section H.2 2052.215-70 KEY PERSONNEL (JAN 1993) 16}}
KEY PERSONNEL Refer to Section H.2 2052.215-70 KEY PERSONNEL (JAN 1993)}}

Latest revision as of 23:42, 14 December 2024

Modification No. 002 to Task Order No. 31310019F0022 Under Contract No. 31310018D0002
ML20079F573
Person / Time
Issue date: 03/19/2020
From: Jennifer Dudek
Acquisition Management Division
To:
Southwest Research Institute
References
31310018D0002
Download: ML20079F573 (23)


Text

___________

(x) 31310019F0022 x 31310018D0002 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

2020-X0200-FEEBASED-20-20D002-1030-17-4-151-251A-17-4-151-1030 007936842 SOUTHWEST RESEARCH INSTITUTE NRCHQ WASHINGTON DC 20555-0001 MAIL STOP TWFN-07B20M ACQUISITION MANAGEMENT DIVISION US NRC - HQ NRR-20-0070 See Block 16C P00002 23 1

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.

is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS FACILITY CODE CODE 10B. DATED (SEE ITEM 13) 10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11) 9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)

CODE

6. ISSUED BY PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.
3. EFFECTIVE DATE
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 04/12/2019 6220 CULEBRA RD SAN ANTONIO TX 782385166 Net Increase:

$44,000.00 CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT:

Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

FAR 52.217-9 Option to Extend; FAR 52.232-22 Limitation of Funds; & FAR 43.103(a) Mutual Agreement x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

X 1

    • SEE PAGE THREE (3) FOR DESCRIPTION OF MODIFICATION TO 1)INCREASE THE TASK ORDER CEILING;
2) PROVIDE INCREMENTAL FUNDING; 3) REVISE THE COST AND PRICE SCHEDULE; 4)EXERCISE OPTION PERIOD ONE AND; 5)REVISE THE STATEMENT OF WORK TO INCLUDE THE ADDITIONAL LEVEL-OF-EFFORT REQUIRED.**

Task Order Base and All Options: $674,811.67 (Changed)

Total Task Order Obligated Amount:

(Changed)

Task Order Total Exercised Amount:

(Changed)

Current Period of Performance: 08/12/2019-03/31/2021 (Changed)

Ultimate Period of Performance: 08/12/2019-03/31/2022 (Unchanged)

Continued...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) 15A. NAME AND TITLE OF SIGNER (Type or print) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED (Signature of person authorized to sign)

(Signature of Contracting Officer)

JENNIFER A. DUDEK STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243 NSN 7540-01-152-8070 Previous edition unusable Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect.

03/19/2020 TEL:

EMAIL:

301-415-2257 Jennifer.Dudek@nrc.gov

ITEM NO.

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT NAME OF OFFEROR OR CONTRACTOR 2

23 CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF SOUTHWEST RESEARCH INSTITUTE (A)

(B)

(C)

(D)

(E)

(F) 31310018D0002/31310019F0022/P00002 Period of Performance: 04/01/2019 to 03/31/2021 NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

31310018D0002_31310019F0022 P00002 3

The purpose of this task order modification is to: 1) increase the task order base and all options ceiling by

2) provide incremental funding in the amount of

, thereby increasing the obligated amount from

3) revise the cost and price schedule; 4) exercise Option Period 1, pursuant to FAR Clause 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000), thereby increasing the exercised task order ceiling by
and extending the period of performance from April 01, 2020 through March 30, 2021 and; 5) revise the Statement of Work to include the additional level-of-effort required. Accordingly, the task order is hereby modified
1) Section B.2 CONSIDERATION AND OBLIGATION TASK ORDERS (AUG 2011) is deleted in its entirety and replaced with the following:

(a) The total ceiling of this contract for the products/services under this contract is The amount will increase upon exercise of Option Periods and/or Optional Tasks as shown in Section B.3.

(b) This order is subject to the minimum and maximum ordering requirements set forth in the contract.

(c) The amount presently obligated with respect to this order is of which represents costs and represents fixed-fee. The obligated amount shall, at no time, exceed the order ceiling as specified in paragraph (a) above. When and if the amount(s) paid and payable to the Contractor hereunder shall equal the obligated amount, the Contractor shall not be obligated to continue performance of the work unless and until the Contracting Officer shall increase the amount obligated with respect to this order, in accordance with FAR Part 43 - Modifications. Any work undertaken by the Contractor in excess of the obligated amount specified above is done so at the Contractor's sole risk and may not be reimbursed by the Government.

(d) The Contractor shall comply with the provisions of FAR 52.232 Limitation of Funds, for incrementally-funded delivery orders or task orders.

