ML20083J706: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:N8 | {{#Wiki_filter:N8 u. | ||
P.O. Box 5000 - CLEVELAND. OHIO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG - 55 PUBLIC SOUARE Serving The Best Location in the Nation MURRAY R. EDELMAN December 22, 1983 VICE PRESloENT NUCLE A R Mr. James G. Keppler Regional Administrator, Region III Of fice of Inspection and Enforcement U.S. Nuclear Regulatcry Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-44u; 50-441 Piping Support Supplied by Transamerica Delaval, Inc. | |||
P.O. Box 5000 - CLEVELAND. OHIO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG - 55 PUBLIC SOUARE Serving The Best Location in the Nation MURRAY R. EDELMAN | |||
[RDC 67(83)] | [RDC 67(83)] | ||
==Dear Mr. Keppler:== | ==Dear Mr. Keppler:== | ||
Our final report to you dated July 1, 1983, stated that the rework associated with ASME Code Section III, Class 3 piping supports supplied by Transamerica Delaval Inc. would be complete by December 1983. | Our final report to you dated July 1, 1983, stated that the rework associated with ASME Code Section III, Class 3 piping supports supplied by Transamerica Delaval Inc. would be complete by December 1983. | ||
Presently, all Unit I rework is complete and the document package review is in process. However, due to scheduling delays, the Unit 2 rework is now scheduled to be complete by February 7, 1984. | Presently, all Unit I rework is complete and the document package review is in process. However, due to scheduling delays, the Unit 2 rework is now scheduled to be complete by February 7, 1984. | ||
Please contact us if you have any questions. | Please contact us if you have any questions. | ||
Sincerely, f | Sincerely, f | ||
Murray R. Edelman Vice President Nuclear Group MRE:pab cc: | Murray R. Edelman Vice President Nuclear Group MRE:pab cc: | ||
75g I 0}} | Mr. M. L. Gildner NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. | ||
20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C. | |||
20555 8401050375 831222 DR ADOCK 05000440 Records Center, SEE-IN PDR Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 75g I 0}} | |||
Latest revision as of 06:40, 14 December 2024
| ML20083J706 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 12/22/1983 |
| From: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| RDC-67(83), NUDOCS 8401050375 | |
| Download: ML20083J706 (1) | |
Text
N8 u.
P.O. Box 5000 - CLEVELAND. OHIO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG - 55 PUBLIC SOUARE Serving The Best Location in the Nation MURRAY R. EDELMAN December 22, 1983 VICE PRESloENT NUCLE A R Mr. James G. Keppler Regional Administrator, Region III Of fice of Inspection and Enforcement U.S. Nuclear Regulatcry Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos.50-44u; 50-441 Piping Support Supplied by Transamerica Delaval, Inc.
[RDC 67(83)]
Dear Mr. Keppler:
Our final report to you dated July 1, 1983, stated that the rework associated with ASME Code Section III, Class 3 piping supports supplied by Transamerica Delaval Inc. would be complete by December 1983.
Presently, all Unit I rework is complete and the document package review is in process. However, due to scheduling delays, the Unit 2 rework is now scheduled to be complete by February 7, 1984.
Please contact us if you have any questions.
Sincerely, f
Murray R. Edelman Vice President Nuclear Group MRE:pab cc:
Mr. M. L. Gildner NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.
20555 8401050375 831222 DR ADOCK 05000440 Records Center, SEE-IN PDR Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 75g I 0