(e) In accordance with FAR 52.216 Fixed Fee, it is the policy of the NRC to withhold payment of fee after payment of 85 percent of the fee has been paid in order to protect the Governments interest. The amount of fixed-fee withheld from the contractor will not exceed 15 percent of the total fee or $100,000, whichever is less. Accordingly, the maximum amount of fixed-fee that may be held in reserve is (End Clause)

31310018D0002_31310019F0022 P00002 4

2) B.3 PRICE/COST SCHEDULE is deleted in its entirety and replaced with the following:

CLIN Description Est Cost Fixed Fee Total Cost Plus Fixed Fee Cost - Base Period Fee - Base Period Option Period 1 Option Period 2 Total

$674,811.67 Total Estimated Cost and Fixed-Fee breakdown by cost element per base and option task is presented below.

DESCRIPTION Estimated Amount Base Period Estimated Amount Option Period 1 Estimated Amount Option Period 2 Total Estimated Costs Inclusive of Option Periods Total Estimated Costs and Fixed-Fee

$674,811.67

3) SECTION F.1 TASK/DELIVERY ORDER PERIOD OF PERFORMANCE (SEP 2013) is deleted in its entirety and replaced with the following:

This task order shall commence on April 12, 2019 and will expire on March 31, 2021. The term of this task order may be extended at the option of the Government for additional Option Periods.

If exercised,Section I.8 Clause 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) is applicable.

Exercised Period (Base & Option Period One): April 12, 2019 through March 31, 2021

31310018D0002_31310019F0022 P00002 5

Remaining Option Period:

Option Period Two: April 01, 2021 through March 31, 2022 (End Clause)

4) SECTION C-Descriptions/Specifications/Statement of Work is deleted in its entirety and replaced with Attachment 1.

All other terms and conditions of this task order remain unchanged.

31310018D0002_31310019F0022 P00002 1

SECTION C - Descriptions/Specifications/Statement of Work COVER PAGE ADDENDUM FOR TASK ORDER STATEMENT OF WORK (SOW)

Project Title Technical Support to NRC for Observation of SSHAC Workshops and Development of Guidance Related to Pre-Application Geologic and Seismic Hazard Evaluations of Proposed New Nuclear Power Plant Sites Job Code/Cost Center 1030 Task Areas Licensing Support and Guidance Development Budget & Reporting Number 17-4-151 NRC Issuing Office Office of Nuclear Reactor Regulation (NRR)

Fee Recoverable NO TAC Numbers N/A Docket Number N/A

31310018D0002_31310019F0022 P00002 2

TASK ORDER STATEMENT OF WORK C.1 PROJECT TITLE Technical Support to NRC for Observation of SSHAC Workshops and Development of Guidance Related to Pre-Application Geologic and Seismic Hazard Evaluations of Proposed New Nuclear Power Plant Sites C.2 BACKGROUND To meet regulatory requirements specified in 10 CFR Part 100.23(c), an applicant shall investigate the geologic, seismic, and engineering characteristics of a site and its environs in sufficient scope and detail to permit an adequate evaluation of the proposed site; provide sufficient information to support evaluations performed to derive estimates of the Safe Shutdown Earthquake (SSE) Ground Motion; and permit adequate engineering solutions to actual or potential geologic and seismic effects at the proposed site. In addition, as specified in 10 CFR Part 100.23(d)(1), an applicant shall address the uncertainties inherent in estimates of the SSE through an appropriate analysis, such as a probabilistic seismic hazard assessment (PSHA), or suitable sensitivity analyses. Consistent with Regulatory Guide 1.208, "A Performance-Based Approach to Define the Site Specific Earthquake Ground Motion," the PSHA should allow use of multiple seismic source models to estimate the likelihood of earthquake ground motions occurring at a site and systematically take into account the uncertainties in PSHA input parameters related to seismic source characteristics, recurrence and maximum magnitude of earthquakes within a seismic source, and engineering estimates of earthquake ground motion derived from attenuation relationships. Consistent with Section 2.5.2, Vibratory Ground Motion, of NUREG-0800, Standard Review Plan, applicants evaluating earthquake potential and characterizing the associated uncertainty for sites assessed using methods other than the Central and Eastern U.S.-

Seismic Source Characterization (CEUS-SSC) method and related databases, or for sites outside the CEUS, should use the Senior Seismic Hazard Analysis Committee (SSHAC) methodology, the structured process for which is described in NUREG/CR-6372, "Recommendations for Probabilistic Seismic Hazard Analysis: Guidance on Uncertainty and Use of Experts." Consistent with current practice as described in NUREG-2213, "Updated Implementation Guidelines for SSHAC Hazard Studies," the SSHAC methodology can be implemented for assessing both potential geologic and seismic hazards at a proposed site. While seismic hazard should be assessed using the SSHAC methodology and a PSHA, for certain proposed sites, an applicant may also consider implementing the SSHAC methodology to probabilistically evaluate potential non-seismic geologic hazards (e.g.,

volcanism and associated volcanic processes).

C.3 OBJECTIVE AND SCOPE OF WORK The objective of this task order is to acquire technical expertise from the Center for Nuclear Waste Regulatory Analyses (CNWRA), the Contractor, for supporting NRC staff during SSHAC workshops related to pre-application geologic and seismic hazard evaluations conducted by applicants for proposed new nuclear power plant sites. Specifically, the Contractor shall provide support as invited observers of SSHAC workshops conducted by applicants for the proposed nuclear power plants. The NRC Contracting Officers Representative (COR) will obtain invitations for Contractor staff and any consultants used by the Contractor to attend the workshops as observers on behalf of the NRC in conjunction with NRC staff. The Contractor shall also assist the NRC with developing guidance related to evaluating site-specific non-seismic geologic hazards. The Contractor shall conduct the work under

31310018D0002_31310019F0022 P00002 3

this task order in accordance with the work descriptions shown below for Tasks 1, 2, 3, and 4.

Frequent communications between Contractor staff, the NRC technical team, and the NRC COR are anticipated. Meetings between Contractor and NRC staff members will be conducted as needed. Such communications with NRC staff may result in information subject to hearing file requirements under 10 CFR Part 2. Under that circumstance, the NRC COR will identify the types of records the Contractor must provide to the NRC for inclusion in the hearing file.

Tasks 1, 2, and 3 under this task order shall be conducted to provide technical support to NRC staff for observation of pre-application SSHAC studies performed by applicants for proposed new nuclear power plant sites. Certain proposed sites could exhibit geologic features and processes or seismic characteristics that require specialized technical expertise to provide deeper insight to NRC staff regarding an applicants approach to implementing the SSHAC methodology for addressing potential hazards related to those features, processes, and characteristics. In those instances, as requested by the NRC, the Contractor shall use qualified personnel having the essential specialized technical expertise as specified in Section C.8 of this SOW. The Contractor shall coordinate closely with the NRC COR to ensure that Tasks 1, 2, and 3 are successfully executed and that all associated deliverables are appropriate and provide timely insight to NRC staff for assessing an applicants pre-application geologic and seismic hazard evaluations for proposed new nuclear power plants.

Task 4 under this task order shall be conducted to provide technical support to NRC staff regarding preparation of guidance on addressing volcanism and associated volcanic processes at sites where volcanic features are present because volcanism and volcanic processes can create natural geologic hazards. The guidance will assist the NRC with assessing an applicants pre-application treatment of potential site-specific hazards related to volcanic features and processes. The guidance shall directly address volcanic features and associated processes that occur at a site for a proposed new nuclear power plant and include a detailed discussion of an acceptable approach for evaluating volcanic hazards at the site. The discussion shall include recommendations for an initial screening rationale focused on identification of potentially hazardous volcanic sources; specification of data necessary for adequately characterizing the potential hazard from those sources; definition of the potentially hazardous event based on probability of occurrence; and evaluation of the potential hazard based on a probabilistic hazard assessment. The NRC envisions that this guidance will be finally produced as a Regulatory Guide with assistance from the Office of Nuclear Regulatory Research (RES). Preparation of the guidance shall involve a qualified technical specialist in volcanology who has the knowledge and experience necessary to provide deeper insight to NRC staff regarding an applicants approach to addressing potential hazards related to site-specific volcanism and associated volcanic processes, including adequacy of the applicants characterization of volcanic features and processes at the site.

The Contractor shall coordinate closely with the NRC COR to ensure that Task 4 is successfully executed and that all associated deliverables are appropriate and timely to support NRCs development of the draft and final versions of the guidance document on volcanic hazards. Development of the draft and final guidance shall involve support from the Contractor, as requested by the NRC, to assist NRC staff with internal briefings as well as incorporating stakeholder comments on the draft guidance into the final guidance document. The Contractor shall, as requested by the NRC, assist with planning,

31310018D0002_31310019F0022 P00002 4

organizing, and facilitating public meetings to allow discussion of stakeholder comments on the draft guidance, as well as documenting the discussions that occur during the meetings in summary reports.

The technical expert in volcanology will be expected to participate in those public meetings as requested by the NRC.

C.4 SPECIFIC TASKS Task 1 - Prepare for Observation of SSHAC Workshops (Anticipated in the Base Year and Option Year 1)

Prior to observation of the SSHAC workshops in concert with NRC staff, the Contractor shall review pertinent regulatory requirements and guidance as well as background information identified by the NRC COR to ensure familiarity with these materials. The materials can include, but may not be limited to, pre-application information provided by the applicant; the applicants SSHAC project plans, if available; regulatory requirements in 10 CFR Part 100.23; pertinent sections of NUREG-0800; NRC Regulatory Guide 1.208; NUREG/CR-6372; and NUREG-2213. Although no formal deliverables are associated with this task, review of pertinent materials must be conducted sufficiently in advance of the SSHAC workshops to enable the Contractor to prepare for supporting NRC staff during observation of the workshops. The reviews conducted by the Contractor should be documented in a Monthly Letter Status Report (MLSR). No travel is associated with Task 1.

Task 2 - Participate as Invited Observers in Plant-Specific Kickoff Meetings, SSHAC Workshops and Related Meetings, and Geologic Site Visits Conducted by the Applicant (Anticipated in the Base Year and Option Years 1 and 2)

As directed by the NRC COR, the Contractor shall participate as invited observers in all SSHAC workshops and geologic site visits conducted by an applicant for each proposed new nuclear power plant to support NRC staff during the applicants pre-application evaluation of geologic and seismic hazards. This support will provide insight to the NRC regarding an applicants approach to implementing the SSHAC methodology for adequately addressing potential hazards related to geologic features and associated processes and seismic characteristics at the plant sites, including adequacy of the applicants descriptions of those features, processes, and characteristics. The Contractor shall prepare reports to summarize and evaluate the information discussed at the workshops, related meetings, and geologic site visits to include input from any consultants used. If the Contractor participates as an invited observer in kickoff meetings, the Contractor shall also summarize and evaluate the information discussed, to include input from any consultants used, and incorporate that information into the first SSHAC workshop report. Anticipated content of these reports is described below under Subtasks 3a and 3b.

Travel by the Contractor will occur in accordance with the applicants schedules for kickoff meetings, SSHAC workshops, related meetings (e.g., the final Participatory Peer Review Panel, or PPRP briefing), and geologic site visits to locations determined by the applicant. The NRC COR will approve all travel by the Contractor.

Subtask 2a: Participate in SSHAC kickoff meetings for SSHAC studies during the Base Year and Option Year 1 to support NRC staff during the pre-application evaluations of geologic and seismic hazards performed by applicants, as described above for Task 2.

31310018D0002_31310019F0022 P00002 5

Subtask 2b: Participate in SSHAC workshops and geologic site visits during the Base Year and Option Years 1and 2 to support NRC staff during the pre-application evaluations of geologic and seismic hazards performed by applicants, as described above for Task 2.

Subtask 2c: Participate in SSHAC final PPRP briefings, most likely in Option Year 2, to support NRC staff during the pre-application evaluations of geologic and seismic hazards performed by applicants, as described above for Task 2.

Task 3 - Prepare Summary Reports for Kickoff Meetings, SSHAC Workshops and Related Meetings, and Geologic Site Visits (Anticipated in the Base Year and Option Years 1 and 2)

Subtask 3a: For each SSHAC workshop, related meeting (e.g., the final PPRP briefing, if held),

and geologic site visit attended for each individual plant site, the Contractor shall prepare a draft report to summarize and evaluate results of the workshop, the related meeting, and the geologic site visit, to include input from any consultants involved. The report shall include important issues raised, conclusions drawn, and action items defined that could assist the NRC during the applicants pre-application geologic and seismic hazard evaluations for proposed new nuclear power plants. If the Contractor participates as an invited observer in kickoff meetings, the Contractor shall also summarize and evaluate the information discussed, to include input from any consultants used, and incorporate that information into the first SSHAC workshop report. After review of the draft report by the NRC COR, the Contractor shall prepare a revised final report addressing any comments made by the COR. Preparation of these reports for each individual plant site is anticipated during the Base Year and Option Years 1 and 2. No travel is required for Subtask 3a.

Subtask 3b: Upon completion of all SSHAC workshops, related meetings, and geologic site visits for each plant site, the Contractor shall prepare a draft report for each proposed nuclear power plant site that summarizes all issues and conclusions from the individual workshop reports for each plant site, to include information based on any geologic site visits attended and any related meetings (e.g., the final PPRP briefing, if held). After review of the draft report by the NRC COR, the Contractor shall prepare a revised report addressing any comments made by the COR.

Preparation of these reports that combine information from all individual reports prepared for each plant site is anticipated during Option Years 1 and 2. No travel is required for Subtask 3b.

Task 4 - Support Development of Guidance for Assessing Potential Hazards Related to Volcanism and Associated Volcanic Processes at Proposed Sites Exhibiting Volcanic Features (Anticipated in the Base Year and Option Years 1 and 2)

Subtask 4a (Base Year) - Prepare Initial Draft Guidance (DG-1): During the Base Year (01 April 2019 to 31 March 2020), the Contractor shall support the NRC with preparation of initial draft guidance (DG-1) that presents a risk-informed, graded approach for assessment of potential hazards resulting from volcanism and associated volcanic processes at proposed sites where volcanic features are present. Preparation of DG-1 shall involve a technical expert with specific expertise in volcanology. The Contractor shall participate in writing sessions and public meetings with NRC staff and stakeholders that are related to preparing the guidance. These meetings will likely be held at or near NRC headquarters in Rockville, MD. The Contractor shall assist NRC staff with preparing DG-1 for stakeholder review, as requested, to enable the NRC to submit this initial

31310018D0002_31310019F0022 P00002 6

draft for required public comment in a timely manner. It is anticipated that DG-1 will be prepared and issued for formal stakeholder comment by the end of the Base Year. Prior to release of DG-1 for formal comment by stakeholders, the Contractor shall assist NRC staff with preparing materials for internal management briefings and a preliminary public meeting, provide support for internal management briefings and the preliminary public meeting, and develop an initial draft outline showing planned content of DG-1, as requested by the NRC. If stakeholder comments are received on the initial draft outline for DG-1, the Contractor shall assist with reviewing and addressing the comments, as requested. In addition, the Contractor shall assist with responses to internal comments and commensurate updates to DG-1 and provide support for Advisory Committee on Reactor Safeguards (ACRS) briefings to both the Subcommittee and Full Committee, as requested. Following ACRS briefings, the Contractor shall assist with addressing ACRS comments as requested.

Subtask 4b (Option Year 1) - Update DG-1 to Draft Guidance Version 2 (DG-2): During Option Year 1 (01 April 2020 to 31 March 2021), the Contractor shall assist the NRC with reviewing and responding to stakeholder comments on DG-1 after the public comment period closes. Comments are expected from a range of stakeholders, including industry representatives. The Contractor shall participate in the public meeting to discuss stakeholder comments on DG-1, as requested, and assist the NRC with preparation of GD-2 that incorporates those comments. It is anticipated that DG-2 will be prepared late in Option Year 1. Incorporation of stakeholder comments into DG-2 will possibly include at least one writing session to be held at or near NRC headquarters in Rockville, MD.

Subtask 4c (Option Years 1 and 2) - Update DG-2: If the NRC determines that there is a need to conduct a public meeting to discuss stakeholder comments on DG-2, the Contractor shall participate in that meeting, as requested. DG-2 will undergo internal review and concurrence at the NRC, and the Contractor shall assist with responding to concurrence comments and updating DG-2, as requested. In addition, once DG-2 is released for use by applicants, staff will elicit comments to determine whether DG-2 should be updated further. As requested, the Contractor shall assist the NRC with incorporating comments from applicants into DG-2. It is anticipated that any necessary revisions to update DG-2 will be done during Option Years 1 (01 April 2020 to 31 March 2021) and 2 (01 April 2021 to 31 March 2022).

Subtask 4d (Option Year 2) - Prepare Final Regulatory Guide: Once the ANS 2.34 standard titled Characterization and Probabilistic Analysis of Volcanic Hazards is completed, staff will review and consider endorsing the standard. If endorsed, NRC anticipates incorporating the standard, as appropriate, and publishing the final guidance as a Regulatory Guide near the end of Option Year 2 (01 April 2021 to 31 March 2022). The Contractor shall assist NRC staff with updating the final guidance based on any additional comments from stakeholders, preparing the Regulatory Guide for internal concurrence and updating the Regulatory Guide accordingly, and briefing the ACRS, should the briefing be scheduled, if requested. To produce the final Regulatory Guide, NRC anticipates possibly holding a public meeting, an internal working meeting, and a final writing session. These various meetings are expected to be held at or near NRC headquarters in Rockville, MD, if they occur.

31310018D0002_31310019F0022 P00002 7

C.5 APPLICABLE DOCUMENT AND STANDARDS The following regulatory requirements and guidance are applicable to this task order and can be found at http://www.nrc.gov/reading-rm/doc-collections. If necessary, any references that are not available at this website will be provided to the Contractor by the NRC COR.

1. 10 CFR Part 100.23, Reactor Site Criteria - Geologic and Seismic Siting Criteria, 81 FR 86910, issued December 2016
2. Regulatory Guide 1.208, "A Performance-Based Approach to Define the Site-Specific Earthquake Ground Motion," issued March 2007
3. NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition, Revision 5, issued July 2014
4. NUREG/CR-6372, Recommendations for Probabilistic Seismic Hazard Analysis: Guidance on Uncertainty and Use of Experts, issued April 1997
5. NUREG-2213, Updated Implementation Guidelines for SSHAC Hazard Studies, issued October 2018 C.6 DELIVERABLES AND DELIVERY SCHEDULE Project deliverables for this task order are shown in the following table. All deliverables shall be submitted to the NRC COR electronically in the media indicated. The following identification information shall be included in all written deliverables:

Job Code/Cost Center Name of Applicant Plant Name Plant Site Name

31310018D0002_31310019F0022 P00002 8

C.7 DELIVERABLES AND MILESTONES SC Task and Subtask Numbers Description of Deliverables and Milestones Estimated Completion Dates for Deliverables and Milestones Required Media for Deliverables Anticipated Timing for Tasks Task 1 Review appropriate regulatory requirements and guidance; any pre-application information provided by the applicant; the applicants SSHAC project plans, if available; NRC Regulatory Guide 1.208; NUREG/CR-6372; and NUREG-2213.

1 week after authorization of work or as directed by the NRC COR No formal deliverables for Task 1 Task 1 extends through the Base Year into Option Year 1 Task 2, Subtasks 2a through 2c In concert with NRC staff as invited observers, attend all SSHAC kickoff meetings, workshops, and related meetings (e.g., the PPRP final briefing, if held) for each proposed plant site as well as geologic field trips organized by the applicant.

Dates for meetings and field trips will be set by the applicant Deliverables related to Task 2 are defined below under Subtasks 3a and 3b of Task 3 Subtasks 2a-2c extend through the Base Year into Option Years 1 and 2

Task 3, Subtask 3a Summary reports based on observations made during each SSHAC kickoff meeting, workshop, and related meeting conducted for each proposed nuclear power plant site as well as during geologic field trips organized by the applicant.

Revised summary reports for SSHAC workshops, related meetings, and geologic field trips 2 weeks after completion of the SSHAC workshop or related meeting 2 weeks after receipt of comments from the NRC COR Electronic reports to the NRC in Microsoft Word Subtask 3a extends through the Base Year into Option Years 1 and 2 Task 3, Subtask 3b Final summary report combining all reports for individual SSHAC kickoff meetings, workshops, related meetings, and geologic field trips for each proposed nuclear power plant site.

Revised final summary report combining all individual SSHAC reports for each proposed nuclear power plant site.

4 weeks after the final SSHAC workshop or related meeting for each site 2 weeks after receipt of comments from the NRC COR Electronic reports to the NRC in Microsoft Word Subtask 3b extends through Option Years 1 and 2 Task 4, Subtask 4a Assist the NRC with preparation of initial draft guidance (DG-1) addressing assessment of potential hazards resulting from volcanic features and associated volcanic processes that incorporates comments from NRC staff, external stakeholders (if provided), and the ACRS for sending DG-1 out for formal comment by all interested stakeholders.

DG-1 incorporating all comments should be ready to send for formal comment by the end of the Base Year Email to the NRC COR that summarizes what was done to assist the NRC with Subtask 4a (RES will produce the version of DG-1 for public comment.)

Subtask 4a extends through the Base Year

31310018D0002_31310019F0022 P00002 9

Task and Subtask Numbers Description of Deliverables and Milestones Estimated Completion Dates for Deliverables and Milestones Required Media for Deliverables Anticipated Timing of Tasks Task 4, Subtask 4b Participate with NRC staff in a public meeting to discuss stakeholder comments on DG-1. Assist the NRC with reviewing and responding to stakeholder comments on DG-1 and preparing a second version of the draft guidance (DG-2) that incorporates stakeholder comments.

DG-2 incorporating all comments should be completed in Option Year 1 Email to the NRC COR that summarizes what was done to assist the NRC with Subtask 4b (RES will produce DG-2.)

Subtask 4b extends into Option Year 1 Task 4, Subtask 4c Assist the NRC with updating DG-2 based on comments from internal reviewers and interested stakeholders, including participation in a public meeting, if held, to discuss stakeholder comments for incorporation into the update of DG-2.

Updated DG-2 incorporating all comments should be completed in Option Year 1 Email to the NRC COR that summarizes what was done to assist the NRC with Subtask 4c (RES will produce updated DG-2.)

Subtask 4c extends into late Option Year 1 and possibly into early Option Year 2

Task 4, Subtask 4d Assist the NRC with preparation of the final Regulatory Guide based on comments from NRC staff and stakeholders and materials for incorporation related to endorsement of ANS 2.34. If a public meeting is held to discuss stakeholder comments, assist the NRC by participation in this meeting, Final Regulatory Guide to be completed near the end of Option Year 2

Email to NRC COR that summarizes what was done to assist the NRC with Subtask 4d (RES will produce the final Regulatory Guide.)

Subtask 4d completed near the end of Option Year 2 All Tasks Monthly Letter Status Reports (MLSRs) for all tasks per Section F.2 of the Base Contract.

20th day of the following month Electronic report to the NRC in Microsoft Word MLSRs for all tasks through Option Year 2

31310018D0002_31310019F0022 P00002 10 C.8 REQUIRED LABOR CATEGORIES The Contractor shall provide individuals who have the required educational background and work experience to meet the objectives of the work specified in this task order. Specific qualifications for this work include the following:

Project Manager The Contractors Project Manager (PM) shall have experience in managing work related to participation by CNWRA staff in SSHAC Level 2 or Level 3 workshops, or similar types of projects, and shall also be familiar with the entire SSHAC process. The Contractors PM shall support the work performed under all tasks of this task order in close coordination with the NRC COR.

Technical Subject Matter Expert The Technical Subject Matter Expert shall possess the expertise necessary for assessing potential hazards resulting from volcanic features and associated volcanic processes. The Technical Subject Matter Expert shall have experience in characterizing potential volcanic features and processes using the SSHAC process and performing probabilistic analyses for volcanic hazards. The Technical Subject Matter Expert shall support the work performed under Task 4 of this task order in close coordination with the NRC COR and the Contractors PM.

Clerical Assistant The Clerical Assistant shall have experience in providing assistance for the production of administrative and technical reports. The Contractors PM shall advise the Clerical Assistant regarding the format required for NRC deliverables as necessary.

31310018D0002_31310019F0022 P00002 11 Level of Effort Estimate This estimate for Level of Effort (LOE) is advisory only and should not be used as the sole basis for development of a staffing plan.

C.9 GOVERNMENT-FURNISHED PROPERTY AND MATERIAL The NRC COR will provide the Contractor with any needed pre-application materials received from the applicant that must be reviewed prior to attending a SSHAC workshop.

No other government-furnished materials or property are anticipated to be needed by the Contractor.

C.10 PLACE OF PERFORMANCE The work to be performed under this task order shall be performed at the Contractors main facility in San Antonio, TX, except for the travel described in Section C.11 of this statement of work. Any subcontractors and/or consultants may work from their locations, but are expected to travel to meeting locations. Some meetings are likely to take place at NRC Headquarters in Rockville, MD, but could also be held at the Contractors office in Rockville, MD.

C.11 SPECIAL CONSIDERATIONS TRAVEL Travel expenses consistent with the Federal Travel Regulation (FTR) and the limitation of

31310018D0002_31310019F0022 P00002 12 funds for this task order shall be authorized for the Contractor. All travel requires prior written approval from the NRC COR.

The following travel is anticipated under this task order. Travel for the Contractor related to Task 2 includes trips for observation of SSHAC kickoff meetings and workshops, final PPRP briefings, and geologic field trips organized by applicant. Meetings related to certain SHHAC studies will also involve travel by the technical subject matter expert in volcanology. Travel for the Contractor related to Task 4 includes trips necessary to assist the NRC with preparing draft and final regulatory guidance associated with assessment of volcanic hazards. The Contractor shall assume the following number of trips in the fiscal years shown to estimate travel costs:

31310018D0002_31310019F0022 P00002 13 Task Number and Subtask Purpose of Travel Fiscal Year Contract Year1 Travel Dates Number of Trips Number of Travelers Estimated Number of Travel Days Travel Destination2 2-Subtask 2a(SSHAC Project #1)

Observe SSHAC Project #1 Field Trip 2019 Base Year June 2019 1

1 3 with NRC COR approval Idaho Falls, ID 2 - Subtask 2a (SSHAC Study 2 -

UAMPS)

Observation of SSHAC Study 2 Kickoff Meeting 2020 Option Year 1 TBD based on applicants schedule 1 with NRC COR approval 2 (PM and Technical Specialist) with NRC COR approval 3 days with NRC COR approval Idaho Falls, ID 2-Subtask 2b (SSHAC Project

  1. 1, Workshop #1)

Observation of SSHAC Project 1, Workshop 1 2019 Base Year April 8-12, 2019 1 With NRC COR approval 1 (PM with NRC COR Approval) 5 days with NRC COR approval Walnut Creek, CA 2-Subtask 2b (SSHAC Project

  1. 1)

Observe SSHAC Project #2 Workshop 1 2020 Base Year August 12-17 1

1 6 days with NRC COR approval Walnut Creek, CA 2 - Subtask 2b (SSHAC Study 1 -

DOE INL)

Observation of SSHAC Study 1 Workshop 3 2021 Option Year 1 22-26 March 2021 1 with NRC COR approval 1 (PM) with NRC COR approval 5 days with NRC COR approval Walnut Creek, CA 2 - Subtask 2b (SSHAC Study 2 -

UAMPS)

Observation of SSHAC Study 2 Workshop 1 2020 or 2021 Option Year 1 TBD based on applicants schedule 1 with NRC COR approval 2 (PM and Technical Specialist) with NRC COR approval 5 days with NRC COR approval Idaho Falls, ID 2 - Subtask 2b (SSHAC Study 2 -

UAMPS)

Observation of SSHAC Study 2 Workshop 2, and geologic site trip 2021 Option Year 1 TBD based on applicants schedule 1 with NRC COR approval 2 (PM and Technical Specialist) with NRC COR approval 6 days with NRC COR approval Idaho Falls, ID

31310018D0002_31310019F0022 P00002 14 2 - Subtask 2c (SSHAC Study 1 -

DOE INL)

Observation of SSHAC Study 1 final PPRP briefing 2021 Option Year 2 27-30 July 2021 1 with NRC COR approval 1 (PM) with NRC COR approval 3 days with NRC COR approval Walnut Creek, CA 2-Subtask 2c (SSHAC Study 2 -

UAMPS)

Observation of SSHAC Study 2 final PPRP briefing 2022 Option Year 2 TBD based on applicants schedule 1 with NRC COR approval 2 (PM and Technical Specialist) with NRC COR approval 3 days with NRC COR approval Idaho Falls, ID Task Number and Subtask Purpose of Travel Fiscal Year Contract Year1 Travel Dates Number of Trips Number of Travelers Estimated Number of Travel Days Travel Destination2 4-Subtask 4a Attend kickoff and planning meeting in Rockville, MD at NRC headquarters or the Contractors office in Rockville, MD 2019 Base Year May 2019 1

2 (PM-Local travel by the Technical Specialist with NRC COR approval) 2 Meetings held at NRC Headquarters or the Contractors office in Rockville, MD.

4-Subtask 4a Writing session for Volcanic Hazard Guidance 2019 Base Year September 2019 1

1 2 days with NRC COR approval Meetings held at NRC headquarters or the Contractors office in Rockville, MD.

31310018D0002_31310019F0022 P00002 15 4 - Subtask 4a Writing

sessions, internal briefings (including the ACRS), and a preliminary public meeting for preparing initial draft guidance (DG-1) to send out for comment by stakeholders 2020 Base Year Preliminary public meeting (21 October 2019),

writing session (4 December 2019),

and ACRS briefing (20 February 2020) 3 with NRC COR approval 2 (PM - Local travel by the Technical Specialist) with NRC COR approval 6 days (2 for each trip) with NRC COR approval Meetings held at NRC Headquarters or the Contractors office in Rockville, MD 4 - Subtask 4b Public meeting to discuss stakeholder comments on DG-1, writing session to incorporate stakeholder comments on DG-1 and prepare a second draft guidance (DG-2) 2020 Option Year 1 Dates for a public meeting and a writing session to produce DG-2 are TBD 1 with NRC COR approval 2 (PM - Local travel by the Technical Specialist) with NRC COR approval 3 days with NRC COR approval Meetings held at NRC Headquarters or the Contractors office in Rockville, MD 4 - Subtask 4c Writing session to update DG-2 based on internal and stakeholder

comments, possibly with a public meeting to discuss comments 2020 or 2021 Option Years 1 or 2 Dates for a public meeting and a writing session to update DG-2 are TBD 1 with NRC COR approval 2 (PM - Local travel by the Technical Specialist) with NRC COR approval 3 days with NRC COR approval Meetings held at NRC Headquarters or the Contractors office in Rockville, MD

31310018D0002_31310019F0022 P00002 16 4 - Subtask 4d Writing session and public meeting to prepare Final Regulatory Guide incorporating the ANS 2.34 standard 2022 Option Year 2 Dates for a public meeting and a writing session to produce the final Regulatory Guide are TBD 1 with NRC COR approval 2 (PM - Local travel by the Technical Specialist) with NRC COR approval 3 days with NRC COR approval Meetings held at NRC Headquarters or the Contractors office in Rockville, MD NOTES:

1 Base Year covers FY19-Q3 through FY20-Q2 (01 April 2019 to 31 March 2020). Option Year 1 covers FY20-Q3 through FY21-Q2 (01 April 2020 to 31 March 2021). Option Year 2 covers FY21-Q3 through FY22-Q2 (01 April 2021 to 31 March 2022).

2 Travel destinations are assumptions for travel cost estimates only. Applicants will make the final decisions on specific travel destinations, as well as travel dates, for Task 2.

31310018D0002_31310019F0022 P00002 16 SECURITY The work performed under this task order will be UNCLASSIFIED.

KEY PERSONNEL Refer to Section H.2 2052.215-70 KEY PERSONNEL (JAN 1993)